| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - H & S CONSTRUCTION CO., INC. |
- 2 - PRAIRIE CONTRACTORS INC. |
- 3 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
799   |
LNFT |
3.00 |
2,397.00 |
5.00 |
3,995.00 |
10.00 |
7,990.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
700   |
CUYD |
10.00 |
7,000.00 |
20.00 |
14,000.00 |
32.00 |
22,400.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
111   |
CUYD |
40.00 |
4,440.00 |
75.00 |
8,325.00 |
60.00 |
6,660.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
33,239.4 |
TON |
58.00 |
1,927,885.20 |
65.00 |
2,160,561.00 |
55.00 |
1,828,167.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
564.5 |
TON |
62.00 |
34,999.00 |
85.00 |
47,982.50 |
110.00 |
62,095.00 |
|
|
| 507-01-B |
asphaltic surface treatment (2 applications)
|
164,954   |
SQYD |
2.50 |
412,385.00 |
2.00 |
329,908.00 |
3.00 |
494,862.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
164,954   |
SQYD |
1.10 |
181,449.40 |
1.35 |
222,687.90 |
2.50 |
412,385.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 4,582   |
CUYD |
0.05 |
- 229.10 |
0.01 |
- 45.82 |
0.10 |
- 458.20 |
|
|
| 701-08 |
relaying pipe
|
8   |
LNFT |
150.00 |
1,200.00 |
300.00 |
2,400.00 |
450.00 |
3,600.00 |
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
50.0 |
LNFT |
57.50 |
2,875.00 |
50.00 |
2,500.00 |
45.00 |
2,250.00 |
|
|
| 704-03 |
blocked out guard rail
|
700.0 |
LNFT |
18.98 |
13,286.00 |
18.00 |
12,600.00 |
22.00 |
15,400.00 |
|
|
| 704-05 |
guard rail anchor sections (bct)
|
6.3 |
LNFT |
74.75 |
470.92 |
70.00 |
441.00 |
82.00 |
516.60 |
|
|
| 704-06 |
guard rail anchor sections (trailing end)
|
18.9 |
LNFT |
74.75 |
1,412.77 |
70.00 |
1,323.00 |
85.00 |
1,606.50 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
125.0 |
LNFT |
46.00 |
5,750.00 |
40.00 |
5,000.00 |
48.00 |
6,000.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
6   |
EACH |
2,127.00 |
12,762.00 |
2,000.00 |
12,000.00 |
2,200.00 |
13,200.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
70,000.00 |
70,000.00 |
150,000.00 |
150,000.00 |
50,000.00 |
50,000.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
22.587 |
MILE |
250.00 |
5,646.75 |
0.01 |
0.22 |
225.00 |
5,082.07 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
22.587 |
MILE |
276.00 |
6,234.01 |
300.00 |
6,776.10 |
275.00 |
6,211.42 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
45.174 |
MILE |
552.00 |
24,936.04 |
0.01 |
0.45 |
315.00 |
14,229.81 |
|
|
| 713-07 |
temporary reflectorized raised pavement markers
|
989   |
EACH |
5.69 |
5,627.41 |
0.01 |
9.89 |
2.00 |
1,978.00 |
|
|
| 724-01-C |
pavement patching (18" minimum thickness)
|
1,700   |
SQYD |
110.00 |
187,000.00 |
100.00 |
170,000.00 |
118.00 |
200,600.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
175,000.00 |
175,000.00 |
150,000.00 |
150,000.00 |
350,000.00 |
350,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
12   |
EACH |
63.25 |
759.00 |
60.00 |
720.00 |
80.00 |
960.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
10   |
EACH |
74.75 |
747.50 |
70.00 |
700.00 |
80.00 |
800.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
994   |
EACH |
5.87 |
5,834.78 |
4.00 |
3,976.00 |
6.00 |
5,964.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
15.058 |
MILE |
2,058.00 |
30,989.36 |
1,700.00 |
25,598.60 |
2,000.00 |
30,116.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
7.529 |
MILE |
785.00 |
5,910.26 |
600.00 |
4,517.40 |
850.00 |
6,399.65 |
|
|
| 735-01 |
mailboxes
|
169   |
EACH |
5.75 |
971.75 |
5.00 |
845.00 |
25.00 |
4,225.00 |
|
|
| 735-02 |
mailbox supports (single)
|
96   |
EACH |
149.00 |
14,304.00 |
120.00 |
11,520.00 |
225.00 |
21,600.00 |
|
|
| 735-03 |
mailbox supports (double)
|
11   |
EACH |
373.00 |
4,103.00 |
170.00 |
1,870.00 |
375.00 |
4,125.00 |
|
|
| 735-04 |
mailbox supports (multiple)
|
14   |
EACH |
373.00 |
5,222.00 |
300.00 |
4,200.00 |
450.00 |
6,300.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
50,000.00 |
50,000.00 |
|
|
| S-001 |
rumble strips (ground-in)
|
13.6 |
MILE |
724.00 |
9,846.40 |
600.00 |
8,160.00 |
1,300.00 |
17,680.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,171,215.45 |
|
3,382,571.24 |
|
3,652,944.85 |
|
|
|