| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BESSETTE DEVELOPMENT CORP. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
MCMANUS CONSTRUCTION, INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
11,120.00 |
11,120.00 |
200,000.00 |
200,000.00 |
10,000.00 |
10,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
15,506.00 |
15,506.00 |
12,000.00 |
12,000.00 |
10,000.00 |
10,000.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
2,524   |
SQYD |
5.50 |
13,882.00 |
4.00 |
10,096.00 |
9.00 |
22,716.00 |
|
|
| 203-03 |
muck excavation
|
600   |
CUYD |
5.00 |
3,000.00 |
8.00 |
4,800.00 |
8.00 |
4,800.00 |
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
103,015.00 |
103,015.00 |
100,000.00 |
100,000.00 |
80,000.00 |
80,000.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
67   |
EACH |
7.25 |
485.75 |
16.00 |
1,072.00 |
12.00 |
804.00 |
|
|
| 204-06 |
temporary silt fencing
|
4,822   |
LNFT |
1.40 |
6,750.80 |
2.00 |
9,644.00 |
1.80 |
8,679.60 |
|
|
| 302-02-D |
class ii base course (12" thick)
|
13,726   |
SQYD |
15.85 |
217,557.10 |
24.00 |
329,424.00 |
15.30 |
210,007.80 |
|
|
| 304-01-A |
lime (granular quicklime or lime slurry only)
|
283.86 |
TON |
131.95 |
37,455.32 |
130.00 |
36,901.80 |
136.00 |
38,604.96 |
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
15,020   |
SQYD |
1.15 |
17,273.00 |
2.00 |
30,040.00 |
2.00 |
30,040.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
155   |
CUYD |
64.00 |
9,920.00 |
60.00 |
9,300.00 |
42.00 |
6,510.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
1,000.0 |
CUYD |
51.00 |
51,000.00 |
60.00 |
60,000.00 |
42.00 |
42,000.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
1,602.2 |
TON |
49.50 |
79,308.90 |
80.00 |
128,176.00 |
80.00 |
128,176.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
1,433   |
SQYD |
14.00 |
20,062.00 |
4.00 |
5,732.00 |
5.00 |
7,165.00 |
|
|
| 601-01-M |
portland cement concrete pavement (11" thick)
|
13,157.2 |
SQYD |
50.40 |
663,122.88 |
48.00 |
631,545.60 |
49.00 |
644,702.80 |
|
|
| 601-04 |
portland cement concrete pavement coring
|
17   |
EACH |
275.00 |
4,675.00 |
110.00 |
1,870.00 |
200.00 |
3,400.00 |
|
|
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
439   |
LNFT |
41.25 |
18,108.75 |
45.00 |
19,755.00 |
32.00 |
14,048.00 |
|
|
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
342   |
LNFT |
41.95 |
14,346.90 |
48.00 |
16,416.00 |
36.00 |
12,312.00 |
|
|
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
558   |
LNFT |
47.65 |
26,588.70 |
57.00 |
31,806.00 |
45.00 |
25,110.00 |
|
|
| 701-03-K |
storm drain pipe (30" rcp/pcp)
|
1,052   |
LNFT |
59.75 |
62,857.00 |
71.00 |
74,692.00 |
54.00 |
56,808.00 |
|
|
| 701-03-M |
storm drain pipe (36" rcp/pcp)
|
347   |
LNFT |
71.25 |
24,723.75 |
87.00 |
30,189.00 |
65.00 |
22,555.00 |
|
|
| 701-03-N |
storm drain pipe (42" rcp/pcp)
|
71   |
LNFT |
86.15 |
6,116.65 |
105.00 |
7,455.00 |
89.00 |
6,319.00 |
|
|
| 701-03-O |
storm drain pipe (48" rcp/pcp)
|
12   |
LNFT |
130.00 |
1,560.00 |
125.00 |
1,500.00 |
180.00 |
2,160.00 |
|
|
| 701-03-P-01 |
storm drain pipe (54")(outfall)
|
16   |
LNFT |
160.00 |
2,560.00 |
155.00 |
2,480.00 |
120.00 |
1,920.00 |
|
|
| 701-04-D |
storm drain pipe arch (24" equiv. rcpa)
|
132   |
LNFT |
55.00 |
7,260.00 |
70.00 |
9,240.00 |
56.00 |
7,392.00 |
|
|
| 701-04-E |
storm drain pipe arch (30" equiv. rcpa)
|
182   |
LNFT |
62.50 |
11,375.00 |
80.00 |
14,560.00 |
65.00 |
11,830.00 |
|
|
| 701-04-F |
storm drain pipe arch (36" equiv. rcpa)
|
67   |
LNFT |
76.95 |
5,155.65 |
93.00 |
6,231.00 |
85.00 |
5,695.00 |
|
|
| 701-04-H |
storm drain pipe arch (48" equiv. rcpa)
|
83   |
LNFT |
143.00 |
11,869.00 |
190.00 |
15,770.00 |
140.00 |
11,620.00 |
|
|
| 701-09 |
fabricating pipe fittings
|
1   |
EACH |
5,000.00 |
5,000.00 |
1,200.00 |
1,200.00 |
2,000.00 |
2,000.00 |
|
|
| 702-02-C |
manholes (r-cb-11 mod)
|
1   |
EACH |
3,525.00 |
3,525.00 |
4,300.00 |
4,300.00 |
4,000.00 |
4,000.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
32   |
EACH |
2,330.00 |
74,560.00 |
3,100.00 |
99,200.00 |
1,900.00 |
60,800.00 |
|
|
| 702-03-B |
catch basins (cb-02)
|
1   |
EACH |
3,800.00 |
3,800.00 |
3,700.00 |
3,700.00 |
3,400.00 |
3,400.00 |
|
|
| 702-03-C |
catch basins (cb-06)
|
30   |
EACH |
2,350.00 |
70,500.00 |
3,200.00 |
96,000.00 |
2,400.00 |
72,000.00 |
|
|
| 702-03-F |
catch basins (cb-08)
|
4   |
EACH |
3,800.00 |
15,200.00 |
4,400.00 |
17,600.00 |
4,000.00 |
16,000.00 |
|
|
| 702-03-I |
catch basins (double cb-01)(special detail)
|
2   |
EACH |
4,950.00 |
9,900.00 |
3,700.00 |
7,400.00 |
4,200.00 |
8,400.00 |
|
|
| 702-04-A |
adjusting manholes
|
1   |
EACH |
925.00 |
925.00 |
850.00 |
850.00 |
1,500.00 |
1,500.00 |
|
|
| 702-04-D |
adjusting existing catch basin to cb-06 (special
detail) |
4   |
EACH |
1,165.00 |
4,660.00 |
2,000.00 |
8,000.00 |
1,200.00 |
4,800.00 |
|
|
| 705-02 |
combination mesh & barbed wire fence
|
857   |
LNFT |
15.50 |
13,283.50 |
17.00 |
14,569.00 |
3.00 |
2,571.00 |
|
|
| 706-02-C |
concrete drive (6" thick)
|
1,459.4 |
SQYD |
34.85 |
50,860.09 |
50.00 |
72,970.00 |
29.00 |
42,322.60 |
|
|
| 707-01 |
concrete curb
|
3,411.2 |
LNFT |
11.85 |
40,422.72 |
6.00 |
20,467.20 |
5.00 |
17,056.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
34,695.00 |
34,695.00 |
24,000.00 |
24,000.00 |
30,000.00 |
30,000.00 |
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
300   |
LNFT |
0.22 |
66.00 |
0.50 |
150.00 |
2.00 |
600.00 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
1.953 |
MILE |
556.00 |
1,085.86 |
560.00 |
1,093.68 |
680.00 |
1,328.04 |
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
2   |
EACH |
55.50 |
111.00 |
60.00 |
120.00 |
60.00 |
120.00 |
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
2   |
EACH |
83.50 |
167.00 |
100.00 |
200.00 |
60.00 |
120.00 |
|
|
| 717-01 |
seeding
|
100   |
LB |
9.45 |
945.00 |
10.00 |
1,000.00 |
8.00 |
800.00 |
|
|
| 718-01 |
fertilizer
|
1,600   |
LB |
0.35 |
560.00 |
0.40 |
640.00 |
0.30 |
480.00 |
|
|
| 720-01-A |
erosion control sysyem, slope protection (type a)
|
458   |
SQYD |
1.40 |
641.20 |
1.50 |
687.00 |
1.40 |
641.20 |
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
5,650.00 |
5,650.00 |
7,500.00 |
7,500.00 |
5,000.00 |
5,000.00 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
103   |
SQYD |
62.20 |
6,406.60 |
170.00 |
17,510.00 |
50.00 |
5,150.00 |
|
|
| 726-01 |
bedding material
|
305.3 |
CUYD |
43.85 |
13,387.40 |
70.00 |
21,371.00 |
32.00 |
9,769.60 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
57,250.00 |
57,250.00 |
220,000.00 |
220,000.00 |
225,000.00 |
225,000.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
526   |
EACH |
5.55 |
2,919.30 |
6.00 |
3,156.00 |
5.25 |
2,761.50 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
720   |
LNFT |
0.90 |
648.00 |
1.00 |
720.00 |
0.90 |
648.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
315   |
LNFT |
2.65 |
834.75 |
3.00 |
945.00 |
2.70 |
850.50 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
3.150 |
MILE |
2,224.00 |
7,005.60 |
2,400.00 |
7,560.00 |
2,200.00 |
6,930.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.813 |
MILE |
778.50 |
632.92 |
800.00 |
650.40 |
950.00 |
772.35 |
|
|
| 732-03-A-01 |
plastic pavement striping (broken line)(4"width)(type
v preformed) |
0.646 |
MILE |
4,440.00 |
2,868.24 |
4,500.00 |
2,907.00 |
4,300.00 |
2,777.80 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
24   |
EACH |
155.00 |
3,720.00 |
160.00 |
3,840.00 |
160.00 |
3,840.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
4   |
EACH |
155.00 |
620.00 |
160.00 |
640.00 |
160.00 |
640.00 |
|
|
| 735-01 |
mailboxes
|
20   |
EACH |
10.00 |
200.00 |
25.00 |
500.00 |
80.00 |
1,600.00 |
|
|
| 735-02 |
mailbox supports (single)
|
15   |
EACH |
135.00 |
2,025.00 |
150.00 |
2,250.00 |
100.00 |
1,500.00 |
|
|
| 735-03 |
mailbox supports (double)
|
1   |
EACH |
165.00 |
165.00 |
175.00 |
175.00 |
300.00 |
300.00 |
|
|
| 735-04 |
mailbox supports (multiple)
|
1   |
EACH |
275.00 |
275.00 |
250.00 |
250.00 |
600.00 |
600.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
12,500.00 |
12,500.00 |
32,000.00 |
32,000.00 |
10,000.00 |
10,000.00 |
|
|
| 741-09 |
adjusting water house connections
|
14   |
EACH |
83.95 |
1,175.30 |
300.00 |
4,200.00 |
200.00 |
2,800.00 |
|
|
| 741-10 |
adjusting water service lines
|
756   |
LNFT |
6.15 |
4,649.40 |
6.00 |
4,536.00 |
10.00 |
7,560.00 |
|
|
| 742-02 |
adjusting sanitary sewer house connections
|
14   |
EACH |
165.00 |
2,310.00 |
500.00 |
7,000.00 |
300.00 |
4,200.00 |
|
|
| 742-03 |
adjusting sanitary sewer service lines
|
439   |
LNFT |
7.25 |
3,182.75 |
16.00 |
7,024.00 |
20.00 |
8,780.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,905,987.78 |
|
2,519,576.68 |
|
IRREGULAR |
|
|
|