| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - GILBERT SOUTHERN CORP |
- 3 - APAC-TEXAS INC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures and obstructions
|
lump |
LUMP |
28,000.00 |
28,000.00 |
75,000.00 |
75,000.00 |
100,000.00 |
100,000.00 |
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
41,047   |
SQYD |
3.25 |
133,402.75 |
4.20 |
172,397.40 |
5.00 |
205,235.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
65,739.9 |
SQYD |
1.00 |
65,739.90 |
1.00 |
65,739.90 |
2.00 |
131,479.80 |
|
|
| 202-02-H |
removal of guard rail
|
12,438   |
LNFT |
3.00 |
37,314.00 |
3.00 |
37,314.00 |
3.10 |
38,557.80 |
|
|
| 202-02-I |
removal of existing sign
|
16   |
EACH |
8.00 |
128.00 |
80.00 |
1,280.00 |
82.00 |
1,312.00 |
|
|
| 202-02-J |
removal of existing sign support
|
18   |
EACH |
188.50 |
3,393.00 |
200.00 |
3,600.00 |
190.00 |
3,420.00 |
|
|
| 202-02-K |
removal of existing sign and u-channel post
|
18   |
EACH |
35.00 |
630.00 |
32.00 |
576.00 |
33.00 |
594.00 |
|
|
| 202-02-L |
removal of headwalls
|
8.0 |
EACH |
1,100.00 |
8,800.00 |
1,200.00 |
9,600.00 |
1,100.00 |
8,800.00 |
|
|
| 202-02-M |
removal of trees (live oaks)(18" to 30" diameter)
|
6   |
EACH |
1,500.00 |
9,000.00 |
2,000.00 |
12,000.00 |
1,100.00 |
6,600.00 |
|
|
| 202-02-N |
removal of trees (live oaks)(31" to 40" diameter)
|
10   |
EACH |
2,000.00 |
20,000.00 |
2,000.00 |
20,000.00 |
1,100.00 |
11,000.00 |
|
|
| 202-02-O |
removal of trees (live oaks)(41" to 50" diameter)
|
2   |
EACH |
2,500.00 |
5,000.00 |
2,000.00 |
4,000.00 |
1,600.00 |
3,200.00 |
|
|
| 202-02-P |
removal of trees (live oaks)(51" diameter and over)
|
3   |
EACH |
3,000.00 |
9,000.00 |
2,000.00 |
6,000.00 |
1,700.00 |
5,100.00 |
|
|
| 202-02-Q |
removal of trees (various sizes and species)
|
5   |
EACH |
1,300.00 |
6,500.00 |
750.00 |
3,750.00 |
1,300.00 |
6,500.00 |
|
|
| 202-02-R |
removal of portland cement concrete revetment
|
71   |
SQYD |
10.00 |
710.00 |
50.00 |
3,550.00 |
11.00 |
781.00 |
|
|
| 203-01 |
general excavation
|
103,769   |
CUYD |
2.05 |
212,726.45 |
4.00 |
415,076.00 |
2.20 |
228,291.80 |
|
|
| 203-04 |
embankment
|
311,765.0 |
CUYD |
8.32 |
2,593,884.80 |
8.00 |
2,494,120.00 |
8.60 |
2,681,179.00 |
|
|
| 204-02 |
temporary baled hay or straw
|
200   |
EACH |
10.00 |
2,000.00 |
30.00 |
6,000.00 |
11.00 |
2,200.00 |
|
|
| 302-01-E |
class ii base course (stone or recycled pccp)
|
344,572.0 |
SQYD |
6.10 |
2,101,889.20 |
5.50 |
1,895,146.00 |
5.70 |
1,964,060.40 |
|
|
| 302-02-C |
class ii base course (10" thick)
|
321,741.0 |
SQYD |
8.14 |
2,618,971.74 |
10.00 |
3,217,410.00 |
10.80 |
3,474,802.80 |
|
|
| 502-01 |
superpave asphaltic concrete
|
358,479.1 |
TON |
40.49 |
14,514,818.75 |
55.00 |
19,716,350.50 |
57.00 |
20,433,308.70 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
143,052   |
SQYD |
0.85 |
121,594.20 |
2.00 |
286,104.00 |
0.55 |
78,678.60 |
|
|
| 601-03-K |
portland cement concrete shoulder (10" thick)
|
160.0 |
SQYD |
62.00 |
9,920.00 |
100.00 |
16,000.00 |
62.00 |
9,920.00 |
|
|
| 601-04 |
portland cement concrete pavement coring
|
4   |
EACH |
101.00 |
404.00 |
250.00 |
1,000.00 |
102.00 |
408.00 |
|
|
| 701-01-I |
cross drain pipe (24"rcp)
|
369   |
LNFT |
56.00 |
20,664.00 |
60.00 |
22,140.00 |
56.00 |
20,664.00 |
|
|
| 701-10-I |
reinforced concrete pipe extension (24" rcp)
|
712   |
LNFT |
76.00 |
54,112.00 |
90.00 |
64,080.00 |
77.00 |
54,824.00 |
|
|
| 701-10-M |
reinforced concrete pipe extension (36" rcp)
|
76   |
LNFT |
123.00 |
9,348.00 |
110.00 |
8,360.00 |
122.00 |
9,272.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
4   |
EACH |
3,100.00 |
12,400.00 |
4,800.00 |
19,200.00 |
3,100.00 |
12,400.00 |
|
|
| 702-03-I |
catch basins (cb-62)
|
4   |
EACH |
4,600.00 |
18,400.00 |
9,000.00 |
36,000.00 |
4,600.00 |
18,400.00 |
|
|
| 702-04-B |
adjusting catch basins
|
3   |
EACH |
1,600.00 |
4,800.00 |
3,700.00 |
11,100.00 |
1,600.00 |
4,800.00 |
|
|
| 702-07-A |
cross drain safety end (type 1)
|
104   |
EACH |
1,600.00 |
166,400.00 |
1,300.00 |
135,200.00 |
1,600.00 |
166,400.00 |
|
|
| 703-01 |
shoulder underdrain systems
|
93,121   |
LNFT |
6.36 |
592,249.56 |
4.00 |
372,484.00 |
5.90 |
549,413.90 |
|
|
| 703-02 |
shoulder outlet underdrains
|
317   |
EACH |
115.00 |
36,455.00 |
330.00 |
104,610.00 |
310.00 |
98,270.00 |
|
|
| 703-06 |
underdrain video inspection
|
31,000   |
LNFT |
1.27 |
39,370.00 |
0.75 |
23,250.00 |
0.60 |
18,600.00 |
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spa.)
|
406.4 |
LNFT |
29.00 |
11,785.60 |
28.50 |
11,582.40 |
29.00 |
11,785.60 |
|
|
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
325.3 |
LNFT |
41.00 |
13,337.30 |
40.00 |
13,012.00 |
41.00 |
13,337.30 |
|
|
| 704-01-D |
guard rail (double thrie beam)(6'-3" post spa.)
|
75.0 |
LNFT |
36.00 |
2,700.00 |
35.00 |
2,625.00 |
36.00 |
2,700.00 |
|
|
| 704-03 |
blocked out guard rail
|
2,781.8 |
LNFT |
16.00 |
44,508.80 |
15.00 |
41,727.00 |
16.00 |
44,508.80 |
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
81.9 |
LNFT |
90.00 |
7,371.00 |
87.50 |
7,166.25 |
90.00 |
7,371.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
350.0 |
LNFT |
45.00 |
15,750.00 |
44.25 |
15,487.50 |
46.00 |
16,100.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
31   |
EACH |
1,800.00 |
55,800.00 |
1,725.00 |
53,475.00 |
1,800.00 |
55,800.00 |
|
|
| 706-03-C |
incidental concrete paving (6" thick)
|
10,530.5 |
SQYD |
59.00 |
621,299.50 |
40.00 |
421,220.00 |
60.00 |
631,830.00 |
|
|
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
651   |
SQYD |
37.00 |
24,087.00 |
60.00 |
39,060.00 |
36.00 |
23,436.00 |
|
|
| 712-04 |
flexible revetment
|
2,266   |
SQYD |
51.00 |
115,566.00 |
27.00 |
61,182.00 |
52.00 |
117,832.00 |
|
|
| 713-01 |
temporary signs and barricades
|
lump |
LUMP |
250,000.00 |
250,000.00 |
400,000.00 |
400,000.00 |
500,000.00 |
500,000.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4"width)
(thermoplastic) |
21.720 |
MILE |
675.00 |
14,661.00 |
660.00 |
14,335.20 |
680.00 |
14,769.60 |
|
|
| 713-04-B-02 |
temporary pavement markings (broken line)(4"width)
(10'length) (thermoplastic) |
39.440 |
MILE |
675.00 |
26,622.00 |
660.00 |
26,030.40 |
680.00 |
26,819.20 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
41.440 |
MILE |
500.00 |
20,720.00 |
500.00 |
20,720.00 |
500.00 |
20,720.00 |
|
|
| 713-05-A-01 |
temporary pavement markings (solid line)(4" width)
(type 1 removable) |
3.000 |
MILE |
12,000.00 |
36,000.00 |
12,000.00 |
36,000.00 |
12,000.00 |
36,000.00 |
|
|
| 713-05-A-02 |
temporary pavement markings (solid line)(4"width)
(thermoplastic) |
80.880 |
MILE |
2,000.00 |
161,760.00 |
2,000.00 |
161,760.00 |
2,000.00 |
161,760.00 |
|
|
| 713-08 |
temporary precast concrete barrier (contractor
furnished) |
500   |
EACH |
560.00 |
280,000.00 |
650.00 |
325,000.00 |
920.00 |
460,000.00 |
|
|
| 713-09-A |
temporary precast concrete barrier (department
furnished) (district 07, lake charles) |
800   |
EACH |
600.00 |
480,000.00 |
300.00 |
240,000.00 |
330.00 |
264,000.00 |
|
|
| 713-09-B |
temporary precast concrete barrier (department
furnished) (district 03, lafayette) |
1,000   |
EACH |
600.00 |
600,000.00 |
400.00 |
400,000.00 |
440.00 |
440,000.00 |
|
|
| 716-01-B |
mulch (fiber)
|
145.40 |
ACRE |
600.00 |
87,240.00 |
650.00 |
94,510.00 |
560.00 |
81,424.00 |
|
|
| 717-01 |
seeding
|
8,724   |
LB |
4.59 |
40,043.16 |
4.00 |
34,896.00 |
7.50 |
65,430.00 |
|
|
| 718-01 |
fertilizer
|
145,404   |
LB |
0.18 |
26,172.72 |
0.25 |
36,351.00 |
0.30 |
43,621.20 |
|
|
| 719-01 |
plants (live oak (quercus virginiana))(15 gallon)
|
44   |
EACH |
138.00 |
6,072.00 |
110.00 |
4,840.00 |
150.00 |
6,600.00 |
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
200   |
SQYD |
2.00 |
400.00 |
20.00 |
4,000.00 |
1.30 |
260.00 |
|
|
| 720-01-B |
erosion control system, slope protection (type b)
|
250   |
SQYD |
2.00 |
500.00 |
20.00 |
5,000.00 |
1.40 |
350.00 |
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
100,000.00 |
100,000.00 |
50,000.00 |
50,000.00 |
400,000.00 |
400,000.00 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
2,000   |
SQYD |
85.00 |
170,000.00 |
80.00 |
160,000.00 |
46.00 |
92,000.00 |
|
|
| 726-01 |
bedding material
|
396.6 |
CUYD |
67.00 |
26,572.20 |
75.00 |
29,745.00 |
66.00 |
26,175.60 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
3,523,000.00 |
3,523,000.00 |
4,083,000.00 |
4,083,000.00 |
4,200,000.00 |
4,200,000.00 |
|
|
| 729-01 |
sign (type a)
|
224.0 |
SQFT |
25.00 |
5,600.00 |
25.00 |
5,600.00 |
25.00 |
5,600.00 |
|
|
| 729-04 |
sign (type d)
|
600.0 |
SQFT |
23.00 |
13,800.00 |
25.00 |
15,000.00 |
24.00 |
14,400.00 |
|
|
| 729-05 |
sign (type e)
|
31.0 |
SQFT |
29.00 |
899.00 |
29.00 |
899.00 |
30.00 |
930.00 |
|
|
| 729-08-B |
mounting (3 1/2" post)
|
15   |
EACH |
700.00 |
10,500.00 |
700.00 |
10,500.00 |
700.00 |
10,500.00 |
|
|
| 729-08-F |
mounting (w6 x 12)
|
2   |
EACH |
815.00 |
1,630.00 |
800.00 |
1,600.00 |
820.00 |
1,640.00 |
|
|
| 729-08-G |
mounting (w8 x 18)
|
2   |
EACH |
1,225.00 |
2,450.00 |
1,200.00 |
2,400.00 |
1,220.00 |
2,440.00 |
|
|
| 729-08-H |
mounting (w8 x 24)
|
4   |
EACH |
1,363.00 |
5,452.00 |
1,400.00 |
5,600.00 |
1,400.00 |
5,600.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
58   |
EACH |
50.00 |
2,900.00 |
50.00 |
2,900.00 |
52.00 |
3,016.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
32   |
EACH |
66.00 |
2,112.00 |
70.00 |
2,240.00 |
67.00 |
2,144.00 |
|
|
| 729-17 |
milepost assembly (ground mounted)
|
20   |
EACH |
215.00 |
4,300.00 |
215.00 |
4,300.00 |
220.00 |
4,400.00 |
|
|
| 731-01 |
non-reflectorized raised pavement markers
|
290   |
EACH |
15.28 |
4,431.20 |
15.00 |
4,350.00 |
16.00 |
4,640.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
10,322   |
EACH |
5.30 |
54,706.60 |
5.20 |
53,674.40 |
5.40 |
55,738.80 |
|
|
| 732-02-A |
plastic pavement striping (solid line)(4" width)
|
38.978 |
MILE |
2,000.00 |
77,956.00 |
2,000.00 |
77,956.00 |
2,000.00 |
77,956.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
39.978 |
MILE |
825.00 |
32,981.85 |
830.00 |
33,181.74 |
850.00 |
33,981.30 |
|
|
| 732-05-B |
removal of temporary pavement markings
|
10.000 |
MILE |
3,900.00 |
39,000.00 |
100.00 |
1,000.00 |
7,000.00 |
70,000.00 |
|
|
| 733-01-A |
concrete roadway barrier (double faced,"f"shaped)
|
4,670.0 |
LNFT |
125.00 |
583,750.00 |
160.00 |
747,200.00 |
106.00 |
495,020.00 |
|
|
| 733-01-B |
concrete roadway barrier (double faced,"special"shaped)
|
3,956.0 |
LNFT |
125.00 |
494,500.00 |
180.00 |
712,080.00 |
106.00 |
419,336.00 |
|
|
| 734-01 |
rubblizing portland cement concrete pavement
|
232,062   |
SQYD |
3.25 |
754,201.50 |
2.70 |
626,567.40 |
2.90 |
672,979.80 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
500,000.00 |
500,000.00 |
500,000.00 |
500,000.00 |
400,000.00 |
400,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
500,000.00 |
500,000.00 |
195,000.00 |
195,000.00 |
500,000.00 |
500,000.00 |
|
|
| 804-01-B |
precast concrete piles (14")
|
7,204   |
LNFT |
31.00 |
223,324.00 |
50.00 |
360,200.00 |
37.00 |
266,548.00 |
|
|
| 804-12 |
loading permanent piles
|
2   |
EACH |
10,200.00 |
20,400.00 |
23,000.00 |
46,000.00 |
520.00 |
1,040.00 |
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
93.09 |
CUYD |
692.86 |
64,498.33 |
1,000.00 |
93,090.00 |
700.00 |
65,163.00 |
|
|
| 805-01-F |
class a concrete (bents)
|
205.08 |
CUYD |
1,018.91 |
208,958.06 |
1,400.00 |
287,112.00 |
600.00 |
123,048.00 |
|
|
| 805-03 |
class aa concrete
|
814.08 |
CUYD |
611.34 |
497,679.66 |
700.00 |
569,856.00 |
350.00 |
284,928.00 |
|
|
| 805-12-E |
reinforced concrete box culverts (4x4)
|
100.0 |
LNFT |
458.51 |
45,851.00 |
240.00 |
24,000.00 |
460.00 |
46,000.00 |
|
|
| 805-12-M |
reinforced concrete box culverts (6x6)
|
147.0 |
LNFT |
509.45 |
74,889.15 |
400.00 |
58,800.00 |
520.00 |
76,440.00 |
|
|
| 805-12-S |
reinforced concrete box culverts (8x8)
|
129.0 |
LNFT |
764.18 |
98,579.22 |
600.00 |
77,400.00 |
770.00 |
99,330.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
187,294   |
LB |
1.02 |
191,039.88 |
0.90 |
168,564.60 |
1.30 |
243,482.20 |
|
|
| 810-01 |
concrete railing (barrier)
|
1,120.00 |
LNFT |
40.76 |
45,651.20 |
42.00 |
47,040.00 |
45.00 |
50,400.00 |
|
|
| 813-01 |
concrete approach slabs
|
1,084.38 |
SQYD |
152.84 |
165,736.63 |
200.00 |
216,876.00 |
162.00 |
175,669.56 |
|
|
| S-001 |
variable message sign unit
|
8   |
EACH |
15,000.00 |
120,000.00 |
10,000.00 |
80,000.00 |
16,000.00 |
128,000.00 |
|
|
| S-002 |
stone drainage outlet
|
183   |
EACH |
750.00 |
137,250.00 |
500.00 |
91,500.00 |
300.00 |
54,900.00 |
|
|
| S-003 |
aggregate drains
|
156   |
EACH |
225.00 |
35,100.00 |
210.00 |
32,760.00 |
230.00 |
35,880.00 |
|
|
| S-004 |
retaining wall
|
563   |
LNFT |
175.00 |
98,525.00 |
170.00 |
95,710.00 |
172.00 |
96,836.00 |
|
|
| S-005 |
patching rubblized p.c.c. pavement (stone)
|
5,000.0 |
SQYD |
5.00 |
25,000.00 |
25.00 |
125,000.00 |
25.00 |
125,000.00 |
|
|
| S-006 |
selective pruning of existing live oak trees
|
3   |
EACH |
815.13 |
2,445.39 |
2,500.00 |
7,500.00 |
820.00 |
2,460.00 |
|
|
| S-007 |
cleaning existing ditches
|
2,000   |
LNFT |
10.19 |
20,380.00 |
6.00 |
12,000.00 |
5.00 |
10,000.00 |
|
|
| S-008 |
geotextile fabric
|
9,374   |
SQYD |
2.04 |
19,122.96 |
1.00 |
9,374.00 |
2.00 |
18,748.00 |
|
|
| S-009 |
rumble strips (ground in)
|
38.8 |
MILE |
516.10 |
20,024.68 |
300.00 |
11,640.00 |
310.00 |
12,028.00 |
|
|
| S-010 |
relocation of existing ditches
|
2,310.0 |
LNFT |
12.00 |
27,720.00 |
6.00 |
13,860.00 |
4.00 |
9,240.00 |
|
|
| S-011 |
rumble strips (temporary)
|
38.8 |
MILE |
516.10 |
20,024.68 |
300.00 |
11,640.00 |
600.00 |
23,280.00 |
|
|
| S-012 |
motor assistance patrol
|
4,000   |
HOUR |
85.00 |
340,000.00 |
50.00 |
200,000.00 |
75.00 |
300,000.00 |
|
|
| S-014 |
pier protection system
|
4   |
EACH |
25,000.00 |
100,000.00 |
14,000.00 |
56,000.00 |
23,000.00 |
92,000.00 |
|
|
| S-015 |
temporary construction crossovers (median)
|
518.5 |
LNFT |
125.00 |
64,812.50 |
400.00 |
207,400.00 |
280.00 |
145,180.00 |
|
|
| S-025 |
remove and remount existing sign logos
|
10   |
EACH |
41.00 |
410.00 |
40.00 |
400.00 |
42.00 |
420.00 |
|
|
| S-101 |
removal of concrete deck, bent cap & wingwall
|
lump |
LUMP |
275,000.00 |
275,000.00 |
200,000.00 |
200,000.00 |
112,000.00 |
112,000.00 |
|
|
| S-102 |
removal of concrete & pipe railings
|
1,120   |
LNFT |
50.00 |
56,000.00 |
25.00 |
28,000.00 |
33.00 |
36,960.00 |
|
|
| S-104 |
existing deck slab patch repair
|
34   |
SQYD |
350.00 |
11,900.00 |
250.00 |
8,500.00 |
310.00 |
10,540.00 |
|
|
| S-712-1 |
paved slope drain (4" minimum thickness)
|
1,700.0 |
LNFT |
16.00 |
27,200.00 |
20.00 |
34,000.00 |
15.40 |
26,180.00 |
|
|
| S-712-2 |
paved slope drain (4" thick)
|
1,100.0 |
LNFT |
13.00 |
14,300.00 |
15.00 |
16,500.00 |
12.40 |
13,640.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
36,362,986.12 |
|
42,243,933.69 |
|
43,578,765.76 |
|
|
|