| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - BARRIERE CONSTRUCTION CO., LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
1,510   |
LNFT |
2.00 |
3,020.00 |
8.00 |
12,080.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
7,042   |
CUYD |
10.00 |
70,420.00 |
10.00 |
70,420.00 |
|
|
|
|
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
2,112   |
CUYD |
10.00 |
21,120.00 |
10.00 |
21,120.00 |
|
|
|
|
| 303-02 |
removal of existing patches
|
1,440   |
SQYD |
6.00 |
8,640.00 |
1.00 |
1,440.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
33,181.9 |
TON |
35.84 |
1,189,239.29 |
44.00 |
1,460,003.60 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
1,737.9 |
TON |
74.92 |
130,203.46 |
44.00 |
76,467.60 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
127,124   |
SQYD |
0.75 |
95,343.00 |
1.20 |
152,548.80 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 6,062   |
CUYD |
0.10 |
- 606.20 |
15.00 |
- 90,930.00 |
|
|
|
|
| 701-01-O |
cross drain pipe (48" rcp/pcp)
|
168   |
LNFT |
188.00 |
31,584.00 |
200.00 |
33,600.00 |
|
|
|
|
| 701-02-D/E |
cross drain pipe arch (24" equiv. rcpa or 30" equiv.
cmpa) |
200   |
LNFT |
102.00 |
20,400.00 |
110.00 |
22,000.00 |
|
|
|
|
| 701-02-E/F |
cross drain pipe arch (30" equiv. rcpa or 36" equiv.
cmpa) |
144   |
LNFT |
112.00 |
16,128.00 |
120.00 |
17,280.00 |
|
|
|
|
| 701-02-J/L |
cross drain pipe arch (60" equiv. rcpa or 72" equiv.
cmpa) |
208   |
LNFT |
255.00 |
53,040.00 |
260.00 |
54,080.00 |
|
|
|
|
| 701-08 |
relaying pipe
|
8   |
LNFT |
122.00 |
976.00 |
150.00 |
1,200.00 |
|
|
|
|
| 701-13-J |
corrugated metal pipe arch (extension)(60" equiv.)
|
32   |
LNFT |
275.00 |
8,800.00 |
300.00 |
9,600.00 |
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
412.5 |
LNFT |
48.00 |
19,800.00 |
50.00 |
20,625.00 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
270.0 |
LNFT |
51.00 |
13,770.00 |
50.00 |
13,500.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
456.3 |
LNFT |
16.50 |
7,528.95 |
17.00 |
7,757.10 |
|
|
|
|
| 704-05 |
guard rail anchor sections (bct)
|
25.0 |
LNFT |
46.00 |
1,150.00 |
47.00 |
1,175.00 |
|
|
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
225.0 |
LNFT |
42.00 |
9,450.00 |
31.00 |
6,975.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
262.5 |
LNFT |
48.00 |
12,600.00 |
48.00 |
12,600.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
22   |
EACH |
1,900.00 |
41,800.00 |
2,000.00 |
44,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
60,000.00 |
60,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
108   |
LNFT |
1.00 |
108.00 |
1.00 |
108.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
28.530 |
MILE |
130.00 |
3,708.90 |
130.00 |
3,708.90 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
13.590 |
MILE |
267.00 |
3,628.53 |
20.00 |
271.80 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
93.810 |
MILE |
460.00 |
43,152.60 |
50.00 |
4,690.50 |
|
|
|
|
| 713-06-D |
temporary pavement legends & symbols (rr crossing)
|
3   |
each |
204.00 |
612.00 |
200.00 |
600.00 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
526   |
SQYD |
48.00 |
25,248.00 |
50.00 |
26,300.00 |
|
|
|
|
| 726-01 |
bedding material
|
340.8 |
CUYD |
56.00 |
19,084.80 |
57.00 |
19,425.60 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
30,000.00 |
30,000.00 |
130,000.00 |
130,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
58   |
EACH |
66.00 |
3,828.00 |
67.00 |
3,886.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,257   |
EACH |
5.00 |
6,285.00 |
5.00 |
6,285.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
36   |
LNFT |
3.00 |
108.00 |
5.00 |
180.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
31.270 |
MILE |
1,800.00 |
56,286.00 |
1,900.00 |
59,413.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.530 |
MILE |
765.00 |
3,465.45 |
800.00 |
3,624.00 |
|
|
|
|
| 732-04-D |
plastic pavement legends and symbols (rr symbols)
|
1   |
each |
460.00 |
460.00 |
500.00 |
500.00 |
|
|
|
|
| 735-01 |
mailboxes
|
76   |
EACH |
15.00 |
1,140.00 |
5.00 |
380.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
76   |
EACH |
100.00 |
7,600.00 |
110.00 |
8,360.00 |
|
|
|
|
| 739-01 |
hydro-seeding
|
10.30 |
ACRE |
900.00 |
9,270.00 |
900.00 |
9,270.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
109.93 |
CUYD |
969.00 |
106,522.17 |
1,000.00 |
109,930.00 |
|
|
|
|
| 805-12-J-01 |
reinforced concrete box culverts (6'x 5')(precast only,
astm c-1433) |
120.0 |
LNFT |
408.00 |
48,960.00 |
430.00 |
51,600.00 |
|
|
|
|
| 805-12-O-01 |
reinforced concrete box culverts (8'x 6')(precast only,
astm c-1433) |
120.0 |
LNFT |
510.00 |
61,200.00 |
540.00 |
64,800.00 |
|
|
|
|
| 805-12-Q-01 |
reinforced concrete box culverts (8'x 7')(precast only,
astm c-1433) |
176.0 |
LNFT |
610.00 |
107,360.00 |
650.00 |
114,400.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
7,407   |
LB |
1.00 |
7,407.00 |
1.20 |
8,888.40 |
|
|
|
|
| S-001 |
cement treated base course (12 in depth)
|
74,849   |
SQYD |
4.61 |
345,053.89 |
5.00 |
374,245.00 |
|
|
|
|
| S-002 |
u-channel post installation
|
139   |
EACH |
46.00 |
6,394.00 |
48.00 |
6,672.00 |
|
|
|
|
| S-003 |
cleaning existing ditches
|
1,300   |
LNFT |
5.10 |
6,630.00 |
4.00 |
5,200.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,737,918.84 |
|
3,040,280.30 |
|
|
|
|
|