| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
- 2 - BENTON & BROWN, LLC. |
- 3 - BEST-YET BUILDERS, LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
47   |
SQYD |
50.00 |
2,350.00 |
11.00 |
517.00 |
10.00 |
470.00 |
|
|
| 202-02-H |
removal of guard rail
|
296   |
LNFT |
3.50 |
1,036.00 |
4.00 |
1,184.00 |
3.00 |
888.00 |
|
|
| 202-02-I |
removal of asphalt surfacing from bridge decks
|
118   |
SQYD |
140.00 |
16,520.00 |
12.00 |
1,416.00 |
3.00 |
354.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
6,000   |
CUYD |
12.50 |
75,000.00 |
10.00 |
60,000.00 |
6.50 |
39,000.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
300   |
CUYD |
36.00 |
10,800.00 |
30.00 |
9,000.00 |
10.00 |
3,000.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
32,552.6 |
TON |
45.00 |
1,464,867.00 |
50.00 |
1,627,630.00 |
51.24 |
1,667,995.22 |
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
1,280.0 |
TON |
40.00 |
51,200.00 |
50.00 |
64,000.00 |
50.00 |
64,000.00 |
|
|
| 701-01-P/Q |
cross drain pipe (54" rcp/pcp or 60" cmp)
|
60   |
LNFT |
248.00 |
14,880.00 |
200.00 |
12,000.00 |
185.00 |
11,100.00 |
|
|
| 701-01-Q/S |
cross drain pipe (60" rcp/pcp or 72" cmp)
|
72   |
LNFT |
298.00 |
21,456.00 |
200.00 |
14,400.00 |
200.00 |
14,400.00 |
|
|
| 701-08 |
relaying pipe
|
68   |
LNFT |
145.00 |
9,860.00 |
50.00 |
3,400.00 |
85.00 |
5,780.00 |
|
|
| 701-10-G |
reinforced concrete pipe (extension)(18")
|
4   |
LNFT |
175.00 |
700.00 |
65.00 |
260.00 |
100.00 |
400.00 |
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
54   |
LNFT |
130.00 |
7,020.00 |
50.00 |
2,700.00 |
90.00 |
4,860.00 |
|
|
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
6   |
LNFT |
250.00 |
1,500.00 |
85.00 |
510.00 |
125.00 |
750.00 |
|
|
| 701-12-M |
corrugated metal pipe (extension)(36")
|
14   |
LNFT |
176.00 |
2,464.00 |
100.00 |
1,400.00 |
90.00 |
1,260.00 |
|
|
| 701-15 |
concrete collar
|
19   |
EACH |
900.00 |
17,100.00 |
600.00 |
11,400.00 |
300.00 |
5,700.00 |
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
100.0 |
LNFT |
32.00 |
3,200.00 |
45.00 |
4,500.00 |
50.00 |
5,000.00 |
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
76.0 |
LNFT |
45.00 |
3,420.00 |
70.00 |
5,320.00 |
66.00 |
5,016.00 |
|
|
| 704-03 |
blocked out guard rail
|
125.0 |
LNFT |
16.00 |
2,000.00 |
20.00 |
2,500.00 |
19.00 |
2,375.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
1,800.00 |
7,200.00 |
1,800.00 |
7,200.00 |
2,200.00 |
8,800.00 |
|
|
| 712-02 |
sacked concrete revetment
|
600   |
SQYD |
65.00 |
39,000.00 |
46.00 |
27,600.00 |
50.00 |
30,000.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
93,000.00 |
93,000.00 |
73,000.00 |
73,000.00 |
50,000.00 |
50,000.00 |
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
48   |
LNFT |
0.60 |
28.80 |
1.00 |
48.00 |
1.00 |
48.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
18.467 |
MILE |
265.00 |
4,893.75 |
300.00 |
5,540.10 |
300.00 |
5,540.10 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
3.387 |
MILE |
1.00 |
3.38 |
1.00 |
3.38 |
265.00 |
897.55 |
|
|
| 713-05-A |
temporary pavement markings (solid line)( 4" width)
|
68.848 |
MILE |
1.00 |
68.84 |
1.00 |
68.84 |
530.00 |
36,489.44 |
|
|
| 713-06-D |
temporary pavement legends and symbols (rr crossing)
|
4   |
EACH |
1.00 |
4.00 |
400.00 |
1,600.00 |
385.00 |
1,540.00 |
|
|
| 716-04-B |
mulch (fiber)
|
8.00 |
ACRE |
1.00 |
8.00 |
750.00 |
6,000.00 |
700.00 |
5,600.00 |
|
|
| 724-01-C |
pavement patching (8" minimum thickness)
|
2,670   |
SQYD |
35.00 |
93,450.00 |
40.00 |
106,800.00 |
40.00 |
106,800.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
93,000.00 |
93,000.00 |
125,000.00 |
125,000.00 |
150,000.00 |
150,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
8   |
EACH |
53.00 |
424.00 |
100.00 |
800.00 |
85.00 |
680.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
70.00 |
280.00 |
60.00 |
240.00 |
65.00 |
260.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,219   |
EACH |
4.50 |
5,485.50 |
6.00 |
7,314.00 |
5.61 |
6,838.59 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
22   |
LNFT |
2.40 |
52.80 |
3.00 |
66.00 |
3.41 |
75.02 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
35.082 |
MILE |
1,700.00 |
59,639.40 |
2,200.00 |
77,180.40 |
2,191.20 |
76,871.67 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.545 |
MILE |
600.00 |
927.00 |
900.00 |
1,390.50 |
749.10 |
1,157.35 |
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
2   |
EACH |
375.00 |
750.00 |
500.00 |
1,000.00 |
495.00 |
990.00 |
|
|
| 735-01 |
mailboxes
|
103   |
EACH |
1.00 |
103.00 |
60.00 |
6,180.00 |
30.00 |
3,090.00 |
|
|
| 735-02 |
mailbox supports (single)
|
47   |
EACH |
119.00 |
5,593.00 |
115.00 |
5,405.00 |
100.00 |
4,700.00 |
|
|
| 735-03 |
mailbox supports (double)
|
28   |
EACH |
168.00 |
4,704.00 |
175.00 |
4,900.00 |
125.00 |
3,500.00 |
|
|
| 739-01 |
hydro-seeding
|
8.00 |
ACRE |
850.00 |
6,800.00 |
1,500.00 |
12,000.00 |
1,000.00 |
8,000.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
12,500.00 |
12,500.00 |
26,000.00 |
26,000.00 |
12,000.00 |
12,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,133,288.47 |
|
2,317,473.22 |
|
2,346,225.94 |
|
|
|