| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - BOH BROS. CONSTRUCTION CO., LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
3,643   |
LNFT |
4.00 |
14,572.00 |
4.00 |
14,572.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
1,400   |
CUYD |
10.00 |
14,000.00 |
8.00 |
11,200.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
1,180.3 |
TON |
75.00 |
88,522.50 |
90.00 |
106,227.00 |
|
|
|
|
| 508-01 |
asphalt concrete (sma) wearing course
|
15,852.9 |
TON |
67.00 |
1,062,144.30 |
60.00 |
951,174.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
134,808   |
SQYD |
2.70 |
363,981.60 |
1.75 |
235,914.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 7,490   |
CUYD |
10.00 |
- 74,900.00 |
11.00 |
- 82,390.00 |
|
|
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
1,000   |
LNFT |
4.00 |
4,000.00 |
5.00 |
5,000.00 |
|
|
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
1,000   |
LNFT |
4.00 |
4,000.00 |
5.00 |
5,000.00 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
650.0 |
LNFT |
32.00 |
20,800.00 |
33.00 |
21,450.00 |
|
|
|
|
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
131.3 |
LNFT |
48.00 |
6,302.40 |
50.00 |
6,565.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
2,031.3 |
LNFT |
20.00 |
40,626.00 |
20.00 |
40,626.00 |
|
|
|
|
| 704-06 |
guard rail anchor sections (trailing end)
|
6.3 |
LNFT |
65.00 |
409.50 |
70.00 |
441.00 |
|
|
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
50.0 |
LNFT |
75.00 |
3,750.00 |
78.00 |
3,900.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
225.0 |
LNFT |
44.00 |
9,900.00 |
45.00 |
10,125.00 |
|
|
|
|
| 704-10 |
guard rail anchor block
|
8   |
EACH |
1,500.00 |
12,000.00 |
1,400.00 |
11,200.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
17   |
EACH |
2,000.00 |
34,000.00 |
2,000.00 |
34,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
150,000.00 |
150,000.00 |
350,000.00 |
350,000.00 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
2,217   |
LNFT |
0.10 |
221.70 |
1.50 |
3,325.50 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
6.000 |
MILE |
10.00 |
60.00 |
200.00 |
1,200.00 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
24.600 |
MILE |
10.00 |
246.00 |
270.00 |
6,642.00 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
42.450 |
MILE |
100.00 |
4,245.00 |
500.00 |
21,225.00 |
|
|
|
|
| 713-05-B |
temporary pavement markings (solid line)(8" width)
|
3.650 |
MILE |
100.00 |
365.00 |
1,100.00 |
4,015.00 |
|
|
|
|
| 724-01-A |
pavement patching (6" minimum thickness)
|
300   |
SQYD |
35.00 |
10,500.00 |
40.00 |
12,000.00 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
1,100   |
SQYD |
45.00 |
49,500.00 |
80.00 |
88,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
220,000.00 |
220,000.00 |
200,000.00 |
200,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
26   |
EACH |
65.00 |
1,690.00 |
70.00 |
1,820.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
2,528   |
EACH |
6.00 |
15,168.00 |
6.50 |
16,432.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
739   |
LNFT |
5.00 |
3,695.00 |
5.50 |
4,064.50 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
14.150 |
MILE |
4,200.00 |
59,430.00 |
4,300.00 |
60,845.00 |
|
|
|
|
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
1.210 |
MILE |
8,000.00 |
9,680.00 |
8,700.00 |
10,527.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
8.200 |
MILE |
1,500.00 |
12,300.00 |
1,600.00 |
13,120.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
4,000.00 |
4,000.00 |
|
|
|
|
| S-001 |
rumble strips (ground-in)
|
8.0 |
MILE |
650.00 |
5,200.00 |
800.00 |
6,400.00 |
|
|
|
|
| S-002 |
variable message sign unit
|
4   |
EACH |
7,000.00 |
28,000.00 |
6,500.00 |
26,000.00 |
|
|
|
|
| S-003 |
adjusting barrier wall
|
540   |
LNFT |
50.00 |
27,000.00 |
55.50 |
29,970.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,221,409.00 |
|
2,234,590.00 |
|
|
|
|
|