| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - D & J CONSTRUCTION CO., INC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
20,000.00 |
20,000.00 |
12,000.00 |
12,000.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
1,050   |
CUYD |
12.00 |
12,600.00 |
21.19 |
22,249.50 |
|
|
|
|
| 304-01 |
lime
|
17.84 |
TON |
150.00 |
2,676.00 |
110.00 |
1,962.40 |
|
|
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
1,888   |
SQYD |
2.00 |
3,776.00 |
8.18 |
15,443.84 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
88   |
CUYD |
55.00 |
4,840.00 |
64.00 |
5,632.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
9,301.1 |
TON |
58.00 |
539,463.80 |
52.75 |
490,633.02 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
202.6 |
TON |
128.00 |
25,932.80 |
125.00 |
25,325.00 |
|
|
|
|
| 507-01-B |
asphaltic surface treatment (2 applications)
|
48,528   |
SQYD |
2.00 |
97,056.00 |
2.75 |
133,452.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
50,182   |
SQYD |
2.00 |
100,364.00 |
2.00 |
100,364.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,816   |
CUYD |
0.01 |
- 18.16 |
0.10 |
- 181.60 |
|
|
|
|
| 701-05-G |
side drain pipe (18")
|
32   |
LNFT |
75.00 |
2,400.00 |
68.00 |
2,176.00 |
|
|
|
|
| 701-10-G |
reinforced concrete pipe (extension)(18")
|
12   |
LNFT |
125.00 |
1,500.00 |
78.00 |
936.00 |
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
14   |
LNFT |
150.00 |
2,100.00 |
90.00 |
1,260.00 |
|
|
|
|
| 701-14 |
cleaning existing pipes
|
108   |
LNFT |
12.00 |
1,296.00 |
12.00 |
1,296.00 |
|
|
|
|
| 701-15 |
concrete collar
|
4   |
EACH |
600.00 |
2,400.00 |
850.00 |
3,400.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
75,000.00 |
75,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
10.340 |
MILE |
165.00 |
1,706.10 |
145.00 |
1,499.30 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
10.020 |
MILE |
1.00 |
10.02 |
318.00 |
3,186.36 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
23.523 |
MILE |
1.00 |
23.52 |
635.00 |
14,937.10 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
5.00 |
ACRE |
800.00 |
4,000.00 |
850.00 |
4,250.00 |
|
|
|
|
| 717-01 |
seeding
|
225   |
LB |
8.00 |
1,800.00 |
6.00 |
1,350.00 |
|
|
|
|
| 718-01 |
fertilizer
|
5,000   |
LB |
0.30 |
1,500.00 |
0.26 |
1,300.00 |
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
5,000.00 |
5,000.00 |
7,500.00 |
7,500.00 |
|
|
|
|
| 724-01-C |
pavement patching (18" minimum thickness)
|
448   |
SQYD |
150.00 |
67,200.00 |
100.00 |
44,800.00 |
|
|
|
|
| 724-03 |
pavement joint repair
|
1,000.0 |
TON |
75.00 |
75,000.00 |
185.00 |
185,000.00 |
|
|
|
|
| 726-01 |
bedding material
|
148.5 |
CUYD |
65.00 |
9,652.50 |
53.00 |
7,870.50 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
140,000.00 |
140,000.00 |
45,000.00 |
45,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
455   |
EACH |
7.50 |
3,412.50 |
5.00 |
2,275.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
7.841 |
MILE |
2,850.00 |
22,346.85 |
2,000.00 |
15,682.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.340 |
MILE |
1,000.00 |
3,340.00 |
837.00 |
2,795.58 |
|
|
|
|
| 735-01 |
mailboxes
|
3   |
EACH |
1.00 |
3.00 |
12.00 |
36.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
3   |
EACH |
500.00 |
1,500.00 |
230.00 |
690.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
18,600.00 |
18,600.00 |
|
|
|
|
| 805-01-A |
class a concrete (pipe headwalls)
|
3.80 |
CUYD |
800.00 |
3,040.00 |
742.00 |
2,819.60 |
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
38.87 |
CUYD |
725.00 |
28,180.75 |
635.00 |
24,682.45 |
|
|
|
|
| 805-12-B |
reinforced concrete box culverts (5'x 3')
|
64.0 |
LNFT |
355.00 |
22,720.00 |
371.00 |
23,744.00 |
|
|
|
|
| 805-12-E |
reinforced concrete box culverts (4'x 4')
|
84.0 |
LNFT |
345.00 |
28,980.00 |
371.00 |
31,164.00 |
|
|
|
|
| 805-12-Y |
reinforced concrete box culverts (3'x 3')
|
108.0 |
LNFT |
335.00 |
36,180.00 |
371.00 |
40,068.00 |
|
|
|
|
| 805-12-Z |
reinforced concrete box culverts (5'x 2')
|
14.0 |
LNFT |
325.00 |
4,550.00 |
371.00 |
5,194.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
3,406   |
LB |
2.00 |
6,812.00 |
2.00 |
6,812.00 |
|
|
|
|
| S-001 |
cement treated base course (12 in depth)
|
32,617   |
SQYD |
5.40 |
176,131.80 |
8.00 |
260,936.00 |
|
|
|
|
| S-002 |
cleaning existing ditches
|
900   |
LNFT |
10.00 |
9,000.00 |
5.00 |
4,500.00 |
|
|
|
|
| S-003 |
relocating existing ditches
|
50   |
LNFT |
20.00 |
1,000.00 |
70.00 |
3,500.00 |
|
|
|
|
| S-004 |
rumble strips (ground-in)
|
6.9 |
MILE |
930.00 |
6,417.00 |
900.00 |
6,210.00 |
|
|
|
|
| S-005 |
tree trimming
|
lump |
LUMP |
18,000.00 |
18,000.00 |
14,000.00 |
14,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,588,892.48 |
|
1,606,350.05 |
|
|
|
|
|