Lead Project: 450-90-0181
Parish: ORLEANS
Routes: I-10
Description: MORRISON TO DWYER DRAINAGE AND BARRIER IMPROVEMENTS
Type Const: cold planing asphaltic concrete pavement, pavement patching, superpave asphaltic
concrete pavement, and related work.
 
RankLicenseBidderAmount
102179 BOH BROS. CONSTRUCTION CO., LLC. $248,470.15
 
Item Number Item Description Quantity Unit of Measure - 1 -
BOH BROS. CONSTRUCTION CO., LLC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-G removal of surfacing & stabilized base 155.0    SQYD 5.00 775.00            
202-02-H removal of guard rail 242      LNFT 4.75 1,149.50            
202-02-I removal of pier protection barrier wall 214      LNFT 23.00 4,922.00            
202-02-J removal of median barrier wall 75      LNFT 206.00 15,450.00            
502-01 superpave asphaltic concrete 358.8    TON 81.25 29,152.50            
509-01 cold planing asphaltic pavement 2,425      SQYD 3.75 9,093.75            
702-04-B adjusting catch basins 5      EACH 1,000.00 5,000.00            
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 68.8    LNFT 28.00 1,926.40            
704-03 blocked out guard rail 151.0    LNFT 15.00 2,265.00            
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
6.3    LNFT 70.00 441.00            
704-08-B guard rail transitions (double thrie beam) 50.0    LNFT 41.00 2,050.00            
704-11-A guard rail end treatment (flared) 3      EACH 1,850.00 5,550.00            
713-01 temporary signs & barricades lump      LUMP 17,000.00 17,000.00            
713-09 temporary precast concrete barrier (department
furnished)
48      EACH 300.00 14,400.00            
724-01-A pavement patching (6" minimum thickness) 90      SQYD 70.00 6,300.00            
727-01 mobilization lump      LUMP 23,000.00 23,000.00            
729-16-C object marker assembly (type 3) 4      EACH 200.00 800.00            
733-01 concrete roadway barrier (type m) 56.0    LNFT 200.00 11,200.00            
S-001 barrier wall transitions 144.0    LNFT 210.00 30,240.00            
S-002 barrier wall (54" tall) 109.0    LNFT 225.00 24,525.00            
S-003 variable message sign unit 2      EACH 5,000.00 10,000.00            
S-004 cleaning catch basins 5      EACH 500.00 2,500.00            
S-005 cleaning cross drains 146      LNFT 30.00 4,380.00            
S-006 rumble strips (ground-in) 0.4    MILE 4,000.00 1,600.00            
S-007 median barrier wall 75      LNFT 250.00 18,750.00            
S-008 impact attenuator construction zone (dotd furnished) 2      EACH 3,000.00 6,000.00            
                       
 CONTRACTOR TOTAL       248,470.15            