DBE GOAL FED
Lead Project: 713-06-0117
Parish: BEAUREGARD
Routes:
Description: BRIDGES ON HAUSER, GREENTOWN, AND SMYRNA ROADS.
Type Const: grading, class ii base course, superpave asph conc pvmt., concrete slab span bridges,
and related work.
 
RankLicenseBidderAmount
108815 W. E. MCDONALD & SON, LLC. $556,575.20
209090 GUINN BROTHERS, LLC. $597,380.00
312136 SHILOH CONTRACTORS, INC. $666,953.50
415288 GULF SOUTH PILING & CONST., INC. $698,938.50
525747 KOSTMAYER CONSTRUCTION, LLC $739,091.70
600060 F. MILLER & SONS, LLC $783,880.50
 
Item Number Item Description Quantity Unit of Measure - 1 -
W. E. MCDONALD & SON, LLC.
- 2 -
GUINN BROTHERS, LLC.
- 3 -
SHILOH CONTRACTORS, INC.
- 4 -
GULF SOUTH PILING & CONST., INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 12,000.00 12,000.00 15,000.00 15,000.00 16,000.00 16,000.00 10,000.00 10,000.00
202-02-A-01 removal of bridge(sta.106+60.63;22'w x 77'l,timber
bridge)
1      EACH 6,200.00 6,200.00 6,000.00 6,000.00 2,850.00 2,850.00 10,000.00 10,000.00
202-02-A-02 removal of bridge(sta.108+68.83;19'w x 58'l,timber
piles & caps w/precast concrete deck)
1      EACH 6,200.00 6,200.00 5,000.00 5,000.00 2,200.00 2,200.00 7,500.00 7,500.00
202-02-A-03 removal of bridge(sta.119+33.00;20'w x 52'l,timber
piles & caps w/precast concrete deck)
1      EACH 6,200.00 6,200.00 5,000.00 5,000.00 2,850.00 2,850.00 7,500.00 7,500.00
202-02-G removal of surfacing & stabilized base 499.3    SQYD 8.00 3,994.40 4.00 1,997.20 5.00 2,496.50 5.00 2,496.50
203-06 excavation & embankment lump      LUMP 20,000.00 20,000.00 25,000.00 25,000.00 27,000.00 27,000.00 45,000.00 45,000.00
204-02 temporary hay or straw bales 16      EACH 10.00 160.00 10.00 160.00 1.00 16.00 15.00 240.00
204-03 temporary slope drains 360      LNFT 6.00 2,160.00 FREE FREE 1.00 360.00 10.00 3,600.00
204-05-A temporary sediment check dams (hay) 12      EACH 250.00 3,000.00 100.00 1,200.00 1.00 12.00 125.00 1,500.00
204-06 temporary silt fencing 2,024      LNFT 2.50 5,060.00 1.50 3,036.00 2.75 5,566.00 1.50 3,036.00
302-01-A class ii base course (stone or recycled pcc) 251.1    CUYD 58.00 14,563.80 95.00 23,854.50 75.00 18,832.50 90.00 22,599.00
401-02 aggregate surface course (adjusted vehicular
measurement)
6      CUYD 250.00 1,500.00 100.00 600.00 110.00 660.00 150.00 900.00
403-01 aggregate roadway surfacing (vehicular measurement) 83.3    CUYD 65.00 5,414.50 1.00 83.30 70.00 5,831.00 100.00 8,330.00
502-01 superpave asphaltic concrete 208.3    TON 125.00 26,037.50 140.00 29,162.00 125.00 26,037.50 210.00 43,743.00
704-08-B guard rail transitions (double thrie beam) 300.0    LNFT 52.50 15,750.00 58.00 17,400.00 40.00 12,000.00 40.00 12,000.00
704-09 guard rail anchor sections (turndown) 300.0    LNFT 27.00 8,100.00 32.00 9,600.00 45.00 13,500.00 45.00 13,500.00
705-05 double swinging driveway gate 1      DBGT 600.00 600.00 1,000.00 1,000.00 750.00 750.00 750.00 750.00
711-01-C riprap (30 lb, 14" thick) 680      SQYD 40.00 27,200.00 45.00 30,600.00 40.00 27,200.00 50.00 34,000.00
711-04 geotextile fabric 680      SQYD 2.50 1,700.00 2.00 1,360.00 2.50 1,700.00 3.00 2,040.00
713-01 temporary signs & barricades lump      LUMP 16,500.00 16,500.00 15,000.00 15,000.00 9,000.00 9,000.00 20,000.00 20,000.00
727-01 mobilization lump      LUMP 10,000.00 10,000.00 30,000.00 30,000.00 70,000.00 70,000.00 69,000.00 69,000.00
729-16-C object marker assembly (type 3) 24      EACH 70.00 1,680.00 75.00 1,800.00 70.00 1,680.00 70.00 1,680.00
740-01 construction layout lump      LUMP 5,000.00 5,000.00 7,000.00 7,000.00 11,000.00 11,000.00 16,000.00 16,000.00
804-01-B precast concrete piles (14") 3,486      LNFT 32.00 111,552.00 34.00 118,524.00 42.00 146,412.00 34.00 118,524.00
804-12 loading permanent piles 3      EACH 1.00 3.00 1.00 3.00 FREE FREE 500.00 1,500.00
805-10-A bridge superstructure & substructure(90 degree
crossing,24'clear roadway)
7      SPAN 17,000.00 119,000.00 17,500.00 122,500.00 18,000.00 126,000.00 17,500.00 122,500.00
805-10-B bridge superstructure & substructure(60 degree
crossing; 24'clear roadway)
5      SPAN 17,000.00 85,000.00 17,500.00 87,500.00 19,000.00 95,000.00 18,000.00 90,000.00
S-101 concrete approach slabs(90 degree crossing; 24'clear
roadway) (w/out asphalt)
4      EACH 7,000.00 28,000.00 6,500.00 26,000.00 7,000.00 28,000.00 5,000.00 20,000.00
S-102 concrete approach slabs(60 degree crossing; 24'clear
roadway) (w/out asphalt)
2      EACH 7,000.00 14,000.00 6,500.00 13,000.00 7,000.00 14,000.00 5,500.00 11,000.00
                       
 CONTRACTOR TOTAL       556,575.20   597,380.00   666,953.50   698,938.50
 
Item Number Item Description Quantity Unit of Measure - 5 -
KOSTMAYER CONSTRUCTION, LLC
- 6 -
F. MILLER & SONS, LLC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 27,500.00 27,500.00 30,000.00 30,000.00        
202-02-A-01 removal of bridge(sta.106+60.63;22'w x 77'l,timber
bridge)
1      EACH 7,000.00 7,000.00 34,000.00 34,000.00        
202-02-A-02 removal of bridge(sta.108+68.83;19'w x 58'l,timber
piles & caps w/precast concrete deck)
1      EACH 7,000.00 7,000.00 27,000.00 27,000.00        
202-02-A-03 removal of bridge(sta.119+33.00;20'w x 52'l,timber
piles & caps w/precast concrete deck)
1      EACH 7,000.00 7,000.00 27,000.00 27,000.00        
202-02-G removal of surfacing & stabilized base 499.3    SQYD 9.00 4,493.70 7.00 3,495.10        
203-06 excavation & embankment lump      LUMP 35,000.00 35,000.00 60,000.00 60,000.00        
204-02 temporary hay or straw bales 16      EACH 12.00 192.00 10.00 160.00        
204-03 temporary slope drains 360      LNFT 8.00 2,880.00 9.00 3,240.00        
204-05-A temporary sediment check dams (hay) 12      EACH 290.00 3,480.00 125.00 1,500.00        
204-06 temporary silt fencing 2,024      LNFT 2.50 5,060.00 1.35 2,732.40        
302-01-A class ii base course (stone or recycled pcc) 251.1    CUYD 75.00 18,832.50 47.00 11,801.70        
401-02 aggregate surface course (adjusted vehicular
measurement)
6      CUYD 60.00 360.00 55.00 330.00        
403-01 aggregate roadway surfacing (vehicular measurement) 83.3    CUYD 60.00 4,998.00 48.00 3,998.40        
502-01 superpave asphaltic concrete 208.3    TON 185.00 38,535.50 215.00 44,784.50        
704-08-B guard rail transitions (double thrie beam) 300.0    LNFT 48.00 14,400.00 52.00 15,600.00        
704-09 guard rail anchor sections (turndown) 300.0    LNFT 54.00 16,200.00 27.00 8,100.00        
705-05 double swinging driveway gate 1      DBGT 550.00 550.00 2,000.00 2,000.00        
711-01-C riprap (30 lb, 14" thick) 680      SQYD 46.00 31,280.00 40.00 27,200.00        
711-04 geotextile fabric 680      SQYD 2.00 1,360.00 3.00 2,040.00        
713-01 temporary signs & barricades lump      LUMP 21,500.00 21,500.00 58,000.00 58,000.00        
727-01 mobilization lump      LUMP 72,000.00 72,000.00 70,000.00 70,000.00        
729-16-C object marker assembly (type 3) 24      EACH 90.00 2,160.00 70.00 1,680.00        
740-01 construction layout lump      LUMP 13,000.00 13,000.00 31,000.00 31,000.00        
804-01-B precast concrete piles (14") 3,486      LNFT 35.00 122,010.00 34.40 119,918.40        
804-12 loading permanent piles 3      EACH 100.00 300.00 100.00 300.00        
805-10-A bridge superstructure & substructure(90 degree
crossing,24'clear roadway)
7      SPAN 20,000.00 140,000.00 12,500.00 87,500.00        
805-10-B bridge superstructure & substructure(60 degree
crossing; 24'clear roadway)
5      SPAN 20,000.00 100,000.00 13,700.00 68,500.00        
S-101 concrete approach slabs(90 degree crossing; 24'clear
roadway) (w/out asphalt)
4      EACH 7,000.00 28,000.00 7,000.00 28,000.00        
S-102 concrete approach slabs(60 degree crossing; 24'clear
roadway) (w/out asphalt)
2      EACH 7,000.00 14,000.00 7,000.00 14,000.00        
                       
 CONTRACTOR TOTAL       739,091.70   783,880.50        