| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - HUEY STOCKSTILL, INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
1,997   |
LNFT |
4.00 |
7,988.00 |
4.00 |
7,988.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
2,300   |
CUYD |
10.00 |
23,000.00 |
12.00 |
27,600.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
49,634.8 |
TON |
49.00 |
2,432,105.20 |
46.00 |
2,283,200.80 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
2,900.0 |
TON |
49.00 |
142,100.00 |
46.00 |
133,400.00 |
|
|
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
1,800   |
LNFT |
2.00 |
3,600.00 |
3.00 |
5,400.00 |
|
|
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
2,200   |
LNFT |
2.50 |
5,500.00 |
3.00 |
6,600.00 |
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
12.5 |
LNFT |
44.00 |
550.00 |
43.00 |
537.50 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
1,680.5 |
LNFT |
18.00 |
30,249.00 |
20.00 |
33,610.00 |
|
|
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
50.0 |
LNFT |
50.00 |
2,500.00 |
38.00 |
1,900.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
25.0 |
LNFT |
65.00 |
1,625.00 |
43.00 |
1,075.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
1   |
EACH |
2,000.00 |
2,000.00 |
2,000.00 |
2,000.00 |
|
|
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
5   |
EACH |
2,500.00 |
12,500.00 |
2,500.00 |
12,500.00 |
|
|
|
|
| 711-03-C |
riprap (30 lb)
|
8,568.2 |
TON |
45.00 |
385,569.00 |
44.00 |
377,000.80 |
|
|
|
|
| 711-04 |
geotextile fabric
|
7,700   |
SQYD |
1.00 |
7,700.00 |
2.00 |
15,400.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
30,000.00 |
30,000.00 |
60,000.00 |
60,000.00 |
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
582   |
LNFT |
0.10 |
58.20 |
0.10 |
58.20 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
336   |
LNFT |
0.30 |
100.80 |
0.30 |
100.80 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
17.462 |
MILE |
20.00 |
349.24 |
500.00 |
8,731.00 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
20.319 |
MILE |
20.00 |
406.38 |
10.00 |
203.19 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
77.058 |
MILE |
30.00 |
2,311.74 |
20.00 |
1,541.16 |
|
|
|
|
| 724-01-A |
pavement patching (6" minimum thickness)
|
500   |
SQYD |
20.00 |
10,000.00 |
20.00 |
10,000.00 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
2,500   |
SQYD |
30.00 |
75,000.00 |
20.00 |
50,000.00 |
|
|
|
|
| 724-03 |
pavement joint repair
|
2,000.0 |
TON |
49.00 |
98,000.00 |
140.00 |
280,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
343,000.00 |
343,000.00 |
339,000.00 |
339,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
6   |
EACH |
80.00 |
480.00 |
80.00 |
480.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,400   |
EACH |
5.00 |
7,000.00 |
4.50 |
6,300.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
194   |
LNFT |
1.00 |
194.00 |
1.00 |
194.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
112   |
LNFT |
3.00 |
336.00 |
3.00 |
336.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
25.686 |
MILE |
1,800.00 |
46,234.80 |
2,000.00 |
51,372.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
6.773 |
MILE |
700.00 |
4,741.10 |
1,000.00 |
6,773.00 |
|
|
|
|
| 735-01 |
mailboxes
|
120   |
EACH |
5.00 |
600.00 |
5.00 |
600.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
120   |
EACH |
100.00 |
12,000.00 |
110.00 |
13,200.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| S-001 |
rumble strips (ground-in)
|
17.5 |
MILE |
625.00 |
10,937.50 |
600.00 |
10,500.00 |
|
|
|
|
| S-002 |
variable message sign unit
|
2   |
EACH |
6,000.00 |
12,000.00 |
12,000.00 |
24,000.00 |
|
|
|
|
| S-003 |
nonplastic embankment (stone) (vehicular measurement)
|
2,220   |
CUYD |
54.00 |
119,880.00 |
50.00 |
111,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,845,615.96 |
|
3,887,601.45 |
|
|
|
|
|