| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - BOH BROS. CONSTRUCTION CO., LLC. |
- 3 - BARRIERE CONSTRUCTION CO., LLC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-E |
removal of concrete curbs
|
56.8 |
LNFT |
3.00 |
170.40 |
10.00 |
568.00 |
12.00 |
681.60 |
|
|
| 202-02-I |
removal of asphalt island
|
16.4 |
SQYD |
75.00 |
1,230.00 |
20.00 |
328.00 |
30.00 |
492.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
1,333   |
CUYD |
11.00 |
14,663.00 |
8.00 |
10,664.00 |
11.00 |
14,663.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
161   |
EACH |
11.00 |
1,771.00 |
7.00 |
1,127.00 |
5.50 |
885.50 |
|
|
| 204-06 |
temporary silt fencing
|
14,680   |
LNFT |
1.31 |
19,230.80 |
1.50 |
22,020.00 |
0.40 |
5,872.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
3,707.5 |
TON |
53.15 |
197,053.62 |
56.00 |
207,620.00 |
59.00 |
218,742.50 |
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
428.5 |
TON |
129.77 |
55,606.44 |
100.00 |
42,850.00 |
59.00 |
25,281.50 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
3,144   |
SQYD |
4.00 |
12,576.00 |
1.50 |
4,716.00 |
7.00 |
22,008.00 |
|
|
| 701-05-G |
side drain pipe (18")
|
550   |
LNFT |
51.00 |
28,050.00 |
62.00 |
34,100.00 |
55.00 |
30,250.00 |
|
|
| 701-05-I |
side drain pipe (24")
|
40   |
LNFT |
74.00 |
2,960.00 |
69.00 |
2,760.00 |
80.00 |
3,200.00 |
|
|
| 701-10-G |
reinforced concrete pipe (extension)(18")
|
88   |
LNFT |
78.00 |
6,864.00 |
62.00 |
5,456.00 |
87.00 |
7,656.00 |
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
152   |
LNFT |
89.00 |
13,528.00 |
73.00 |
11,096.00 |
100.00 |
15,200.00 |
|
|
| 701-10-M |
reinforced concrete pipe (extension)(36")
|
16   |
LNFT |
142.00 |
2,272.00 |
140.00 |
2,240.00 |
160.00 |
2,560.00 |
|
|
| 701-12-G |
corrugated metal pipe (extension)(18")
|
11   |
LNFT |
104.00 |
1,144.00 |
74.00 |
814.00 |
120.00 |
1,320.00 |
|
|
| 701-12-I |
corrugated metal pipe (extension)(24")
|
69   |
LNFT |
115.00 |
7,935.00 |
110.00 |
7,590.00 |
130.00 |
8,970.00 |
|
|
| 701-12-K |
corrugated metal pipe (extension)(30")
|
16   |
LNFT |
125.00 |
2,000.00 |
120.00 |
1,920.00 |
140.00 |
2,240.00 |
|
|
| 701-13-B |
corrugated metal pipe arch (extension)(18" equiv.)
|
49   |
LNFT |
105.00 |
5,145.00 |
74.00 |
3,626.00 |
130.00 |
6,370.00 |
|
|
| 701-13-D |
corrugated metal pipe arch (extension)(24" equiv.)
|
52   |
LNFT |
12.00 |
624.00 |
110.00 |
5,720.00 |
140.00 |
7,280.00 |
|
|
| 701-15 |
concrete collar
|
14   |
EACH |
750.00 |
10,500.00 |
320.00 |
4,480.00 |
800.00 |
11,200.00 |
|
|
| 702-02-A |
manholes (mh-06)
|
1   |
EACH |
4,000.00 |
4,000.00 |
6,150.00 |
6,150.00 |
4,000.00 |
4,000.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
21   |
EACH |
3,200.00 |
67,200.00 |
2,700.00 |
56,700.00 |
3,300.00 |
69,300.00 |
|
|
| 702-03-B |
catch basins (cb-02)
|
1   |
EACH |
4,200.00 |
4,200.00 |
4,350.00 |
4,350.00 |
4,500.00 |
4,500.00 |
|
|
| 702-08-A |
side drain safety end (type 1)
|
51   |
EACH |
1,300.00 |
66,300.00 |
1,475.00 |
75,225.00 |
1,400.00 |
71,400.00 |
|
|
| 702-08-B |
side drain safety end (type 2)
|
8   |
EACH |
2,900.00 |
23,200.00 |
3,650.00 |
29,200.00 |
3,000.00 |
24,000.00 |
|
|
| 707-01 |
concrete curb
|
38.2 |
LNFT |
32.00 |
1,222.40 |
55.00 |
2,101.00 |
40.00 |
1,528.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
40,000.00 |
40,000.00 |
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
300   |
LNFT |
0.42 |
126.00 |
0.40 |
120.00 |
1.00 |
300.00 |
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
208   |
LNFT |
1.25 |
260.00 |
1.30 |
270.40 |
2.00 |
416.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
11.120 |
MILE |
136.00 |
1,512.32 |
400.00 |
4,448.00 |
140.00 |
1,556.80 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
4.972 |
MILE |
282.00 |
1,402.10 |
300.00 |
1,491.60 |
50.00 |
248.60 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
10.664 |
MILE |
500.00 |
5,332.00 |
500.00 |
5,332.00 |
100.00 |
1,066.40 |
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
112   |
EACH |
52.00 |
5,824.00 |
35.00 |
3,920.00 |
60.00 |
6,720.00 |
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
4   |
EACH |
52.00 |
208.00 |
35.00 |
140.00 |
60.00 |
240.00 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
122   |
SQYD |
106.00 |
12,932.00 |
70.00 |
8,540.00 |
70.00 |
8,540.00 |
|
|
| 724-02 |
pavement widening
|
12,455.8 |
SQYD |
28.00 |
348,762.40 |
32.50 |
404,813.50 |
40.00 |
498,232.00 |
|
|
| 726-01 |
bedding material
|
163.2 |
CUYD |
47.00 |
7,670.40 |
67.00 |
10,934.40 |
50.00 |
8,160.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
18,000.00 |
18,000.00 |
100,000.00 |
100,000.00 |
130,000.00 |
130,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
73.00 |
292.00 |
100.00 |
400.00 |
80.00 |
320.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
851   |
EACH |
5.00 |
4,255.00 |
5.00 |
4,255.00 |
5.00 |
4,255.00 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
150   |
LNFT |
1.00 |
150.00 |
1.00 |
150.00 |
2.00 |
300.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
104   |
LNFT |
3.00 |
312.00 |
3.00 |
312.00 |
4.00 |
416.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
5.332 |
MILE |
1,875.00 |
9,997.50 |
1,900.00 |
10,130.80 |
1,800.00 |
9,597.60 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.486 |
MILE |
766.00 |
1,904.27 |
750.00 |
1,864.50 |
800.00 |
1,988.80 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
56   |
EACH |
130.00 |
7,280.00 |
125.00 |
7,000.00 |
140.00 |
7,840.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
2   |
EACH |
283.00 |
566.00 |
135.00 |
270.00 |
140.00 |
280.00 |
|
|
| 735-01 |
mailboxes
|
35   |
EACH |
15.00 |
525.00 |
2.00 |
70.00 |
5.00 |
175.00 |
|
|
| 735-02 |
mailbox supports (single)
|
35   |
EACH |
100.00 |
3,500.00 |
70.00 |
2,450.00 |
120.00 |
4,200.00 |
|
|
| 736-09 |
loop detector
|
150   |
LNFT |
12.50 |
1,875.00 |
13.00 |
1,950.00 |
13.00 |
1,950.00 |
|
|
| 736-10 |
underground junction box
|
1   |
each |
525.00 |
525.00 |
500.00 |
500.00 |
600.00 |
600.00 |
|
|
| 739-01 |
hydro-seeding
|
1.68 |
ACRE |
1,500.00 |
2,520.00 |
1,500.00 |
2,520.00 |
1,200.00 |
2,016.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
5,000.00 |
5,000.00 |
15,000.00 |
15,000.00 |
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
4.61 |
CUYD |
1,000.00 |
4,610.00 |
1,900.00 |
8,759.00 |
1,100.00 |
5,071.00 |
|
|
| 805-12-A |
reinforced concrete box culverts (4'x 3')
|
32.0 |
LNFT |
314.00 |
10,048.00 |
300.00 |
9,600.00 |
350.00 |
11,200.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
274   |
LB |
1.05 |
287.70 |
2.50 |
685.00 |
2.00 |
548.00 |
|
|
| S-001 |
u-channel post installation
|
32   |
EACH |
47.00 |
1,504.00 |
70.00 |
2,240.00 |
60.00 |
1,920.00 |
|
|
| S-002 |
cleaning existing ditches
|
1,700   |
LNFT |
2.62 |
4,454.00 |
1.50 |
2,550.00 |
6.00 |
10,200.00 |
|
|
| S-003 |
surface preparation
|
lump |
lump |
2,800.00 |
2,800.00 |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
|
|
| S-004 |
relocating ditches
|
200   |
LNFT |
5.24 |
1,048.00 |
3.00 |
600.00 |
7.00 |
1,400.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,039,928.35 |
|
1,184,737.20 |
|
1,359,357.30 |
|
|
|