DBE GOAL FED
Lead Project: 353-03-0021
Parish: CATAHOULA
Routes: LA 126
Description: JUNCTION OF ROUTE LA 8 - WEST JUNCTION OF ROUTE LA 923
Type Const: grading, drainage structures, cold planning asphaltic concrete, lime treatment,
cement treated base course, superpave asphaltic concrete pavement, and related work
 
RankLicenseBidderAmount
108815 W. E. MCDONALD & SON, LLC. $1,717,297.65
202268 SOIL STABILIZERS, INC. $1,770,563.65
305789 D & J CONSTRUCTION CO., INC. $1,876,570.30
412487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,964,904.34
 
Item Number Item Description Quantity Unit of Measure - 1 -
W. E. MCDONALD & SON, LLC.
- 2 -
SOIL STABILIZERS, INC.
- 3 -
D & J CONSTRUCTION CO., INC.
- 4 -
DIAMOND B CONSTRUCTION CO., L.L.C.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 1,574      LNFT 3.00 4,722.00 3.00 4,722.00 6.00 9,444.00 3.00 4,722.00
203-08 borrow (vehicular measurement) 10,024      CUYD 5.00 50,120.00 8.00 80,192.00 8.00 80,192.00 11.00 110,264.00
304-01 lime 1,468.70   TON 107.00 157,150.90 50.00 73,435.00 75.00 110,152.50 114.00 167,431.80
304-04-D lime treatment (type d) (12" thick) 69,261      SQYD 1.60 110,817.60 0.50 34,630.50 1.25 86,576.25 2.83 196,008.63
401-02 aggregate surface course (adjusted vehicular
measurement)
103      CUYD 45.00 4,635.00 30.00 3,090.00 45.00 4,635.00 30.18 3,108.54
502-01 superpave asphaltic concrete 13,010.5    TON 47.75 621,251.37 48.00 624,504.00 48.00 624,504.00 42.30 550,344.15
502-01-A superpave asphaltic concrete, paved drives and
turnouts
289.2    TON 125.00 36,150.00 125.00 36,150.00 125.00 36,150.00 170.11 49,195.81
509-01 cold planing asphaltic pavement 51,409      SQYD 1.00 51,409.00 1.25 64,261.25 1.40 71,972.60 1.25 64,261.25
509-02 contractor retained reclaimed asphaltic pavement - 2,088      CUYD 0.01 - 20.88 0.01 - 20.88 0.01 - 20.88 0.10 - 208.80
701-01-M/N cross drain pipe (36" rcp/pcp or 42" cmp) 64      LNFT 151.00 9,664.00 110.00 7,040.00 165.50 10,592.00 83.50 5,344.00
701-01-S/U cross drain pipe (72" rcp/pcp or 84" cmp) 304      LNFT 305.00 92,720.00 300.00 91,200.00 340.00 103,360.00 287.00 87,248.00
701-10-K reinforced concrete pipe (extension)(30") 32      LNFT 140.00 4,480.00 125.00 4,000.00 107.50 3,440.00 100.00 3,200.00
701-15 concrete collar 4      EACH 600.00 2,400.00 500.00 2,000.00 625.00 2,500.00 522.00 2,088.00
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 275.0    LNFT 29.50 8,112.50 29.50 8,112.50 29.50 8,112.50 31.00 8,525.00
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 804.0    LNFT 44.00 35,376.00 44.00 35,376.00 44.00 35,376.00 46.00 36,984.00
704-03 blocked out guard rail 187.5    LNFT 16.00 3,000.00 16.00 3,000.00 16.00 3,000.00 17.00 3,187.50
704-11-A guard rail end treatment (flared) 12      EACH 1,780.00 21,360.00 1,800.00 21,600.00 1,780.00 21,360.00 2,000.00 24,000.00
713-01 temporary signs & barricades lump      LUMP 10,000.00 10,000.00 84,000.00 84,000.00 50,000.00 50,000.00 7,500.00 7,500.00
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
12.017  MILE 250.00 3,004.25 200.00 2,403.40 165.00 1,982.80 138.00 1,658.34
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
9.122  MILE 1.00 9.12 190.00 1,733.18 1.00 9.12 315.00 2,873.43
713-05-A temporary pavement markings (solid line)(4" width) 32.635  MILE 1.00 32.63 270.00 8,811.45 1.00 32.63 520.00 16,970.20
716-01-A mulch (vegetative) 14.08   ACRE 650.00 9,152.00 800.00 11,264.00 650.00 9,152.00 678.00 9,546.24
717-01 seeding 845      LB 3.25 2,746.25 5.00 4,225.00 3.25 2,746.25 4.00 3,380.00
718-01 fertilizer 14,080      LB 0.25 3,520.00 0.20 2,816.00 0.25 3,520.00 0.26 3,660.80
722-01 project site laboratory 1      EACH 1,500.00 1,500.00 2,500.00 2,500.00 5,000.00 5,000.00 6,000.00 6,000.00
726-01 bedding material 168.4    CUYD 65.00 10,946.00 65.00 10,946.00 55.00 9,262.00 68.00 11,451.20
727-01 mobilization lump      LUMP 89,000.00 89,000.00 77,000.00 77,000.00 99,000.00 99,000.00 22,000.00 22,000.00
729-16-C object marker assembly (type 3) 12      EACH 68.00 816.00 70.00 840.00 68.00 816.00 71.00 852.00
731-02 reflectorized raised pavement markers 529      EACH 4.90 2,592.10 6.50 3,438.50 5.25 2,777.25 4.70 2,486.30
732-02-A plastic pavement striping (solid line) (4" width) 10.878  MILE 1,890.00 20,559.42 2,600.00 28,282.80 2,385.00 25,944.03 2,000.00 21,756.00
732-03-A plastic pavement striping (broken line)(4" width) 3.041  MILE 790.00 2,402.39 950.00 2,888.95 750.00 2,280.75 675.00 2,052.67
735-01 mailboxes 2      EACH 1.00 2.00 10.00 20.00 1.00 2.00 15.00 30.00
735-02 mailbox supports (single) 2      EACH 500.00 1,000.00 200.00 400.00 500.00 1,000.00 100.00 200.00
740-01 construction layout lump      LUMP 7,000.00 7,000.00 10,000.00 10,000.00 20,000.00 20,000.00 13,000.00 13,000.00
S-001 lime treatment (type d)(12" thick) extra depth 23,990      SQYD 1.60 38,384.00 1.00 23,990.00 1.25 29,987.50 4.00 95,960.00
S-002 cement treated base course (12 inch depth) 66,952      SQYD 4.50 301,284.00 6.00 401,712.00 6.00 401,712.00 6.39 427,823.28
                       
 CONTRACTOR TOTAL       1,717,297.65   1,770,563.65   1,876,570.30   1,964,904.34