Letting of 1/12/2005 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 450-15-0127
Parish: JEFFERSON
Routes: I-10
Description: WILLIAMS OVERPASS - VETERANS OVERPASS
Type Const: grading, cold planing asphaltic concrete, asphaltic concrete (stone matrix asphalt)
, pavement patching, and related work
 
RankLicenseBidderAmount
106276 BARRIERE CONSTRUCTION CO., LLC $2,221,409.00
202179 BOH BROS. CONSTRUCTION CO., LLC. $2,234,590.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC
- 2 -
BOH BROS. CONSTRUCTION CO., LLC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 3,643      LNFT 4.00 14,572.00 4.00 14,572.00        
203-08 borrow (vehicular measurement) 1,400      CUYD 10.00 14,000.00 8.00 11,200.00        
502-01-A superpave asphaltic concrete, paved drives and
turnouts
1,180.3    TON 75.00 88,522.50 90.00 106,227.00        
508-01 asphalt concrete (sma) wearing course 15,852.9    TON 67.00 1,062,144.30 60.00 951,174.00        
509-01 cold planing asphaltic pavement 134,808      SQYD 2.70 363,981.60 1.75 235,914.00        
509-02 contractor retained reclaimed asphaltic pavement - 7,490      CUYD 10.00 - 74,900.00 11.00 - 82,390.00        
602-02-A cleaning and resealing existing longitudinal pavement
joints
1,000      LNFT 4.00 4,000.00 5.00 5,000.00        
602-02-B cleaning and resealing existing transverse pavement
joints
1,000      LNFT 4.00 4,000.00 5.00 5,000.00        
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 650.0    LNFT 32.00 20,800.00 33.00 21,450.00        
704-01-C guard rail (double thrie beam)(3'-1 1/2" post spacing) 131.3    LNFT 48.00 6,302.40 50.00 6,565.00        
704-03 blocked out guard rail 2,031.3    LNFT 20.00 40,626.00 20.00 40,626.00        
704-06 guard rail anchor sections (trailing end) 6.3    LNFT 65.00 409.50 70.00 441.00        
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
50.0    LNFT 75.00 3,750.00 78.00 3,900.00        
704-08-B guard rail transitions (double thrie beam) 225.0    LNFT 44.00 9,900.00 45.00 10,125.00        
704-10 guard rail anchor block 8      EACH 1,500.00 12,000.00 1,400.00 11,200.00        
704-11-A guard rail end treatment (flared) 17      EACH 2,000.00 34,000.00 2,000.00 34,000.00        
713-01 temporary signs & barricades lump      LUMP 150,000.00 150,000.00 350,000.00 350,000.00        
713-03-E temporary pavement markings (24" width) 2,217      LNFT 0.10 221.70 1.50 3,325.50        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
6.000  MILE 10.00 60.00 200.00 1,200.00        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
24.600  MILE 10.00 246.00 270.00 6,642.00        
713-05-A temporary pavement markings (solid line)(4" width) 42.450  MILE 100.00 4,245.00 500.00 21,225.00        
713-05-B temporary pavement markings (solid line)(8" width) 3.650  MILE 100.00 365.00 1,100.00 4,015.00        
724-01-A pavement patching (6" minimum thickness) 300      SQYD 35.00 10,500.00 40.00 12,000.00        
724-01-B pavement patching (12" minimum thickness) 1,100      SQYD 45.00 49,500.00 80.00 88,000.00        
727-01 mobilization lump      LUMP 220,000.00 220,000.00 200,000.00 200,000.00        
729-16-C object marker assembly (type 3) 26      EACH 65.00 1,690.00 70.00 1,820.00        
731-02 reflectorized raised pavement markers 2,528      EACH 6.00 15,168.00 6.50 16,432.00        
732-01-E plastic pavement striping (24" width) 739      LNFT 5.00 3,695.00 5.50 4,064.50        
732-02-A plastic pavement striping (solid line) (4" width) 14.150  MILE 4,200.00 59,430.00 4,300.00 60,845.00        
732-02-C plastic pavement striping (solid line) (8" width) 1.210  MILE 8,000.00 9,680.00 8,700.00 10,527.00        
732-03-A plastic pavement striping (broken line)(4" width) 8.200  MILE 1,500.00 12,300.00 1,600.00 13,120.00        
740-01 construction layout lump      LUMP 20,000.00 20,000.00 4,000.00 4,000.00        
S-001 rumble strips (ground-in) 8.0    MILE 650.00 5,200.00 800.00 6,400.00        
S-002 variable message sign unit 4      EACH 7,000.00 28,000.00 6,500.00 26,000.00        
S-003 adjusting barrier wall 540      LNFT 50.00 27,000.00 55.50 29,970.00        
                       
 CONTRACTOR TOTAL       2,221,409.00   2,234,590.00        