| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
- 2 - BARBER BROS. CONTRACTING CO., L.L.C |
- 3 - BARRIERE CONSTRUCTION CO., LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
92   |
SQYD |
15.00 |
1,380.00 |
20.00 |
1,840.00 |
60.00 |
5,520.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
1,156.8 |
SQYD |
5.00 |
5,784.00 |
20.00 |
23,136.00 |
5.00 |
5,784.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
3,932   |
CUYD |
5.00 |
19,660.00 |
1.00 |
3,932.00 |
5.00 |
19,660.00 |
|
|
| 302-02-D-01 |
class ii base course (12" thick) (stone only)
|
2,904.4 |
SQYD |
25.00 |
72,610.00 |
25.00 |
72,610.00 |
20.00 |
58,088.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
17,949.5 |
TON |
40.00 |
717,980.00 |
45.00 |
807,727.50 |
52.00 |
933,374.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
395.3 |
TON |
80.00 |
31,624.00 |
75.00 |
29,647.50 |
150.00 |
59,295.00 |
|
|
| 507-01-A |
asphaltic surface treatment (1 application)
|
12,923   |
SQYD |
3.00 |
38,769.00 |
2.25 |
29,076.75 |
2.85 |
36,830.55 |
|
|
| 509-01-A |
cold planing asphaltic pavement (1 1/2" avg depth)
|
65,286   |
SQYD |
1.35 |
88,136.10 |
1.00 |
65,286.00 |
1.00 |
65,286.00 |
|
|
| 509-01-B |
cold planing asphaltic pavement (2 1/2" avg depth)
|
6,840   |
SQYD |
2.00 |
13,680.00 |
1.50 |
10,260.00 |
2.00 |
13,680.00 |
|
|
| 509-01-C |
cold planing asphaltic pavement (3 1/2" avg depth)
|
1,153   |
SQYD |
3.00 |
3,459.00 |
2.00 |
2,306.00 |
3.00 |
3,459.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,488   |
CUYD |
0.10 |
- 148.80 |
FREE |
FREE |
10.00 |
- 14,880.00 |
|
|
| 701-01-I |
cross drain pipe (24" rcp)
|
80   |
LNFT |
90.00 |
7,200.00 |
85.00 |
6,800.00 |
90.00 |
7,200.00 |
|
|
| 701-01-N |
cross drain pipe (42" rcp)
|
80   |
LNFT |
130.00 |
10,400.00 |
125.00 |
10,000.00 |
180.00 |
14,400.00 |
|
|
| 701-03-G |
storm drain pipe (18" rcp)
|
76   |
LNFT |
80.00 |
6,080.00 |
75.00 |
5,700.00 |
70.00 |
5,320.00 |
|
|
| 701-05-G |
side drain pipe (18")
|
32   |
LNFT |
75.00 |
2,400.00 |
70.00 |
2,240.00 |
70.00 |
2,240.00 |
|
|
| 701-05-I |
side drain pipe (24")
|
64   |
LNFT |
75.00 |
4,800.00 |
75.00 |
4,800.00 |
90.00 |
5,760.00 |
|
|
| 701-10-G |
reinforced concrete pipe (extension)(18")
|
72   |
LNFT |
75.00 |
5,400.00 |
75.00 |
5,400.00 |
110.00 |
7,920.00 |
|
|
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
16   |
LNFT |
110.00 |
1,760.00 |
120.00 |
1,920.00 |
190.00 |
3,040.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
3   |
EACH |
2,500.00 |
7,500.00 |
2,600.00 |
7,800.00 |
3,500.00 |
10,500.00 |
|
|
| 702-04-B |
adjusting catch basins
|
3   |
EACH |
1,500.00 |
4,500.00 |
1,500.00 |
4,500.00 |
1,200.00 |
3,600.00 |
|
|
| 706-02-C |
concrete drive (6" thick)
|
88.0 |
SQYD |
40.00 |
3,520.00 |
45.00 |
3,960.00 |
45.00 |
3,960.00 |
|
|
| 707-03 |
combination concrete curb & gutter
|
337.4 |
LNFT |
25.00 |
8,435.00 |
25.00 |
8,435.00 |
20.00 |
6,748.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
86,000.00 |
86,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
375   |
LNFT |
0.20 |
75.00 |
0.50 |
187.50 |
0.10 |
37.50 |
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
670   |
LNFT |
0.70 |
469.00 |
1.35 |
904.50 |
0.20 |
134.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
17.939 |
MILE |
400.00 |
7,175.60 |
320.00 |
5,740.48 |
150.00 |
2,690.85 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
10.998 |
MILE |
100.00 |
1,099.80 |
300.00 |
3,299.40 |
40.00 |
439.92 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
40.263 |
MILE |
10.00 |
402.63 |
300.00 |
12,078.90 |
50.00 |
2,013.15 |
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
18   |
EACH |
25.00 |
450.00 |
60.00 |
1,080.00 |
10.00 |
180.00 |
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
10   |
EACH |
25.00 |
250.00 |
60.00 |
600.00 |
10.00 |
100.00 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
200   |
SQYD |
75.00 |
15,000.00 |
60.00 |
12,000.00 |
50.00 |
10,000.00 |
|
|
| 724-02 |
pavement widening
|
13,086.9 |
SQYD |
28.00 |
366,433.20 |
30.00 |
392,607.00 |
36.00 |
471,128.40 |
|
|
| 726-01 |
bedding material
|
125.2 |
CUYD |
FREE |
FREE |
FREE |
FREE |
55.00 |
6,886.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
100,000.00 |
100,000.00 |
110,000.00 |
110,000.00 |
80,000.00 |
80,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
10   |
EACH |
50.00 |
500.00 |
55.00 |
550.00 |
70.00 |
700.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
10   |
EACH |
60.00 |
600.00 |
75.00 |
750.00 |
80.00 |
800.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
883   |
EACH |
6.00 |
5,298.00 |
6.00 |
5,298.00 |
5.50 |
4,856.50 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
225   |
LNFT |
1.50 |
337.50 |
1.00 |
225.00 |
1.00 |
225.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
618   |
LNFT |
3.50 |
2,163.00 |
3.00 |
1,854.00 |
3.00 |
1,854.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
17.893 |
MILE |
2,200.00 |
39,364.60 |
2,100.00 |
37,575.30 |
2,000.00 |
35,786.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.802 |
MILE |
600.00 |
2,281.20 |
800.00 |
3,041.60 |
700.00 |
2,661.40 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
8   |
EACH |
150.00 |
1,200.00 |
140.00 |
1,120.00 |
130.00 |
1,040.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
4   |
EACH |
150.00 |
600.00 |
150.00 |
600.00 |
140.00 |
560.00 |
|
|
| 732-05 |
removal of existing markings
|
0.188 |
MILE |
3,800.00 |
714.40 |
4,000.00 |
752.00 |
4,000.00 |
752.00 |
|
|
| 735-01 |
mailboxes
|
128   |
EACH |
1.00 |
128.00 |
2.00 |
256.00 |
1.00 |
128.00 |
|
|
| 735-02 |
mailbox supports (single)
|
66   |
EACH |
135.00 |
8,910.00 |
125.00 |
8,250.00 |
150.00 |
9,900.00 |
|
|
| 735-03 |
mailbox supports (double)
|
24   |
EACH |
175.00 |
4,200.00 |
150.00 |
3,600.00 |
250.00 |
6,000.00 |
|
|
| 735-04 |
mailbox supports (multiple)
|
9   |
EACH |
275.00 |
2,475.00 |
250.00 |
2,250.00 |
350.00 |
3,150.00 |
|
|
| 736-09 |
loop detector
|
358   |
LNFT |
10.00 |
3,580.00 |
12.00 |
4,296.00 |
10.00 |
3,580.00 |
|
|
| 736-10 |
underground junction box
|
4   |
EACH |
500.00 |
2,000.00 |
500.00 |
2,000.00 |
450.00 |
1,800.00 |
|
|
| 739-01 |
hydro-seeding
|
2.00 |
ACRE |
1,000.00 |
2,000.00 |
1,200.00 |
2,400.00 |
1,100.00 |
2,200.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
24,000.00 |
24,000.00 |
10,000.00 |
10,000.00 |
|
|
| S-001 |
selective tree trimming
|
1   |
EACH |
600.00 |
600.00 |
1,000.00 |
1,000.00 |
12,000.00 |
12,000.00 |
|
|
| S-002 |
ditch relocation
|
600   |
LNFT |
10.00 |
6,000.00 |
11.00 |
6,600.00 |
10.00 |
6,000.00 |
|
|
| S-003 |
fiberglass paving mat interlayer
|
69,648.3 |
SQYD |
3.00 |
208,944.90 |
3.00 |
208,944.90 |
2.50 |
174,120.75 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,944,180.13 |
|
1,981,237.33 |
|
2,128,508.02 |
|
|
|