| DBE GOAL FED |
| Lead Project: 450-13-0043 |
| Parish: ST JOHN |
| Routes: I-10 |
| Description: LAPLACE WEIGH STATION LIGHTING UPGRADE |
| Type Const:
roadway lighting upgrade and related work.
|
|
| |
| Rank | License | Bidder | Amount |
| 1 | 01692 |
TOOMER ELECTRICAL CO., INC. | $348,856.25 |
| 2 | 08781 |
ALLRITE ELECTRIC, INC. | $367,349.60 |
| 3 | 00448 |
WALTER J. BARNES ELECTRIC CO., INC. | $377,539.60 |
| 4 | 27043 |
JACK B. HARPER CONTRACTOR, INC. | $379,792.00 |
| 5 | 13082 |
WYE ELECTRIC, INC. | $396,004.60 |
| 6 | 01185 |
FRISCHHERTZ ELECTRIC CO., INC. | $426,381.93 |
| 7 | 25747 |
KOSTMAYER CONSTRUCTION, LLC | $532,483.20 |
|
| |
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - TOOMER ELECTRICAL CO., INC. |
- 2 - ALLRITE ELECTRIC, INC. |
- 3 - WALTER J. BARNES ELECTRIC CO., INC. |
- 4 - JACK B. HARPER CONTRACTOR, INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
2,000.00 |
2,000.00 |
18,000.00 |
18,000.00 |
10,400.00 |
10,400.00 |
6,187.00 |
6,187.00 |
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
150.0 |
LNFT |
51.42 |
7,713.00 |
52.50 |
7,875.00 |
50.00 |
7,500.00 |
49.50 |
7,425.00 |
| 704-03 |
blocked out guard rail
|
725.0 |
LNFT |
18.65 |
13,521.25 |
20.00 |
14,500.00 |
18.15 |
13,158.75 |
19.00 |
13,775.00 |
| 704-11-C |
guard rail end treatment (bi-directional)
|
4   |
EACH |
5,650.00 |
22,600.00 |
6,060.00 |
24,240.00 |
5,500.00 |
22,000.00 |
6,060.00 |
24,240.00 |
| 706-03-A |
incidental concrete paving (4" thick)
|
1,148.8 |
SQYD |
30.00 |
34,464.00 |
35.00 |
40,208.00 |
43.62 |
50,110.65 |
65.00 |
74,672.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
6,780.00 |
6,780.00 |
11,270.00 |
11,270.00 |
6,400.00 |
6,400.00 |
6,500.00 |
6,500.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
5,000.00 |
5,000.00 |
25,360.00 |
25,360.00 |
13,200.00 |
13,200.00 |
20,000.00 |
20,000.00 |
| 730-01 |
trenching and backfilling
|
3,200   |
LNFT |
4.00 |
12,800.00 |
2.35 |
7,520.00 |
2.57 |
8,224.00 |
2.50 |
8,000.00 |
| 730-02-A |
conduit with conductors (2" sch. 40 pvc; 3 #2 xhhw-2)
|
120   |
LNFT |
10.50 |
1,260.00 |
6.30 |
756.00 |
6.66 |
799.20 |
6.50 |
780.00 |
| 730-02-B |
conduit with conductors (1 1/2" sch. 40 pvc;
4 #4 xhhw-2 & 1 #4 bare) |
100   |
LNFT |
9.00 |
900.00 |
7.25 |
725.00 |
7.44 |
744.00 |
5.00 |
500.00 |
| 730-02-C |
conduit with conductors (1 1/2" sch. 40 pvc;
2 #4 xhhw-2 & 1 #4 bare) |
3,300   |
LNFT |
5.50 |
18,150.00 |
4.60 |
15,180.00 |
4.91 |
16,203.00 |
2.65 |
8,745.00 |
| 730-04-A |
jacked or bored casing (6" sch. 80 pvc conduit)
|
300   |
LNFT |
31.00 |
9,300.00 |
34.75 |
10,425.00 |
57.00 |
17,100.00 |
29.00 |
8,700.00 |
| 730-06-A |
high mast pole (120 foot mounting height, steel,
ground mount, 8 luminaire ring, internal lowering device) |
3   |
EACH |
37,600.00 |
112,800.00 |
21,900.00 |
65,700.00 |
33,200.00 |
99,600.00 |
32,650.00 |
97,950.00 |
| 730-06-B |
high mast pole (120' mt. ht., steel, ground mnt.,
8 lum. ring, int. lower. device, one (1) c.c.t.v. camera system) |
1   |
EACH |
53,800.00 |
53,800.00 |
64,330.00 |
64,330.00 |
60,000.00 |
60,000.00 |
46,621.00 |
46,621.00 |
| 730-07-A |
luminaire (1000 watt clear, hps, ies type ii, medium,
non-cutoff, long and narrow distribution) |
32   |
EACH |
577.00 |
18,464.00 |
602.00 |
19,264.00 |
625.00 |
20,000.00 |
552.00 |
17,664.00 |
| 730-08-A |
electrical service point (pedestal)
|
2   |
EACH |
8,120.00 |
16,240.00 |
10,695.00 |
21,390.00 |
8,700.00 |
17,400.00 |
8,510.00 |
17,020.00 |
| 730-12-A |
removal and storage of light poles (40' mounting
height, 15' arm, steel) |
43   |
EACH |
110.00 |
4,730.00 |
127.50 |
5,482.50 |
140.00 |
6,020.00 |
175.00 |
7,525.00 |
| 730-14-A |
removal and disposal of luminaires (400 watt)
|
43   |
EACH |
20.00 |
860.00 |
50.70 |
2,180.10 |
15.00 |
645.00 |
75.00 |
3,225.00 |
| 730-16-A |
underground junction box, 11" x 18"
|
5   |
EACH |
118.00 |
590.00 |
462.00 |
2,310.00 |
383.00 |
1,915.00 |
385.00 |
1,925.00 |
| 730-16-B |
underground junction box, 13" x 24"
|
12   |
EACH |
357.00 |
4,284.00 |
609.00 |
7,308.00 |
460.00 |
5,520.00 |
415.00 |
4,980.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
2,600.00 |
2,600.00 |
3,326.00 |
3,326.00 |
600.00 |
600.00 |
3,358.00 |
3,358.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
348,856.25 |
|
367,349.60 |
|
377,539.60 |
|
379,792.00 |
|
| |
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - WYE ELECTRIC, INC. |
- 6 - FRISCHHERTZ ELECTRIC CO., INC. |
- 7 - KOSTMAYER CONSTRUCTION, LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
3,000.00 |
3,000.00 |
10,736.31 |
10,736.31 |
4,000.00 |
4,000.00 |
|
|
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
150.0 |
LNFT |
50.00 |
7,500.00 |
54.18 |
8,127.00 |
53.00 |
7,950.00 |
|
|
| 704-03 |
blocked out guard rail
|
725.0 |
LNFT |
19.00 |
13,775.00 |
19.31 |
13,999.75 |
20.00 |
14,500.00 |
|
|
| 704-11-C |
guard rail end treatment (bi-directional)
|
4   |
EACH |
6,050.00 |
24,200.00 |
5,878.85 |
23,515.40 |
7,200.00 |
28,800.00 |
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
1,148.8 |
SQYD |
42.00 |
48,249.60 |
44.72 |
51,374.33 |
39.00 |
44,803.20 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
17,623.96 |
17,623.96 |
3,700.00 |
3,700.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
4,000.00 |
4,000.00 |
13,800.25 |
13,800.25 |
30,000.00 |
30,000.00 |
|
|
| 730-01 |
trenching and backfilling
|
3,200   |
LNFT |
3.50 |
11,200.00 |
2.61 |
8,352.00 |
4.00 |
12,800.00 |
|
|
| 730-02-A |
conduit with conductors (2" sch. 40 pvc; 3 #2 xhhw-2)
|
120   |
LNFT |
7.00 |
840.00 |
12.12 |
1,454.40 |
11.00 |
1,320.00 |
|
|
| 730-02-B |
conduit with conductors (1 1/2" sch. 40 pvc;
4 #4 xhhw-2 & 1 #4 bare) |
100   |
LNFT |
7.50 |
750.00 |
11.82 |
1,182.00 |
11.00 |
1,100.00 |
|
|
| 730-02-C |
conduit with conductors (1 1/2" sch. 40 pvc;
2 #4 xhhw-2 & 1 #4 bare) |
3,300   |
LNFT |
6.50 |
21,450.00 |
5.28 |
17,424.00 |
11.00 |
36,300.00 |
|
|
| 730-04-A |
jacked or bored casing (6" sch. 80 pvc conduit)
|
300   |
LNFT |
20.00 |
6,000.00 |
63.85 |
19,155.00 |
46.00 |
13,800.00 |
|
|
| 730-06-A |
high mast pole (120 foot mounting height, steel,
ground mount, 8 luminaire ring, internal lowering device) |
3   |
EACH |
36,500.00 |
109,500.00 |
40,906.35 |
122,719.05 |
57,200.00 |
171,600.00 |
|
|
| 730-06-B |
high mast pole (120' mt. ht., steel, ground mnt.,
8 lum. ring, int. lower. device, one (1) c.c.t.v. camera system) |
1   |
EACH |
52,400.00 |
52,400.00 |
51,580.17 |
51,580.17 |
67,600.00 |
67,600.00 |
|
|
| 730-07-A |
luminaire (1000 watt clear, hps, ies type ii, medium,
non-cutoff, long and narrow distribution) |
32   |
EACH |
715.00 |
22,880.00 |
640.79 |
20,505.28 |
1,500.00 |
48,000.00 |
|
|
| 730-08-A |
electrical service point (pedestal)
|
2   |
EACH |
10,250.00 |
20,500.00 |
6,249.34 |
12,498.68 |
2,000.00 |
4,000.00 |
|
|
| 730-12-A |
removal and storage of light poles (40' mounting
height, 15' arm, steel) |
43   |
EACH |
400.00 |
17,200.00 |
254.52 |
10,944.36 |
430.00 |
18,490.00 |
|
|
| 730-14-A |
removal and disposal of luminaires (400 watt)
|
43   |
EACH |
105.00 |
4,515.00 |
93.18 |
4,006.74 |
190.00 |
8,170.00 |
|
|
| 730-16-A |
underground junction box, 11" x 18"
|
5   |
EACH |
705.00 |
3,525.00 |
402.52 |
2,012.60 |
650.00 |
3,250.00 |
|
|
| 730-16-B |
underground junction box, 13" x 24"
|
12   |
EACH |
960.00 |
11,520.00 |
700.41 |
8,404.92 |
725.00 |
8,700.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
3,000.00 |
3,000.00 |
6,965.73 |
6,965.73 |
3,600.00 |
3,600.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
396,004.60 |
|
426,381.93 |
|
532,483.20 |
|
|
|