February 06, 2014 Error processing SSI file

Letting of 2/23/2005 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 240-01-0005
Parish: ST MARY
Routes: LA 83
Description: JUNCTION OF ROUTE LA 319 - IBERIA PARISH LINE JUNCTION
Type Const: class ii base course, pavement patching, pavement rehabilitation. solar powered
temporary traffic signal, and related work.
 
RankLicenseBidderAmount
118943 BULLIARD CONSTRUCTION CO. INC. $142,349.07
202074 CIRCLE, INC. $156,792.98
04089 H & S CONSTRUCTION CO., INC. IRREGULAR
 
Item Number Item Description Quantity Unit of Measure - 1 -
BULLIARD CONSTRUCTION CO. INC.
- 2 -
CIRCLE, INC.

H & S CONSTRUCTION CO., INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
302-02-C class ii base course (10" thick) 70.2    SQYD 27.41 1,924.18 29.00 2,035.80 50.00 3,510.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
574      CUYD 66.39 38,107.86 42.00 24,108.00 60.00 34,440.00    
602-02-A cleaning and resealing existing longitudinal pavement
joints
3,811      LNFT 1.52 5,792.72 3.30 12,576.30 12.00 45,732.00    
602-02-B cleaning and resealing existing transverse pavement
joints
5,590      LNFT 2.15 12,018.50 2.80 15,652.00 12.00 67,080.00    
602-03 cleaning and sealing random cracks 15      LNFT 3.21 48.15 19.75 296.25 4.00 60.00    
602-05-I-01 full depth patching of jointed conc pvmt (9" thick)
(16.0 sq yds & under)
107.2    SQYD 139.67 14,972.62 147.00 15,758.40 250.00 26,800.00    
602-05-I-02 full depth patching of jointed conc pvmt (9" thick)
(16.1 - 48.0 sq yds)
50.1    SQYD 109.50 5,485.95 163.00 8,166.30 250.00 12,525.00    
713-01 temporary signs & barricades lump      LUMP 16,892.44 16,892.44 2,100.00 2,100.00 18,000.00 18,000.00    
713-05-A-01 temporary pavement markings (solid line) (4" width)
(type 1 removable)
1.272  MILE 15,407.70 19,598.59 15,700.00 19,970.40 16,000.00 20,352.00    
727-01 mobilization lump      LUMP 9,804.90 9,804.90 38,500.00 38,500.00 20,000.00 20,000.00    
731-02 reflectorized raised pavement markers 332      EACH 6.07 2,015.24 6.20 2,058.40 6.25 2,075.00    
732-02-A plastic pavement striping (solid line) (4" width) 1.110  MILE 2,462.90 2,733.81 2,500.00 2,775.00 2,532.00 2,810.52    
732-03-A plastic pavement striping (broken line)(4" width) 1.143  MILE 770.39 880.55 785.00 897.25 702.00 802.38    
732-05 removal of existing markings 0.419  MILE 6,303.15 2,641.01 6,441.25 2,698.88 6,480.00 2,715.12    
740-01 construction layout lump      LUMP 1,611.97 1,611.97 1,200.00 1,200.00 8,000.00 8,000.00    
S-001 temporary traffic signal (solar powered) lump      lump 7,820.58 7,820.58 8,000.00 8,000.00 7,500.00 7,500.00    
                       
 CONTRACTOR TOTAL       142,349.07   156,792.98   IRREGULAR    