| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - SPECIALTY CONTRACTORS |
- 2 - SEALEVEL CONSTRUCTION INC |
- 3 - LINCOLN CONCRETE, INC. |
- 4 - STRANCO, INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
35,000.00 |
35,000.00 |
8,200.00 |
8,200.00 |
40,000.00 |
40,000.00 |
11,020.00 |
11,020.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
FREE |
FREE |
5,000.00 |
5,000.00 |
FREE |
FREE |
10,150.00 |
10,150.00 |
| 202-02-03 |
removal of 4' metal sewer system w/septic tank (rt. of
sta. 34+04) |
1   |
EACH |
FREE |
FREE |
500.00 |
500.00 |
1,500.00 |
1,500.00 |
2,000.00 |
2,000.00 |
| 202-02-06 |
removal of 4'x 8' metal sign (lt. of sta. 49+69)
|
1   |
EACH |
100.00 |
100.00 |
115.00 |
115.00 |
1.00 |
1.00 |
500.00 |
500.00 |
| 202-02-07 |
removal of 25'x 34' building slab (sta. 51+34)
|
1   |
EACH |
500.00 |
500.00 |
1,000.00 |
1,000.00 |
2,500.00 |
2,500.00 |
2,850.00 |
2,850.00 |
| 202-02-08 |
removal of 2" metal pipe sign frame (lt. of sta. 52+68)
|
1   |
EACH |
100.00 |
100.00 |
100.00 |
100.00 |
1.00 |
1.00 |
500.00 |
500.00 |
| 202-02-09 |
removal of 1.5'x 8' masonary sign post (lt. of sta.
52+87) |
1   |
EACH |
100.00 |
100.00 |
115.00 |
115.00 |
1.00 |
1.00 |
500.00 |
500.00 |
| 202-02-10 |
removal of 16' dia. masonary pond (lt. of sta. 54+11)
|
1   |
EACH |
100.00 |
100.00 |
475.00 |
475.00 |
500.00 |
500.00 |
1,500.00 |
1,500.00 |
| 202-02-11 |
removal of 8' dia. masonary concrete slab (lt. of sta.
54+16) |
1   |
EACH |
100.00 |
100.00 |
400.00 |
400.00 |
250.00 |
250.00 |
500.00 |
500.00 |
| 202-02-15 |
removal of 4'x 362' barb wire fence (rt. of sta. 23+44)
|
1   |
EACH |
100.00 |
100.00 |
700.00 |
700.00 |
1.00 |
1.00 |
800.00 |
800.00 |
| 202-02-20 |
removal of 4' metal fence (rt. of sta. 38+61)
|
1   |
EACH |
400.00 |
400.00 |
175.00 |
175.00 |
1.00 |
1.00 |
700.00 |
700.00 |
| 202-02-22 |
removal of 12' asphalt drive (rt. of sta. 39+98)
|
1   |
EACH |
100.00 |
100.00 |
650.00 |
650.00 |
500.00 |
500.00 |
2,000.00 |
2,000.00 |
| 202-02-23 |
removal of 5'x8' sign (other)(lt. of sta. 45+01)
|
1   |
EACH |
100.00 |
100.00 |
125.00 |
125.00 |
1.00 |
1.00 |
500.00 |
500.00 |
| 202-02-24 |
removal of 4'x8' sign (other)(lt. of sta. 45+01)
|
1   |
EACH |
100.00 |
100.00 |
175.00 |
175.00 |
1.00 |
1.00 |
500.00 |
500.00 |
| 202-02-25 |
removal of 6'x12' metal billboard (rt. of sta. 47+54)
|
1   |
EACH |
100.00 |
100.00 |
330.00 |
330.00 |
1.00 |
1.00 |
500.00 |
500.00 |
| 202-02-26 |
removal of 8'x20' sign (other)(lt. of sta. 46+86)
|
1   |
EACH |
100.00 |
100.00 |
385.00 |
385.00 |
1.00 |
1.00 |
600.00 |
600.00 |
| 202-02-27 |
removal of 10' metal sign post (lt. of sta. 47+68)
|
1   |
EACH |
100.00 |
100.00 |
115.00 |
115.00 |
1.00 |
1.00 |
300.00 |
300.00 |
| 202-02-28 |
removal of 6'x12' metal billboard (rt. of sta. 48+86)
|
1   |
EACH |
100.00 |
100.00 |
285.00 |
285.00 |
1.00 |
1.00 |
450.00 |
450.00 |
| 202-02-29 |
removal of 4" metal field drain sewer (lt. of sta.
49+73) |
1   |
EACH |
FREE |
FREE |
550.00 |
550.00 |
1.00 |
1.00 |
500.00 |
500.00 |
| 202-02-30 |
removal of 25'x65' masonary concrete slab (rt. of sta.
51+34) |
1   |
EACH |
FREE |
FREE |
3,100.00 |
3,100.00 |
1,000.00 |
1,000.00 |
3,500.00 |
3,500.00 |
| 202-02-32 |
removal of 3'x70' masonary fence (lt. of sta. 53+49)
|
1   |
EACH |
100.00 |
100.00 |
875.00 |
875.00 |
500.00 |
500.00 |
2,000.00 |
2,000.00 |
| 202-02-35 |
removal of 4'x8' sign (other)(lt. of sta. 54+99)
|
1   |
EACH |
100.00 |
100.00 |
125.00 |
125.00 |
1.00 |
1.00 |
350.00 |
350.00 |
| 202-02-36 |
removal of 3'x 182' metal fence (lt. of sta. 56+41)
|
1   |
EACH |
100.00 |
100.00 |
430.00 |
430.00 |
500.00 |
500.00 |
1,500.00 |
1,500.00 |
| 202-02-37 |
removal of 12' metal sign post (lt. of sta. 57+74)
|
1   |
EACH |
100.00 |
100.00 |
145.00 |
145.00 |
50.00 |
50.00 |
300.00 |
300.00 |
| 204-02 |
temporary hay or straw bales
|
110   |
EACH |
10.00 |
1,100.00 |
35.00 |
3,850.00 |
FREE |
FREE |
4.00 |
440.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
9   |
EACH |
60.00 |
540.00 |
175.00 |
1,575.00 |
FREE |
FREE |
350.00 |
3,150.00 |
| 204-06 |
temporary silt fencing
|
1,800   |
LNFT |
1.25 |
2,250.00 |
1.85 |
3,330.00 |
FREE |
FREE |
3.00 |
5,400.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
200.0 |
CUYD |
1.00 |
200.00 |
75.00 |
15,000.00 |
FREE |
FREE |
36.00 |
7,200.00 |
| 705-06-A |
chain link fence (4-foot height)
|
161   |
LNFT |
11.00 |
1,771.00 |
15.00 |
2,415.00 |
15.00 |
2,415.00 |
10.00 |
1,610.00 |
| 705-07-A |
3-foot single gates for chain link fence (4-foot
height) |
1   |
EACH |
150.00 |
150.00 |
650.00 |
650.00 |
400.00 |
400.00 |
200.00 |
200.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
3,000.00 |
3,000.00 |
3,100.00 |
3,100.00 |
5,500.00 |
5,500.00 |
2,000.00 |
2,000.00 |
| 717-01 |
seeding
|
90   |
LB |
8.00 |
720.00 |
9.00 |
810.00 |
10.00 |
900.00 |
10.00 |
900.00 |
| 718-01 |
fertilizer
|
3,000   |
LB |
0.30 |
900.00 |
0.50 |
1,500.00 |
0.40 |
1,200.00 |
1.00 |
3,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
5,000.00 |
5,000.00 |
3,750.00 |
3,750.00 |
6,500.00 |
6,500.00 |
7,000.00 |
7,000.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
5,000.00 |
5,000.00 |
6,250.00 |
6,250.00 |
3,000.00 |
3,000.00 |
10,000.00 |
10,000.00 |
| S-001 |
tree trimming
|
lump |
LUMP |
FREE |
FREE |
1,900.00 |
1,900.00 |
1,000.00 |
1,000.00 |
1,500.00 |
1,500.00 |
| S-002 |
root pruning
|
lump |
LUMP |
FREE |
FREE |
1,150.00 |
1,150.00 |
1,500.00 |
1,500.00 |
1,500.00 |
1,500.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
58,231.00 |
|
69,350.00 |
|
69,728.00 |
|
87,920.00 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - KOSTMAYER CONSTRUCTION, LLC |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
11,000.00 |
11,000.00 |
|
|
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
4,200.00 |
4,200.00 |
|
|
|
|
|
|
| 202-02-03 |
removal of 4' metal sewer system w/septic tank (rt. of
sta. 34+04) |
1   |
EACH |
1,800.00 |
1,800.00 |
|
|
|
|
|
|
| 202-02-06 |
removal of 4'x 8' metal sign (lt. of sta. 49+69)
|
1   |
EACH |
1,200.00 |
1,200.00 |
|
|
|
|
|
|
| 202-02-07 |
removal of 25'x 34' building slab (sta. 51+34)
|
1   |
EACH |
3,600.00 |
3,600.00 |
|
|
|
|
|
|
| 202-02-08 |
removal of 2" metal pipe sign frame (lt. of sta. 52+68)
|
1   |
EACH |
1,200.00 |
1,200.00 |
|
|
|
|
|
|
| 202-02-09 |
removal of 1.5'x 8' masonary sign post (lt. of sta.
52+87) |
1   |
EACH |
1,200.00 |
1,200.00 |
|
|
|
|
|
|
| 202-02-10 |
removal of 16' dia. masonary pond (lt. of sta. 54+11)
|
1   |
EACH |
1,200.00 |
1,200.00 |
|
|
|
|
|
|
| 202-02-11 |
removal of 8' dia. masonary concrete slab (lt. of sta.
54+16) |
1   |
EACH |
1,200.00 |
1,200.00 |
|
|
|
|
|
|
| 202-02-15 |
removal of 4'x 362' barb wire fence (rt. of sta. 23+44)
|
1   |
EACH |
1,200.00 |
1,200.00 |
|
|
|
|
|
|
| 202-02-20 |
removal of 4' metal fence (rt. of sta. 38+61)
|
1   |
EACH |
1,200.00 |
1,200.00 |
|
|
|
|
|
|
| 202-02-22 |
removal of 12' asphalt drive (rt. of sta. 39+98)
|
1   |
EACH |
1,200.00 |
1,200.00 |
|
|
|
|
|
|
| 202-02-23 |
removal of 5'x8' sign (other)(lt. of sta. 45+01)
|
1   |
EACH |
1,200.00 |
1,200.00 |
|
|
|
|
|
|
| 202-02-24 |
removal of 4'x8' sign (other)(lt. of sta. 45+01)
|
1   |
EACH |
1,200.00 |
1,200.00 |
|
|
|
|
|
|
| 202-02-25 |
removal of 6'x12' metal billboard (rt. of sta. 47+54)
|
1   |
EACH |
1,200.00 |
1,200.00 |
|
|
|
|
|
|
| 202-02-26 |
removal of 8'x20' sign (other)(lt. of sta. 46+86)
|
1   |
EACH |
1,200.00 |
1,200.00 |
|
|
|
|
|
|
| 202-02-27 |
removal of 10' metal sign post (lt. of sta. 47+68)
|
1   |
EACH |
1,200.00 |
1,200.00 |
|
|
|
|
|
|
| 202-02-28 |
removal of 6'x12' metal billboard (rt. of sta. 48+86)
|
1   |
EACH |
1,200.00 |
1,200.00 |
|
|
|
|
|
|
| 202-02-29 |
removal of 4" metal field drain sewer (lt. of sta.
49+73) |
1   |
EACH |
1,200.00 |
1,200.00 |
|
|
|
|
|
|
| 202-02-30 |
removal of 25'x65' masonary concrete slab (rt. of sta.
51+34) |
1   |
EACH |
2,900.00 |
2,900.00 |
|
|
|
|
|
|
| 202-02-32 |
removal of 3'x70' masonary fence (lt. of sta. 53+49)
|
1   |
EACH |
1,200.00 |
1,200.00 |
|
|
|
|
|
|
| 202-02-35 |
removal of 4'x8' sign (other)(lt. of sta. 54+99)
|
1   |
EACH |
1,200.00 |
1,200.00 |
|
|
|
|
|
|
| 202-02-36 |
removal of 3'x 182' metal fence (lt. of sta. 56+41)
|
1   |
EACH |
1,200.00 |
1,200.00 |
|
|
|
|
|
|
| 202-02-37 |
removal of 12' metal sign post (lt. of sta. 57+74)
|
1   |
EACH |
1,200.00 |
1,200.00 |
|
|
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
110   |
EACH |
10.00 |
1,100.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
9   |
EACH |
240.00 |
2,160.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
1,800   |
LNFT |
5.00 |
9,000.00 |
|
|
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
200.0 |
CUYD |
60.00 |
12,000.00 |
|
|
|
|
|
|
| 705-06-A |
chain link fence (4-foot height)
|
161   |
LNFT |
16.00 |
2,576.00 |
|
|
|
|
|
|
| 705-07-A |
3-foot single gates for chain link fence (4-foot
height) |
1   |
EACH |
360.00 |
360.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
6,000.00 |
6,000.00 |
|
|
|
|
|
|
| 717-01 |
seeding
|
90   |
LB |
12.00 |
1,080.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
3,000   |
LB |
0.50 |
1,500.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
22,000.00 |
22,000.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
25,000.00 |
25,000.00 |
|
|
|
|
|
|
| S-001 |
tree trimming
|
lump |
LUMP |
4,800.00 |
4,800.00 |
|
|
|
|
|
|
| S-002 |
root pruning
|
lump |
LUMP |
4,800.00 |
4,800.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
138,676.00 |
|
|
|
|
|
|
|