| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - W. E. MCDONALD & SON, LLC. |
- 2 - GUINN BROTHERS, LLC. |
- 3 - SHILOH CONTRACTORS, INC. |
- 4 - GULF SOUTH PILING & CONST., INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
12,000.00 |
12,000.00 |
15,000.00 |
15,000.00 |
16,000.00 |
16,000.00 |
10,000.00 |
10,000.00 |
| 202-02-A-01 |
removal of bridge(sta.106+60.63;22'w x 77'l,timber
bridge) |
1   |
EACH |
6,200.00 |
6,200.00 |
6,000.00 |
6,000.00 |
2,850.00 |
2,850.00 |
10,000.00 |
10,000.00 |
| 202-02-A-02 |
removal of bridge(sta.108+68.83;19'w x 58'l,timber
piles & caps w/precast concrete deck) |
1   |
EACH |
6,200.00 |
6,200.00 |
5,000.00 |
5,000.00 |
2,200.00 |
2,200.00 |
7,500.00 |
7,500.00 |
| 202-02-A-03 |
removal of bridge(sta.119+33.00;20'w x 52'l,timber
piles & caps w/precast concrete deck) |
1   |
EACH |
6,200.00 |
6,200.00 |
5,000.00 |
5,000.00 |
2,850.00 |
2,850.00 |
7,500.00 |
7,500.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
499.3 |
SQYD |
8.00 |
3,994.40 |
4.00 |
1,997.20 |
5.00 |
2,496.50 |
5.00 |
2,496.50 |
| 203-06 |
excavation & embankment
|
lump |
LUMP |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
27,000.00 |
27,000.00 |
45,000.00 |
45,000.00 |
| 204-02 |
temporary hay or straw bales
|
16   |
EACH |
10.00 |
160.00 |
10.00 |
160.00 |
1.00 |
16.00 |
15.00 |
240.00 |
| 204-03 |
temporary slope drains
|
360   |
LNFT |
6.00 |
2,160.00 |
FREE |
FREE |
1.00 |
360.00 |
10.00 |
3,600.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
12   |
EACH |
250.00 |
3,000.00 |
100.00 |
1,200.00 |
1.00 |
12.00 |
125.00 |
1,500.00 |
| 204-06 |
temporary silt fencing
|
2,024   |
LNFT |
2.50 |
5,060.00 |
1.50 |
3,036.00 |
2.75 |
5,566.00 |
1.50 |
3,036.00 |
| 302-01-A |
class ii base course (stone or recycled pcc)
|
251.1 |
CUYD |
58.00 |
14,563.80 |
95.00 |
23,854.50 |
75.00 |
18,832.50 |
90.00 |
22,599.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
6   |
CUYD |
250.00 |
1,500.00 |
100.00 |
600.00 |
110.00 |
660.00 |
150.00 |
900.00 |
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
83.3 |
CUYD |
65.00 |
5,414.50 |
1.00 |
83.30 |
70.00 |
5,831.00 |
100.00 |
8,330.00 |
| 502-01 |
superpave asphaltic concrete
|
208.3 |
TON |
125.00 |
26,037.50 |
140.00 |
29,162.00 |
125.00 |
26,037.50 |
210.00 |
43,743.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
300.0 |
LNFT |
52.50 |
15,750.00 |
58.00 |
17,400.00 |
40.00 |
12,000.00 |
40.00 |
12,000.00 |
| 704-09 |
guard rail anchor sections (turndown)
|
300.0 |
LNFT |
27.00 |
8,100.00 |
32.00 |
9,600.00 |
45.00 |
13,500.00 |
45.00 |
13,500.00 |
| 705-05 |
double swinging driveway gate
|
1   |
DBGT |
600.00 |
600.00 |
1,000.00 |
1,000.00 |
750.00 |
750.00 |
750.00 |
750.00 |
| 711-01-C |
riprap (30 lb, 14" thick)
|
680   |
SQYD |
40.00 |
27,200.00 |
45.00 |
30,600.00 |
40.00 |
27,200.00 |
50.00 |
34,000.00 |
| 711-04 |
geotextile fabric
|
680   |
SQYD |
2.50 |
1,700.00 |
2.00 |
1,360.00 |
2.50 |
1,700.00 |
3.00 |
2,040.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
16,500.00 |
16,500.00 |
15,000.00 |
15,000.00 |
9,000.00 |
9,000.00 |
20,000.00 |
20,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
10,000.00 |
10,000.00 |
30,000.00 |
30,000.00 |
70,000.00 |
70,000.00 |
69,000.00 |
69,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
24   |
EACH |
70.00 |
1,680.00 |
75.00 |
1,800.00 |
70.00 |
1,680.00 |
70.00 |
1,680.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
5,000.00 |
5,000.00 |
7,000.00 |
7,000.00 |
11,000.00 |
11,000.00 |
16,000.00 |
16,000.00 |
| 804-01-B |
precast concrete piles (14")
|
3,486   |
LNFT |
32.00 |
111,552.00 |
34.00 |
118,524.00 |
42.00 |
146,412.00 |
34.00 |
118,524.00 |
| 804-12 |
loading permanent piles
|
3   |
EACH |
1.00 |
3.00 |
1.00 |
3.00 |
FREE |
FREE |
500.00 |
1,500.00 |
| 805-10-A |
bridge superstructure & substructure(90 degree
crossing,24'clear roadway) |
7   |
SPAN |
17,000.00 |
119,000.00 |
17,500.00 |
122,500.00 |
18,000.00 |
126,000.00 |
17,500.00 |
122,500.00 |
| 805-10-B |
bridge superstructure & substructure(60 degree
crossing; 24'clear roadway) |
5   |
SPAN |
17,000.00 |
85,000.00 |
17,500.00 |
87,500.00 |
19,000.00 |
95,000.00 |
18,000.00 |
90,000.00 |
| S-101 |
concrete approach slabs(90 degree crossing; 24'clear
roadway) (w/out asphalt) |
4   |
EACH |
7,000.00 |
28,000.00 |
6,500.00 |
26,000.00 |
7,000.00 |
28,000.00 |
5,000.00 |
20,000.00 |
| S-102 |
concrete approach slabs(60 degree crossing; 24'clear
roadway) (w/out asphalt) |
2   |
EACH |
7,000.00 |
14,000.00 |
6,500.00 |
13,000.00 |
7,000.00 |
14,000.00 |
5,500.00 |
11,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
556,575.20 |
|
597,380.00 |
|
666,953.50 |
|
698,938.50 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - KOSTMAYER CONSTRUCTION, LLC |
- 6 - F. MILLER & SONS, LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
27,500.00 |
27,500.00 |
30,000.00 |
30,000.00 |
|
|
|
|
| 202-02-A-01 |
removal of bridge(sta.106+60.63;22'w x 77'l,timber
bridge) |
1   |
EACH |
7,000.00 |
7,000.00 |
34,000.00 |
34,000.00 |
|
|
|
|
| 202-02-A-02 |
removal of bridge(sta.108+68.83;19'w x 58'l,timber
piles & caps w/precast concrete deck) |
1   |
EACH |
7,000.00 |
7,000.00 |
27,000.00 |
27,000.00 |
|
|
|
|
| 202-02-A-03 |
removal of bridge(sta.119+33.00;20'w x 52'l,timber
piles & caps w/precast concrete deck) |
1   |
EACH |
7,000.00 |
7,000.00 |
27,000.00 |
27,000.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
499.3 |
SQYD |
9.00 |
4,493.70 |
7.00 |
3,495.10 |
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
35,000.00 |
35,000.00 |
60,000.00 |
60,000.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
16   |
EACH |
12.00 |
192.00 |
10.00 |
160.00 |
|
|
|
|
| 204-03 |
temporary slope drains
|
360   |
LNFT |
8.00 |
2,880.00 |
9.00 |
3,240.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
12   |
EACH |
290.00 |
3,480.00 |
125.00 |
1,500.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
2,024   |
LNFT |
2.50 |
5,060.00 |
1.35 |
2,732.40 |
|
|
|
|
| 302-01-A |
class ii base course (stone or recycled pcc)
|
251.1 |
CUYD |
75.00 |
18,832.50 |
47.00 |
11,801.70 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
6   |
CUYD |
60.00 |
360.00 |
55.00 |
330.00 |
|
|
|
|
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
83.3 |
CUYD |
60.00 |
4,998.00 |
48.00 |
3,998.40 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
208.3 |
TON |
185.00 |
38,535.50 |
215.00 |
44,784.50 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
300.0 |
LNFT |
48.00 |
14,400.00 |
52.00 |
15,600.00 |
|
|
|
|
| 704-09 |
guard rail anchor sections (turndown)
|
300.0 |
LNFT |
54.00 |
16,200.00 |
27.00 |
8,100.00 |
|
|
|
|
| 705-05 |
double swinging driveway gate
|
1   |
DBGT |
550.00 |
550.00 |
2,000.00 |
2,000.00 |
|
|
|
|
| 711-01-C |
riprap (30 lb, 14" thick)
|
680   |
SQYD |
46.00 |
31,280.00 |
40.00 |
27,200.00 |
|
|
|
|
| 711-04 |
geotextile fabric
|
680   |
SQYD |
2.00 |
1,360.00 |
3.00 |
2,040.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
21,500.00 |
21,500.00 |
58,000.00 |
58,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
72,000.00 |
72,000.00 |
70,000.00 |
70,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
24   |
EACH |
90.00 |
2,160.00 |
70.00 |
1,680.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
13,000.00 |
13,000.00 |
31,000.00 |
31,000.00 |
|
|
|
|
| 804-01-B |
precast concrete piles (14")
|
3,486   |
LNFT |
35.00 |
122,010.00 |
34.40 |
119,918.40 |
|
|
|
|
| 804-12 |
loading permanent piles
|
3   |
EACH |
100.00 |
300.00 |
100.00 |
300.00 |
|
|
|
|
| 805-10-A |
bridge superstructure & substructure(90 degree
crossing,24'clear roadway) |
7   |
SPAN |
20,000.00 |
140,000.00 |
12,500.00 |
87,500.00 |
|
|
|
|
| 805-10-B |
bridge superstructure & substructure(60 degree
crossing; 24'clear roadway) |
5   |
SPAN |
20,000.00 |
100,000.00 |
13,700.00 |
68,500.00 |
|
|
|
|
| S-101 |
concrete approach slabs(90 degree crossing; 24'clear
roadway) (w/out asphalt) |
4   |
EACH |
7,000.00 |
28,000.00 |
7,000.00 |
28,000.00 |
|
|
|
|
| S-102 |
concrete approach slabs(60 degree crossing; 24'clear
roadway) (w/out asphalt) |
2   |
EACH |
7,000.00 |
14,000.00 |
7,000.00 |
14,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
739,091.70 |
|
783,880.50 |
|
|
|
|
|