Lead Project: 809-08-0033
Parish: CADDO
Routes: LA 526
Description: INDUSTRIAL LOOP RIGHT TURN LANES
Type Const: class ii base course, superpave asph conc pvmt, portland cement concrete pavement,
and related work.
 
RankLicenseBidderAmount
112135 BLOUNT BROS. CONSTRUCTION, INC. $207,281.40
228218 F. J. BURNELL, INC. $215,941.15
318546 C,W & W CONTRACTORS, INC. $239,185.00
436374 BEST-YET BUILDERS, LLC $240,099.20
 
Item Number Item Description Quantity Unit of Measure - 1 -
BLOUNT BROS. CONSTRUCTION, INC.
- 2 -
F. J. BURNELL, INC.
- 3 -
C,W & W CONTRACTORS, INC.
- 4 -
BEST-YET BUILDERS, LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-C removal of portland cement concrete pavement 59      SQYD 10.00 590.00 35.00 2,065.00 20.00 1,180.00 10.00 590.00
202-02-E removal of concrete curbs 613.0    LNFT 6.00 3,678.00 10.00 6,130.00 10.00 6,130.00 15.00 9,195.00
202-02-G removal of surfacing & stabilized base 435.0    SQYD 9.00 3,915.00 5.00 2,175.00 8.00 3,480.00 15.00 6,525.00
203-06 excavation & embankment lump      LUMP 7,000.00 7,000.00 5,000.00 5,000.00 15,000.00 15,000.00 10,000.00 10,000.00
302-02-E class ii base course (8" thick) 2,673.8    SQYD 10.00 26,738.00 13.00 34,759.40 17.00 45,454.60 14.00 37,433.20
502-01 superpave asphaltic concrete 144.0    TON 150.00 21,600.00 135.00 19,440.00 156.00 22,464.00 100.00 14,400.00
601-01-I portland cement concrete pavement (9" thick) 1,736.1    SQYD 54.00 93,749.40 55.00 95,485.50 50.00 86,805.00 60.00 104,166.00
702-04-B adjusting catch basins 2      EACH 2,000.00 4,000.00 2,000.00 4,000.00 1,500.00 3,000.00 2,000.00 4,000.00
706-03-A incidental concrete paving (4" thick) 37.8    SQYD 40.00 1,512.00 75.00 2,835.00 150.00 5,670.00 50.00 1,890.00
707-01 concrete curb 754.0    LNFT 6.00 4,524.00 5.00 3,770.00 10.00 7,540.00 20.00 15,080.00
713-01 temporary signs & barricades lump      LUMP 10,000.00 10,000.00 10,000.00 10,000.00 12,000.00 12,000.00 10,000.00 10,000.00
727-01 mobilization lump      LUMP 10,000.00 10,000.00 15,000.00 15,000.00 15,000.00 15,000.00 10,000.00 10,000.00
731-02 reflectorized raised pavement markers 48      EACH 10.00 480.00 6.00 288.00 8.00 384.00 6.00 288.00
732-01-A plastic pavement striping (4" width) 1,521      LNFT 1.00 1,521.00 0.55 836.55 0.60 912.60 1.00 1,521.00
732-01-C plastic pavement striping (8" width) 234      LNFT 2.00 468.00 1.05 245.70 1.20 280.80 1.50 351.00
732-01-E plastic pavement striping (24" width) 100      LNFT 4.00 400.00 3.25 325.00 3.70 370.00 3.25 325.00
732-04-A plastic pavement legends & symbols (arrow) 3      EACH 200.00 600.00 140.00 420.00 200.00 600.00 175.00 525.00
732-04-C plastic pavement legends & symbols (only) 3      EACH 200.00 600.00 150.00 450.00 225.00 675.00 175.00 525.00
732-05-A removal of existing markings lump      LUMP 2,000.00 2,000.00 3,000.00 3,000.00 3,125.00 3,125.00 3,500.00 3,500.00
739-01 hydro-seeding 0.40   ACRE 3,000.00 1,200.00 4,000.00 1,600.00 1,900.00 760.00 2,000.00 800.00
740-01 construction layout lump      LUMP 10,000.00 10,000.00 3,000.00 3,000.00 5,500.00 5,500.00 5,000.00 5,000.00
805-01-B class a concrete (box culvert headwalls) 2.41   CUYD 1,000.00 2,410.00 2,000.00 4,820.00 1,000.00 2,410.00 1,500.00 3,615.00
806-01 deformed reinforcing steel 148      LB 2.00 296.00 2.00 296.00 3.00 444.00 2.50 370.00
                       
 CONTRACTOR TOTAL       207,281.40   215,941.15   239,185.00   240,099.20