DBE GOAL FED
Lead Project: 014-04-0042
Parish: ALLEN
Routes: US 165
Description: OAKDALE: S. CITY LIMITS - N. CITY LIMITS
Type Const: cold planing asphaltic concrete, pavement patching, superpave asphaltic concrete
overlay, and related work.
 
RankLicenseBidderAmount
112312 GILCHRIST CONSTRUCTION CO. LLC $1,657,774.46
205789 D & J CONSTRUCTION CO., INC. $1,685,802.97
300183 R. E. HEIDT CONSTRUCTION CO., INC. $1,948,673.90
434356 PRAIRIE CONTRACTORS INC. $2,015,530.84
512487 DIAMOND B CONSTRUCTION CO., L.L.C. $2,018,222.38
 
Item Number Item Description Quantity Unit of Measure - 1 -
GILCHRIST CONSTRUCTION CO. LLC
- 2 -
D & J CONSTRUCTION CO., INC.
- 3 -
R. E. HEIDT CONSTRUCTION CO., INC.
- 4 -
PRAIRIE CONTRACTORS INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
502-01 superpave asphaltic concrete 27,039.4    TON 47.00 1,270,851.80 47.75 1,291,131.35 53.20 1,438,496.08 54.50 1,473,647.30
502-01-A superpave asphaltic concrete, paved drives and
turnouts
274.0    TON 85.00 23,290.00 100.00 27,400.00 90.00 24,660.00 75.00 20,550.00
509-01 cold planing asphaltic pavement 118,418      SQYD 1.10 130,259.80 1.30 153,943.40 2.50 296,045.00 2.15 254,598.70
509-02 contractor retained reclaimed asphaltic pavement - 6,326      CUYD 1.00 - 6,326.00 0.01 - 63.26 1.00 - 6,326.00 0.01 - 63.26
713-01 temporary signs & barricades lump      LUMP 10,000.00 10,000.00 15,000.00 15,000.00 6,600.00 6,600.00 60,000.00 60,000.00
713-03-C temporary pavement markings (8" width) 3,000      LNFT 0.22 660.00 0.01 30.00 0.22 660.00 0.01 30.00
713-03-E temporary pavement markings (24" width) 3,126      LNFT 0.66 2,063.16 0.01 31.26 0.64 2,000.64 0.01 31.26
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
42.120  MILE 295.00 12,425.40 140.00 5,896.80 175.00 7,371.00 300.00 12,636.00
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
34.884  MILE 240.00 8,372.16 1.00 34.88 215.00 7,500.06 0.01 0.34
713-05-A temporary pavement markings (solid line)(4" width) 34.884  MILE 420.00 14,651.28 1.00 34.88 425.00 14,825.70 0.01 0.34
713-06-A temporary pavement legends and symbols (arrow) 138      EACH 52.00 7,176.00 0.01 1.38 55.00 7,590.00 0.01 1.38
713-06-D temporary pavement legends and symbols (rr crossing) 18      EACH 190.00 3,420.00 0.01 0.18 200.00 3,600.00 0.01 0.18
724-01-B pavement patching (12" minimum thickness) 750      SQYD 75.00 56,250.00 95.00 71,250.00 62.75 47,062.50 62.00 46,500.00
724-03 pavement joint repair 54.5    TON 140.00 7,630.00 275.00 14,987.50 300.00 16,350.00 100.00 5,450.00
727-01 mobilization lump      LUMP 60,000.00 60,000.00 30,000.00 30,000.00 21,000.00 21,000.00 85,000.00 85,000.00
731-02 reflectorized raised pavement markers 1,459      EACH 4.50 6,565.50 6.50 9,483.50 4.50 6,565.50 4.70 6,857.30
732-01-C plastic pavement striping (8" width) 1,000      LNFT 0.90 900.00 2.25 2,250.00 0.85 850.00 0.90 900.00
732-01-E plastic pavement striping (24" width) 1,042      LNFT 2.50 2,605.00 3.25 3,386.50 2.55 2,657.10 2.65 2,761.30
732-02-A plastic pavement striping (solid line) (4" width) 11.628  MILE 1,750.00 20,349.00 2,400.00 27,907.20 1,800.00 20,930.40 1,800.00 20,930.40
732-03-A plastic pavement striping (broken line)(4" width) 11.628  MILE 620.00 7,209.36 550.00 6,395.40 640.00 7,441.92 700.00 8,139.60
732-04-A plastic pavement legends & symbols (arrow) 46      EACH 135.00 6,210.00 175.00 8,050.00 135.00 6,210.00 140.00 6,440.00
732-04-D plastic pavement legends & symbols (rr crossing) 6      EACH 385.00 2,310.00 525.00 3,150.00 400.00 2,400.00 450.00 2,700.00
735-01 mailboxes 2      EACH 1.00 2.00 1.00 2.00 7.00 14.00 10.00 20.00
735-02 mailbox supports (single) 2      EACH 250.00 500.00 500.00 1,000.00 550.00 1,100.00 1,000.00 2,000.00
740-01 construction layout lump      LUMP 5,000.00 5,000.00 10,000.00 10,000.00 6,500.00 6,500.00 100.00 100.00
S-001 rumble strips (ground-in) 0.9    MILE 6,000.00 5,400.00 5,000.00 4,500.00 7,300.00 6,570.00 7,000.00 6,300.00
                       
 CONTRACTOR TOTAL       1,657,774.46   1,685,802.97   1,948,673.90   2,015,530.84
 
Item Number Item Description Quantity Unit of Measure - 5 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
502-01 superpave asphaltic concrete 27,039.4    TON 52.42 1,417,405.34            
502-01-A superpave asphaltic concrete, paved drives and
turnouts
274.0    TON 52.42 14,363.08            
509-01 cold planing asphaltic pavement 118,418      SQYD 1.77 209,599.86            
509-02 contractor retained reclaimed asphaltic pavement - 6,326      CUYD 0.10 - 632.60            
713-01 temporary signs & barricades lump      LUMP 26,100.00 26,100.00            
713-03-C temporary pavement markings (8" width) 3,000      LNFT 0.20 600.00            
713-03-E temporary pavement markings (24" width) 3,126      LNFT 0.61 1,906.86            
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
42.120  MILE 155.00 6,528.60            
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
34.884  MILE 204.00 7,116.33            
713-05-A temporary pavement markings (solid line)(4" width) 34.884  MILE 408.00 14,232.67            
713-06-A temporary pavement legends and symbols (arrow) 138      EACH 51.00 7,038.00            
713-06-D temporary pavement legends and symbols (rr crossing) 18      EACH 184.00 3,312.00            
724-01-B pavement patching (12" minimum thickness) 750      SQYD 89.43 67,072.50            
724-03 pavement joint repair 54.5    TON 152.00 8,284.00            
727-01 mobilization lump      LUMP 180,000.00 180,000.00            
731-02 reflectorized raised pavement markers 1,459      EACH 4.34 6,332.06            
732-01-C plastic pavement striping (8" width) 1,000      LNFT 0.82 820.00            
732-01-E plastic pavement striping (24" width) 1,042      LNFT 2.45 2,552.90            
732-02-A plastic pavement striping (solid line) (4" width) 11.628  MILE 1,734.00 20,162.95            
732-03-A plastic pavement striping (broken line)(4" width) 11.628  MILE 612.00 7,116.33            
732-04-A plastic pavement legends & symbols (arrow) 46      EACH 128.00 5,888.00            
732-04-D plastic pavement legends & symbols (rr crossing) 6      EACH 383.00 2,298.00            
735-01 mailboxes 2      EACH 14.00 28.00            
735-02 mailbox supports (single) 2      EACH 495.00 990.00            
740-01 construction layout lump      LUMP 4,900.00 4,900.00            
S-001 rumble strips (ground-in) 0.9    MILE 4,675.00 4,207.50            
                       
 CONTRACTOR TOTAL       2,018,222.38            