| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - COVINGTON PAVING CO. |
- 2 - BARRIERE CONSTRUCTION CO., LLC. |
- 3 - HUEY STOCKSTILL, INC. |
- 4 - BOH BROS. CONSTRUCTION CO., LLC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
2,102   |
LNFT |
2.50 |
5,255.00 |
10.50 |
22,071.00 |
3.00 |
6,306.00 |
2.60 |
5,465.20 |
| 203-08 |
borrow (vehicular measurement)
|
4,060   |
CUYD |
9.00 |
36,540.00 |
11.00 |
44,660.00 |
10.00 |
40,600.00 |
3.00 |
12,180.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,640   |
CUYD |
28.77 |
47,182.80 |
36.00 |
59,040.00 |
16.00 |
26,240.00 |
17.00 |
27,880.00 |
| 502-01 |
superpave asphaltic concrete
|
22,039.9 |
TON |
44.47 |
980,114.35 |
44.00 |
969,755.60 |
47.00 |
1,035,875.30 |
52.00 |
1,146,074.80 |
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
1,350.4 |
TON |
54.70 |
73,866.88 |
44.00 |
59,417.60 |
80.00 |
108,032.00 |
95.00 |
128,288.00 |
| 509-01 |
cold planing asphaltic pavement
|
80,133   |
SQYD |
0.85 |
68,113.05 |
1.20 |
96,159.60 |
1.00 |
80,133.00 |
1.00 |
80,133.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,226   |
CUYD |
3.00 |
- 6,678.00 |
15.00 |
- 33,390.00 |
FREE |
FREE |
6.00 |
- 13,356.00 |
| 701-02-D/D |
cross drain pipe arch (24" equiv. rcpa or 24" equiv.
cmpa) |
192   |
LNFT |
55.00 |
10,560.00 |
75.00 |
14,400.00 |
54.00 |
10,368.00 |
74.00 |
14,208.00 |
| 701-02-D/E |
cross drain pipe arch (24" equiv. rcpa or 30" equiv.
cmpa) |
152   |
LNFT |
75.00 |
11,400.00 |
105.00 |
15,960.00 |
58.00 |
8,816.00 |
74.00 |
11,248.00 |
| 701-02-E/F |
cross drain pipe arch (30" equiv. rcpa or 36" equiv.
cmpa) |
56   |
LNFT |
80.00 |
4,480.00 |
110.00 |
6,160.00 |
79.00 |
4,424.00 |
100.00 |
5,600.00 |
| 701-02-F/G |
cross drain pipe arch (36" equiv. rcpa or 42" equiv.
cmpa) |
96   |
LNFT |
100.00 |
9,600.00 |
115.00 |
11,040.00 |
74.00 |
7,104.00 |
138.00 |
13,248.00 |
| 701-02-J/L |
cross drain pipe arch (60" equiv. rcpa or 72" equiv.
cmpa) |
56   |
LNFT |
175.00 |
9,800.00 |
220.00 |
12,320.00 |
200.00 |
11,200.00 |
365.00 |
20,440.00 |
| 701-12-I |
corrugated metal pipe (extension)(24")
|
6   |
LNFT |
100.00 |
600.00 |
100.00 |
600.00 |
147.00 |
882.00 |
115.00 |
690.00 |
| 701-13-D |
corrugated metal pipe arch (extension)(24" equiv.)
|
8   |
LNFT |
110.00 |
880.00 |
150.00 |
1,200.00 |
117.00 |
936.00 |
115.00 |
920.00 |
| 701-13-F |
corrugated metal pipe arch (extension)(36" equiv.)
|
4   |
LNFT |
135.00 |
540.00 |
200.00 |
800.00 |
300.00 |
1,200.00 |
195.00 |
780.00 |
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
343.8 |
LNFT |
29.00 |
9,970.20 |
30.00 |
10,314.00 |
40.00 |
13,752.00 |
42.00 |
14,439.60 |
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
1,230.0 |
LNFT |
44.50 |
54,735.00 |
47.00 |
57,810.00 |
55.00 |
67,650.00 |
42.00 |
51,660.00 |
| 704-03 |
blocked out guard rail
|
300.1 |
LNFT |
16.00 |
4,801.60 |
17.00 |
5,101.70 |
17.00 |
5,101.70 |
19.00 |
5,701.90 |
| 704-05 |
guard rail anchor sections (bct)
|
12.5 |
LNFT |
45.50 |
568.75 |
47.00 |
587.50 |
70.00 |
875.00 |
85.00 |
1,062.50 |
| 704-11-A |
guard rail end treatment (flared)
|
15   |
EACH |
1,800.00 |
27,000.00 |
2,000.00 |
30,000.00 |
2,000.00 |
30,000.00 |
1,775.00 |
26,625.00 |
| 711-03-C |
riprap (30 lb)
|
25.0 |
TON |
50.00 |
1,250.00 |
70.00 |
1,750.00 |
100.00 |
2,500.00 |
60.00 |
1,500.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
20,000.00 |
20,000.00 |
30,000.00 |
30,000.00 |
25,000.00 |
25,000.00 |
50,000.00 |
50,000.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
5.590 |
MILE |
1,810.00 |
10,117.90 |
130.00 |
726.70 |
400.00 |
2,236.00 |
10.00 |
55.90 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
5.300 |
MILE |
270.00 |
1,431.00 |
20.00 |
106.00 |
240.00 |
1,272.00 |
10.00 |
53.00 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
39.160 |
MILE |
475.00 |
18,601.00 |
50.00 |
1,958.00 |
450.00 |
17,622.00 |
20.00 |
783.20 |
| 717-01 |
seeding
|
102   |
LB |
8.00 |
816.00 |
27.00 |
2,754.00 |
25.00 |
2,550.00 |
8.00 |
816.00 |
| 718-01 |
fertilizer
|
3,388   |
LB |
0.18 |
609.84 |
1.60 |
5,420.80 |
1.50 |
5,082.00 |
0.50 |
1,694.00 |
| 721-01 |
asphalt mulch
|
8,199   |
GAL |
0.10 |
819.90 |
0.15 |
1,229.85 |
0.10 |
819.90 |
1.00 |
8,199.00 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
500   |
SQYD |
48.00 |
24,000.00 |
50.00 |
25,000.00 |
60.00 |
30,000.00 |
70.00 |
35,000.00 |
| 726-01 |
bedding material
|
228.0 |
CUYD |
35.00 |
7,980.00 |
47.00 |
10,716.00 |
47.00 |
10,716.00 |
64.00 |
14,592.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
13,400.00 |
13,400.00 |
130,000.00 |
130,000.00 |
180,000.00 |
180,000.00 |
125,000.00 |
125,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
58   |
EACH |
70.00 |
4,060.00 |
45.00 |
2,610.00 |
80.00 |
4,640.00 |
85.00 |
4,930.00 |
| 731-02 |
reflectorized raised pavement markers
|
738   |
EACH |
4.90 |
3,616.20 |
5.00 |
3,690.00 |
5.00 |
3,690.00 |
5.00 |
3,690.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
19.580 |
MILE |
1,780.00 |
34,852.40 |
1,900.00 |
37,202.00 |
2,000.00 |
39,160.00 |
1,770.00 |
34,656.60 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.650 |
MILE |
710.00 |
1,881.50 |
800.00 |
2,120.00 |
1,000.00 |
2,650.00 |
700.00 |
1,855.00 |
| 735-01 |
mailboxes
|
50   |
EACH |
8.00 |
400.00 |
5.00 |
250.00 |
5.00 |
250.00 |
1.00 |
50.00 |
| 735-02 |
mailbox supports (single)
|
50   |
EACH |
125.00 |
6,250.00 |
120.00 |
6,000.00 |
130.00 |
6,500.00 |
115.00 |
5,750.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
4,000.00 |
4,000.00 |
20,000.00 |
20,000.00 |
13,000.00 |
13,000.00 |
10,000.00 |
10,000.00 |
| S-001 |
u-channel post installation
|
67   |
EACH |
50.00 |
3,350.00 |
50.00 |
3,350.00 |
60.00 |
4,020.00 |
50.00 |
3,350.00 |
| S-002 |
cleaning existing ditches
|
2,400   |
LNFT |
2.50 |
6,000.00 |
5.00 |
12,000.00 |
5.00 |
12,000.00 |
1.25 |
3,000.00 |
| S-003 |
nailing of deck boards
|
300   |
LB |
18.40 |
5,520.00 |
15.00 |
4,500.00 |
25.00 |
7,500.00 |
17.00 |
5,100.00 |
| S-004 |
relocating existing ditch
|
1,000   |
LNFT |
5.00 |
5,000.00 |
5.50 |
5,500.00 |
5.00 |
5,000.00 |
3.00 |
3,000.00 |
| S-005 |
labor charge to repair deck board sections
|
1,700   |
LNFT |
11.50 |
19,550.00 |
3.00 |
5,100.00 |
12.00 |
20,400.00 |
3.50 |
5,950.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,542,835.37 |
|
1,695,990.35 |
|
1,856,102.90 |
|
1,872,312.70 |
|