| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
104   |
SQYD |
40.00 |
4,160.00 |
|
|
|
|
|
|
| 202-02-H |
removal of guard rail
|
1,984   |
LNFT |
3.30 |
6,547.20 |
|
|
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
11,300   |
CUYD |
9.55 |
107,915.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
425   |
CUYD |
10.00 |
4,250.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
27,123.6 |
TON |
55.35 |
1,501,291.26 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
1,925.0 |
TON |
51.03 |
98,232.75 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
3,997   |
SQYD |
8.22 |
32,855.34 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 222   |
CUYD |
1.00 |
- 222.00 |
|
|
|
|
|
|
| 701-01-G/I |
cross drain pipe 18" r.c.p. or 24" c.m.p.
|
50   |
LNFT |
110.00 |
5,500.00 |
|
|
|
|
|
|
| 701-01-I/K |
cross drain pipe 24" r.c.p. or 30" c.m.p.
|
48   |
LNFT |
120.00 |
5,760.00 |
|
|
|
|
|
|
| 701-10-G |
reinforced concrete pipe (extension)(18")
|
16   |
LNFT |
115.00 |
1,840.00 |
|
|
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
8   |
LNFT |
135.00 |
1,080.00 |
|
|
|
|
|
|
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
8   |
LNFT |
157.50 |
1,260.00 |
|
|
|
|
|
|
| 701-15 |
concrete collar
|
4   |
EACH |
650.00 |
2,600.00 |
|
|
|
|
|
|
| 704-01-A |
guard rail (single thrie beam){3' - 1 1/2" post
spacing} |
500.0 |
LNFT |
33.00 |
16,500.00 |
|
|
|
|
|
|
| 704-01-B |
guard rail (single thrie beam){6' - 3" post spacing}
|
874.0 |
LNFT |
47.85 |
41,820.90 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
500.0 |
LNFT |
17.30 |
8,650.00 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
20   |
EACH |
1,950.00 |
39,000.00 |
|
|
|
|
|
|
| 711-03-D |
riprap (55 lb)
|
232.0 |
TON |
72.00 |
16,704.00 |
|
|
|
|
|
|
| 711-04 |
geotextile fabric
|
425   |
SQYD |
2.50 |
1,062.50 |
|
|
|
|
|
|
| 712-02 |
sacked concrete revetment
|
150   |
SQYD |
65.00 |
9,750.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs and barricades
|
lump |
LUMP |
98,000.00 |
98,000.00 |
|
|
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
88   |
LNFT |
0.10 |
8.80 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line){4" width}{4'
length} |
19.417 |
MILE |
1.00 |
19.41 |
|
|
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line){4"
width}{10' length} |
8.341 |
MILE |
1.00 |
8.34 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line){4" width}
|
64.942 |
MILE |
1.00 |
64.94 |
|
|
|
|
|
|
| 716-01-B |
mulch (fiber)
|
28.00 |
ACRE |
625.00 |
17,500.00 |
|
|
|
|
|
|
| 724-01-A |
pavement patching (6" minimum thickness)
|
1,210   |
SQYD |
45.60 |
55,176.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
98,000.00 |
98,000.00 |
|
|
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
26   |
EACH |
50.00 |
1,300.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
36   |
EACH |
70.00 |
2,520.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,278   |
EACH |
4.75 |
6,070.50 |
|
|
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
352   |
LNFT |
0.88 |
309.76 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
77   |
LNFT |
2.90 |
223.30 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line)(4" width)
|
32.570 |
MILE |
1,890.00 |
61,557.30 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.828 |
MILE |
720.00 |
3,476.16 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
32   |
EACH |
1.00 |
32.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
28   |
EACH |
125.00 |
3,500.00 |
|
|
|
|
|
|
| 735-03 |
mailbox supports (double)
|
2   |
EACH |
175.00 |
350.00 |
|
|
|
|
|
|
| 739-01 |
hydro-seeding
|
28.00 |
ACRE |
1,300.00 |
36,400.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
25,000.00 |
25,000.00 |
|
|
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
18.66 |
CUYD |
1,100.00 |
20,526.00 |
|
|
|
|
|
|
| 805-12-E |
reinforced concrete box culverts (4' x 4')
|
32.0 |
LNFT |
1,100.00 |
35,200.00 |
|
|
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
1,333   |
LB |
2.20 |
2,932.60 |
|
|
|
|
|
|
| S-001 |
raised asphalt concrete median (4" thick)
|
148.6 |
SQYD |
46.45 |
6,902.47 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,381,634.53 |
|
|
|
|
|
|
|