| Lead Project: 388-03-0008 |
| Parish: ACADIA |
| Routes: LA 370 |
| Description: DRAIN BRIDGE AND APPROACHES |
Type Const:
grading, drain struct, class ii bc, superpave acp, con span bridge system (alternate
a1), reinforced conc box culverts (alternate a2), and related work. |
|
| |
| Rank | License | Bidder | Amount |
| 1 | 08815 |
W. E. MCDONALD & SON, LLC. | $267,086.89 |
| 2 | 18943 |
BULLIARD CONSTRUCTION CO. INC. | $278,638.68 |
| 3 | 31856 |
C & C FONTENOT CONSTRUCTION, INC. | $279,169.70 |
| 4 | 09090 |
GUINN BROTHERS, LLC. | $280,750.80 |
| 5 | 25747 |
KOSTMAYER CONSTRUCTION, LLC | $307,012.50 |
| 6 | 02179 |
BOH BROS. CONSTRUCTION CO., LLC. | $332,996.10 |
| 7 | 00060 |
F. MILLER & SONS, LLC | $339,384.90 |
| 8 | 12136 |
SHILOH CONTRACTORS, INC. | $368,995.94 |
| 9 | 04089 |
H & S CONSTRUCTION CO., INC. | $399,425.54 |
|
| |
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - W. E. MCDONALD & SON, LLC. |
- 2 - BULLIARD CONSTRUCTION CO. INC. |
- 3 - C & C FONTENOT CONSTRUCTION, INC. |
- 4 - GUINN BROTHERS, LLC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
7,500.00 |
7,500.00 |
3,258.96 |
3,258.96 |
3,500.00 |
3,500.00 |
4,000.00 |
4,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
1,000.00 |
1,000.00 |
1,425.10 |
1,425.10 |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
| 202-02-A |
removal of bridges (sta. 10+000, 5.357m x 6.0m timber
bridge) |
1   |
ea |
4,000.00 |
4,000.00 |
7,077.04 |
7,077.04 |
3,000.00 |
3,000.00 |
5,000.00 |
5,000.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
604.0 |
sq m |
5.00 |
3,020.00 |
5.79 |
3,497.16 |
4.00 |
2,416.00 |
5.00 |
3,020.00 |
| 203-06 |
excavation & embankment
|
lump |
lump |
12,000.00 |
12,000.00 |
9,276.14 |
9,276.14 |
13,000.00 |
13,000.00 |
15,000.00 |
15,000.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
ea |
300.00 |
1,200.00 |
64.88 |
259.52 |
200.00 |
800.00 |
100.00 |
400.00 |
| 204-06 |
temporary silt fencing
|
160   |
ln m |
8.00 |
1,280.00 |
5.78 |
924.80 |
4.50 |
720.00 |
4.00 |
640.00 |
| 302-01 |
class ii base course
|
223.5 |
cu m |
80.00 |
17,880.00 |
94.67 |
21,158.74 |
93.00 |
20,785.50 |
85.00 |
18,997.50 |
| 401-01 |
aggregate surface course (net section)
|
24.9 |
cu m |
100.00 |
2,490.00 |
105.44 |
2,625.45 |
83.00 |
2,066.70 |
100.00 |
2,490.00 |
| 502-01 |
superpave asphaltic concrete (level 1)
|
88.0 |
Mg |
165.00 |
14,520.00 |
150.00 |
13,200.00 |
220.00 |
19,360.00 |
200.00 |
17,600.00 |
| 701-05-I |
side drain pipe (600 mm)
|
134.0 |
ln m |
125.00 |
16,750.00 |
100.00 |
13,400.00 |
98.00 |
13,132.00 |
150.00 |
20,100.00 |
| 701-05-K |
side drain pipe (750 mm)
|
80.0 |
ln m |
145.00 |
11,600.00 |
125.02 |
10,001.60 |
140.00 |
11,200.00 |
230.00 |
18,400.00 |
| 702-08-A |
side drain safety end (type 1)
|
2   |
ea |
1,500.00 |
3,000.00 |
934.09 |
1,868.18 |
1,600.00 |
3,200.00 |
2,000.00 |
4,000.00 |
| 702-08-B |
side drain safety end (type 2)
|
2   |
ea |
2,500.00 |
5,000.00 |
1,576.08 |
3,152.16 |
3,200.00 |
6,400.00 |
3,000.00 |
6,000.00 |
| 708-01 |
right-of-way monument
|
8   |
ea |
300.00 |
2,400.00 |
44.01 |
352.08 |
150.00 |
1,200.00 |
500.00 |
4,000.00 |
| 708-02 |
right-of-way monument witness post
|
8   |
ea |
300.00 |
2,400.00 |
52.53 |
420.24 |
100.00 |
800.00 |
500.00 |
4,000.00 |
| 713-01 |
temporary signs & barricades
|
lump |
lump |
9,500.00 |
9,500.00 |
7,248.62 |
7,248.62 |
4,000.00 |
4,000.00 |
12,000.00 |
12,000.00 |
| 717-01 |
seeding
|
10   |
kg |
22.00 |
220.00 |
25.84 |
258.40 |
15.00 |
150.00 |
30.00 |
300.00 |
| 718-01 |
fertilizer
|
255   |
kg |
2.09 |
532.95 |
1.29 |
328.95 |
2.00 |
510.00 |
1.50 |
382.50 |
| 726-01 |
bedding material
|
35.8 |
cu m |
75.00 |
2,685.00 |
96.80 |
3,465.44 |
20.00 |
716.00 |
100.00 |
3,580.00 |
| 727-01 |
mobilization
|
lump |
lump |
8,000.00 |
8,000.00 |
7,353.68 |
7,353.68 |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
| 729-16 |
object marker assembly
|
4   |
ea |
100.00 |
400.00 |
102.25 |
409.00 |
125.00 |
500.00 |
100.00 |
400.00 |
| 731-02 |
reflectorized raised pavement markers
|
10   |
ea |
58.00 |
580.00 |
67.70 |
677.00 |
75.00 |
750.00 |
70.00 |
700.00 |
| 737-01-A |
painted traffic striping (solid line)(100 mm width)
|
0.266 |
km |
4,200.00 |
1,117.20 |
4,902.45 |
1,304.05 |
6,500.00 |
1,729.00 |
5,200.00 |
1,383.20 |
| 737-02-A |
painted traffic striping (broken line)(100 mm width)
|
0.113 |
km |
2,688.00 |
303.74 |
3,137.57 |
354.54 |
6,500.00 |
734.50 |
3,200.00 |
361.60 |
| S-001 |
construction layout
|
lump |
lump |
5,000.00 |
5,000.00 |
2,918.13 |
2,918.13 |
3,000.00 |
3,000.00 |
4,000.00 |
4,000.00 |
| | SUBTOTAL GENERAL |
|
|
|
134,378.89 |
|
116,214.98 |
|
128,669.70 |
|
166,754.80 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
drainage structure, sta. 10+000
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
con-span bridge system
|
|
|
|
|
|
|
|
|
|
|
| S-002 |
con-span bridge system (6096 x 1881 x 24500 mm)
|
lump |
lump |
0.00 |
0.00 |
162,423.70 |
162,423.70 |
150,500.00 |
150,500.00 |
0.00 |
0.00 |
| | SUBTOTAL ALT A1 |
|
|
|
|
|
162,423.70 |
|
150,500.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
3-1800 x 1800 rcb
|
|
|
|
|
|
|
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
25.84 |
cu m |
1,300.00 |
33,592.00 |
0.00 |
0.00 |
1,350.00 |
34,884.00 |
800.00 |
20,672.00 |
| 805-12-M |
reinforced concrete box culverts (1800 mm x 1800 mm)
|
73.80 |
ln m |
1,300.00 |
95,940.00 |
0.00 |
0.00 |
1,600.00 |
118,080.00 |
1,200.00 |
88,560.00 |
| 806-01 |
deformed reinforcing steel
|
1,588   |
kg |
2.00 |
3,176.00 |
0.00 |
0.00 |
2.30 |
3,652.40 |
3.00 |
4,764.00 |
| | SUBTOTAL ALT A2 |
|
|
|
132,708.00 |
|
|
|
156,616.40 |
|
113,996.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
267,086.89 |
|
278,638.68 |
|
279,169.70 |
|
280,750.80 |
|
| |
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - KOSTMAYER CONSTRUCTION, LLC |
- 6 - BOH BROS. CONSTRUCTION CO., LLC. |
- 7 - F. MILLER & SONS, LLC |
- 8 - SHILOH CONTRACTORS, INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
8,000.00 |
8,000.00 |
200.00 |
200.00 |
9,400.00 |
9,400.00 |
12,000.00 |
12,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
3,000.00 |
3,000.00 |
2,500.00 |
2,500.00 |
2,700.00 |
2,700.00 |
2,000.00 |
2,000.00 |
| 202-02-A |
removal of bridges (sta. 10+000, 5.357m x 6.0m timber
bridge) |
1   |
ea |
6,000.00 |
6,000.00 |
6,000.00 |
6,000.00 |
14,100.00 |
14,100.00 |
2,500.00 |
2,500.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
604.0 |
sq m |
9.00 |
5,436.00 |
3.40 |
2,053.60 |
9.00 |
5,436.00 |
6.50 |
3,926.00 |
| 203-06 |
excavation & embankment
|
lump |
lump |
11,000.00 |
11,000.00 |
34,000.00 |
34,000.00 |
33,300.00 |
33,300.00 |
18,000.00 |
18,000.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
ea |
170.00 |
680.00 |
76.00 |
304.00 |
130.00 |
520.00 |
5.00 |
20.00 |
| 204-06 |
temporary silt fencing
|
160   |
ln m |
2.50 |
400.00 |
5.00 |
800.00 |
14.00 |
2,240.00 |
5.00 |
800.00 |
| 302-01 |
class ii base course
|
223.5 |
cu m |
60.00 |
13,410.00 |
97.00 |
21,679.50 |
67.00 |
14,974.50 |
100.00 |
22,350.00 |
| 401-01 |
aggregate surface course (net section)
|
24.9 |
cu m |
60.00 |
1,494.00 |
104.00 |
2,589.60 |
90.00 |
2,241.00 |
110.00 |
2,739.00 |
| 502-01 |
superpave asphaltic concrete (level 1)
|
88.0 |
Mg |
180.00 |
15,840.00 |
170.00 |
14,960.00 |
233.00 |
20,504.00 |
150.00 |
13,200.00 |
| 701-05-I |
side drain pipe (600 mm)
|
134.0 |
ln m |
142.00 |
19,028.00 |
216.00 |
28,944.00 |
100.00 |
13,400.00 |
235.00 |
31,490.00 |
| 701-05-K |
side drain pipe (750 mm)
|
80.0 |
ln m |
181.00 |
14,480.00 |
292.00 |
23,360.00 |
120.00 |
9,600.00 |
300.00 |
24,000.00 |
| 702-08-A |
side drain safety end (type 1)
|
2   |
ea |
1,750.00 |
3,500.00 |
1,200.00 |
2,400.00 |
1,500.00 |
3,000.00 |
2,000.00 |
4,000.00 |
| 702-08-B |
side drain safety end (type 2)
|
2   |
ea |
3,500.00 |
7,000.00 |
2,200.00 |
4,400.00 |
2,400.00 |
4,800.00 |
3,300.00 |
6,600.00 |
| 708-01 |
right-of-way monument
|
8   |
ea |
600.00 |
4,800.00 |
370.00 |
2,960.00 |
330.00 |
2,640.00 |
300.00 |
2,400.00 |
| 708-02 |
right-of-way monument witness post
|
8   |
ea |
200.00 |
1,600.00 |
135.00 |
1,080.00 |
125.00 |
1,000.00 |
400.00 |
3,200.00 |
| 713-01 |
temporary signs & barricades
|
lump |
lump |
13,000.00 |
13,000.00 |
8,000.00 |
8,000.00 |
29,000.00 |
29,000.00 |
8,500.00 |
8,500.00 |
| 717-01 |
seeding
|
10   |
kg |
30.00 |
300.00 |
28.00 |
280.00 |
70.00 |
700.00 |
25.00 |
250.00 |
| 718-01 |
fertilizer
|
255   |
kg |
3.00 |
765.00 |
1.00 |
255.00 |
3.00 |
765.00 |
1.00 |
255.00 |
| 726-01 |
bedding material
|
35.8 |
cu m |
60.00 |
2,148.00 |
64.00 |
2,291.20 |
94.00 |
3,365.20 |
115.00 |
4,117.00 |
| 727-01 |
mobilization
|
lump |
lump |
40,000.00 |
40,000.00 |
63,000.00 |
63,000.00 |
30,000.00 |
30,000.00 |
36,000.00 |
36,000.00 |
| 729-16 |
object marker assembly
|
4   |
ea |
110.00 |
440.00 |
125.00 |
500.00 |
80.00 |
320.00 |
80.00 |
320.00 |
| 731-02 |
reflectorized raised pavement markers
|
10   |
ea |
70.00 |
700.00 |
64.00 |
640.00 |
60.00 |
600.00 |
58.00 |
580.00 |
| 737-01-A |
painted traffic striping (solid line)(100 mm width)
|
0.266 |
km |
6,000.00 |
1,596.00 |
4,500.00 |
1,197.00 |
4,400.00 |
1,170.40 |
4,200.00 |
1,117.20 |
| 737-02-A |
painted traffic striping (broken line)(100 mm width)
|
0.113 |
km |
3,500.00 |
395.50 |
3,000.00 |
339.00 |
2,800.00 |
316.40 |
2,688.00 |
303.74 |
| S-001 |
construction layout
|
lump |
lump |
13,000.00 |
13,000.00 |
7,700.00 |
7,700.00 |
12,600.00 |
12,600.00 |
2,300.00 |
2,300.00 |
| | SUBTOTAL GENERAL |
|
|
|
188,012.50 |
|
232,432.90 |
|
218,692.50 |
|
202,967.94 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
drainage structure, sta. 10+000
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
con-span bridge system
|
|
|
|
|
|
|
|
|
|
|
| S-002 |
con-span bridge system (6096 x 1881 x 24500 mm)
|
lump |
lump |
119,000.00 |
119,000.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| | SUBTOTAL ALT A1 |
|
|
|
119,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
3-1800 x 1800 rcb
|
|
|
|
|
|
|
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
25.84 |
cu m |
975.00 |
25,194.00 |
680.00 |
17,571.20 |
835.00 |
21,576.40 |
1,100.00 |
28,424.00 |
| 805-12-M |
reinforced concrete box culverts (1800 mm x 1800 mm)
|
73.80 |
ln m |
1,253.00 |
92,471.40 |
1,060.00 |
78,228.00 |
1,300.00 |
95,940.00 |
1,800.00 |
132,840.00 |
| 806-01 |
deformed reinforcing steel
|
1,588   |
kg |
0.90 |
1,429.20 |
3.00 |
4,764.00 |
2.00 |
3,176.00 |
3.00 |
4,764.00 |
| | SUBTOTAL ALT A2 |
|
|
|
119,094.60 |
|
100,563.20 |
|
120,692.40 |
|
166,028.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
307,012.50 |
|
332,996.10 |
|
339,384.90 |
|
368,995.94 |
|
| |
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 9 - H & S CONSTRUCTION CO., INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 202-02-A |
removal of bridges (sta. 10+000, 5.357m x 6.0m timber
bridge) |
1   |
ea |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
604.0 |
sq m |
14.00 |
8,456.00 |
|
|
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
lump |
12,000.00 |
12,000.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
ea |
200.00 |
800.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
160   |
ln m |
20.00 |
3,200.00 |
|
|
|
|
|
|
| 302-01 |
class ii base course
|
223.5 |
cu m |
117.00 |
26,149.50 |
|
|
|
|
|
|
| 401-01 |
aggregate surface course (net section)
|
24.9 |
cu m |
117.00 |
2,913.30 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete (level 1)
|
88.0 |
Mg |
225.00 |
19,800.00 |
|
|
|
|
|
|
| 701-05-I |
side drain pipe (600 mm)
|
134.0 |
ln m |
175.00 |
23,450.00 |
|
|
|
|
|
|
| 701-05-K |
side drain pipe (750 mm)
|
80.0 |
ln m |
200.00 |
16,000.00 |
|
|
|
|
|
|
| 702-08-A |
side drain safety end (type 1)
|
2   |
ea |
3,000.00 |
6,000.00 |
|
|
|
|
|
|
| 702-08-B |
side drain safety end (type 2)
|
2   |
ea |
3,000.00 |
6,000.00 |
|
|
|
|
|
|
| 708-01 |
right-of-way monument
|
8   |
ea |
200.00 |
1,600.00 |
|
|
|
|
|
|
| 708-02 |
right-of-way monument witness post
|
8   |
ea |
200.00 |
1,600.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
12,000.00 |
12,000.00 |
|
|
|
|
|
|
| 717-01 |
seeding
|
10   |
kg |
25.50 |
255.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
255   |
kg |
2.20 |
561.00 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
35.8 |
cu m |
100.00 |
3,580.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
lump |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| 729-16 |
object marker assembly
|
4   |
ea |
80.00 |
320.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
10   |
ea |
67.00 |
670.00 |
|
|
|
|
|
|
| 737-01-A |
painted traffic striping (solid line)(100 mm width)
|
0.266 |
km |
5,040.00 |
1,340.64 |
|
|
|
|
|
|
| 737-02-A |
painted traffic striping (broken line)(100 mm width)
|
0.113 |
km |
3,225.00 |
364.42 |
|
|
|
|
|
|
| S-001 |
construction layout
|
lump |
lump |
8,000.00 |
8,000.00 |
|
|
|
|
|
|
| | SUBTOTAL GENERAL |
|
|
|
215,059.86 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
drainage structure, sta. 10+000
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
con-span bridge system
|
|
|
|
|
|
|
|
|
|
|
| S-002 |
con-span bridge system (6096 x 1881 x 24500 mm)
|
lump |
lump |
200,000.00 |
200,000.00 |
|
|
|
|
|
|
| | SUBTOTAL ALT A1 |
|
|
|
200,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
3-1800 x 1800 rcb
|
|
|
|
|
|
|
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
25.84 |
cu m |
900.00 |
23,256.00 |
|
|
|
|
|
|
| 805-12-M |
reinforced concrete box culverts (1800 mm x 1800 mm)
|
73.80 |
ln m |
2,100.00 |
154,980.00 |
|
|
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
1,588   |
kg |
3.86 |
6,129.68 |
|
|
|
|
|
|
| | SUBTOTAL ALT A2 |
|
|
|
184,365.68 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
399,425.54 |
|
|
|
|
|
|
|