Bid Tabulations
Letting of
02/23/2011
LA DOTD Headquarters
| Lead Project: 050-07-0077 | |
| Parish: West Baton Rouge | |
| Routes: LA 1 | |
| Description: LA-1 DRAINAGE IMPROVEMENTS | |
| Type Const: GRADING, DRAINAGE STRUCTURES, AND RELATED WORK | |
| Estimated Construction Cost: $659,516.36 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 16724 | Stranco, Inc. | $655,313.50 |
| 2 | 25088 | RCS Contractors, Inc. | $673,368.00 |
| 3 | 29696 | Advanced Quality Construction Inc. | $685,841.00 |
| 4 | 14807 | Richard Price Contracting Co, Llc | $702,567.75 |
| 5 | 34263 | La Contracting Enterprises Llc | $704,623.00 |
| 6 | 05693 | Industrial Enterprises, Inc. | $722,662.25 |
| 7 | 33678 | Sealevel Construction Inc | $779,975.00 |
| 8 | 39462 | Jb James Construction Llc | $968,341.00 |
| 9 | 12198 | Byron E. Talbot Contractor, Inc. | $999,998.30 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Stranco, Inc. |
- 2 - RCS Contractors, Inc. |
- 3 - Advanced Quality Construction Inc. |
- 4 - Richard Price Contracting Co, Llc |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-32120 | Removal of Pipe (Side Drain) Remove existing 30" CMP | 48 | LNFT | 10.00 | 480.00 | 20.00 | 960.00 | 15.00 | 720.00 | 36.00 | 1,728.00 |
| 0002 | 202-02-32180 | Removal of Pipe Headwalls Remove existing safety end | 1 | EACH | 600.00 | 600.00 | 1,000.00 | 1,000.00 | 1,000.00 | 1,000.00 | 2,500.00 | 2,500.00 |
| 0003 | 203-07-00300 | Borrow (Vehicular Measurement) (Plastic Soils) | 390 | CUYD | 19.00 | 7,410.00 | 30.00 | 11,700.00 | 50.00 | 19,500.00 | 25.00 | 9,750.00 |
| 0004 | 203-08-00100 | Geotextile Fabric | 150 | SQYD | 2.00 | 300.00 | 1.00 | 150.00 | 3.00 | 450.00 | 5.00 | 750.00 |
| 0005 | 204-06-00100 | Temporary Silt Fencing | 600 | LNFT | 2.00 | 1,200.00 | 4.00 | 2,400.00 | 3.50 | 2,100.00 | 2.75 | 1,650.00 |
| 0006 | 702-07-00100 | Cross Drain Safety End (Type 1) for 36" Steel Casing Pipes | 6 | EACH | 4,400.00 | 26,400.00 | 4,800.00 | 28,800.00 | 4,200.00 | 25,200.00 | 3,925.00 | 23,550.00 |
| 0007 | 702-07-00200 | Cross Drain Safety End (Type 2) for 36" Steel Casing & 48" Steel Casing Pipes | 1 | EACH | 11,000.00 | 11,000.00 | 6,700.00 | 6,700.00 | 10,000.00 | 10,000.00 | 8,650.00 | 8,650.00 |
| 0008 | 713-01-00100 | Temporary Signs and Barricades Lump Sum | 1 | LUMP | 12,000.00 | 12,000.00 | 30,000.00 | 30,000.00 | 14,400.00 | 14,400.00 | 17,000.00 | 17,000.00 |
| 0009 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) Contractor Furnished | 10 | EACH | 550.00 | 5,500.00 | 2,200.00 | 22,000.00 | 1,000.00 | 10,000.00 | 975.00 | 9,750.00 |
| 0010 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 30 | EACH | 200.00 | 6,000.00 | 400.00 | 12,000.00 | 360.00 | 10,800.00 | 370.00 | 11,100.00 |
| 0011 | 726-01-00100 | Bedding Material | 45 | CUYD | 45.00 | 2,025.00 | 100.00 | 4,500.00 | 70.00 | 3,150.00 | 70.00 | 3,150.00 |
| 0012 | 727-01-00100 | Mobilization | 1 | LUMP | 12,000.00 | 12,000.00 | 50,000.00 | 50,000.00 | 27,300.00 | 27,300.00 | 25,000.00 | 25,000.00 |
| 0013 | 728-01-01200 | Jacked or Bored Pipe (36") 36" Steel Casing (0.812" Thick) | 820 | LNFT | 625.00 | 512,500.00 | 425.00 | 348,500.00 | 595.00 | 487,900.00 | 590.50 | 484,210.00 |
| 0014 | 739-01-00100 | Hydro-Seeding | 0.2 | ACRE | 4,000.00 | 800.00 | 5,000.00 | 1,000.00 | 1,800.00 | 360.00 | 10,250.00 | 2,050.00 |
| 0015 | 740-01-00100 | Construction Layout | 1 | LUMP | 2,000.00 | 2,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 6,500.00 | 6,500.00 |
| 0016 | 803-05-00100 | Temporary Sheeting | 1 | LUMP | 6,000.00 | 6,000.00 | 72,000.00 | 72,000.00 | 8,000.00 | 8,000.00 | 35,000.00 | 35,000.00 |
| 0017 | 805-01-00200 | Class A Concrete (Pipe Headwalls) | 19.42 | CUYD | 600.00 | 11,652.00 | 1,850.00 | 35,927.00 | 1,200.00 | 23,304.00 | 1,050.00 | 20,391.00 |
| 0018 | 806-01-00100 | Deformed Reinforcing Steel | 1,231 | LB | 1.50 | 1,846.50 | 1.00 | 1,231.00 | 7.00 | 8,617.00 | 1.25 | 1,538.75 |
| 0019 | NS-200-00020 | Cleaning Existing Ditches | 150 | LNFT | 8.00 | 1,200.00 | 10.00 | 1,500.00 | 9.60 | 1,440.00 | 22.00 | 3,300.00 |
| 0020 | NS-700-00180 | Impact Attenuator (Construction Zone) | 2 | EACH | 15,000.00 | 30,000.00 | 15,000.00 | 30,000.00 | 10,000.00 | 20,000.00 | 13,750.00 | 27,500.00 |
| 0021 | NS-713-00001 | Dynamic Message Sign Unit | 2 | EACH | 2,200.00 | 4,400.00 | 4,000.00 | 8,000.00 | 3,300.00 | 6,600.00 | 3,750.00 | 7,500.00 |
| CONTRACTOR TOTAL | 655,313.50 | 673,368.00 | 685,841.00 | 702,567.75 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - La Contracting Enterprises Llc |
- 6 - Industrial Enterprises, Inc. |
- 7 - Sealevel Construction Inc |
- 8 - Jb James Construction Llc |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-32120 | Removal of Pipe (Side Drain) Remove existing 30" CMP | 48 | LNFT | 33.00 | 1,584.00 | 11.50 | 552.00 | 25.00 | 1,200.00 | 10.00 | 480.00 |
| 0002 | 202-02-32180 | Removal of Pipe Headwalls Remove existing safety end | 1 | EACH | 1,600.00 | 1,600.00 | 575.00 | 575.00 | 600.00 | 600.00 | 600.00 | 600.00 |
| 0003 | 203-07-00300 | Borrow (Vehicular Measurement) (Plastic Soils) | 390 | CUYD | 23.00 | 8,970.00 | 28.75 | 11,212.50 | 20.00 | 7,800.00 | 24.00 | 9,360.00 |
| 0004 | 203-08-00100 | Geotextile Fabric | 150 | SQYD | 4.00 | 600.00 | 2.88 | 432.00 | 1.00 | 150.00 | 2.00 | 300.00 |
| 0005 | 204-06-00100 | Temporary Silt Fencing | 600 | LNFT | 5.00 | 3,000.00 | 2.30 | 1,380.00 | 3.00 | 1,800.00 | 2.50 | 1,500.00 |
| 0006 | 702-07-00100 | Cross Drain Safety End (Type 1) for 36" Steel Casing Pipes | 6 | EACH | 3,500.00 | 21,000.00 | 4,881.18 | 29,287.08 | 4,000.00 | 24,000.00 | 2,800.00 | 16,800.00 |
| 0007 | 702-07-00200 | Cross Drain Safety End (Type 2) for 36" Steel Casing & 48" Steel Casing Pipes | 1 | EACH | 10,000.00 | 10,000.00 | 10,102.29 | 10,102.29 | 12,000.00 | 12,000.00 | 3,000.00 | 3,000.00 |
| 0008 | 713-01-00100 | Temporary Signs and Barricades Lump Sum | 1 | LUMP | 13,000.00 | 13,000.00 | 17,250.00 | 17,250.00 | 7,000.00 | 7,000.00 | 50,000.00 | 50,000.00 |
| 0009 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) Contractor Furnished | 10 | EACH | 1,400.00 | 14,000.00 | 1,167.25 | 11,672.50 | 1,000.00 | 10,000.00 | 1,300.00 | 13,000.00 |
| 0010 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 30 | EACH | 1,200.00 | 36,000.00 | 575.00 | 17,250.00 | 300.00 | 9,000.00 | 275.00 | 8,250.00 |
| 0011 | 726-01-00100 | Bedding Material | 45 | CUYD | 140.00 | 6,300.00 | 97.75 | 4,398.75 | 80.00 | 3,600.00 | 70.00 | 3,150.00 |
| 0012 | 727-01-00100 | Mobilization | 1 | LUMP | 25,000.00 | 25,000.00 | 5,750.00 | 5,750.00 | 24,000.00 | 24,000.00 | 80,000.00 | 80,000.00 |
| 0013 | 728-01-01200 | Jacked or Bored Pipe (36") 36" Steel Casing (0.812" Thick) | 820 | LNFT | 550.00 | 451,000.00 | 663.00 | 543,660.00 | 760.00 | 623,200.00 | 850.00 | 697,000.00 |
| 0014 | 739-01-00100 | Hydro-Seeding | 0.2 | ACRE | 6,000.00 | 1,200.00 | 3,450.00 | 690.00 | 6,000.00 | 1,200.00 | 5,000.00 | 1,000.00 |
| 0015 | 740-01-00100 | Construction Layout | 1 | LUMP | 6,000.00 | 6,000.00 | 1,725.00 | 1,725.00 | 600.00 | 600.00 | 15,000.00 | 15,000.00 |
| 0016 | 803-05-00100 | Temporary Sheeting | 1 | LUMP | 17,000.00 | 17,000.00 | 1,150.00 | 1,150.00 | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 |
| 0017 | 805-01-00200 | Class A Concrete (Pipe Headwalls) | 19.42 | CUYD | 1,700.00 | 33,014.00 | 1,150.00 | 22,333.00 | 700.00 | 13,594.00 | 1,000.00 | 19,420.00 |
| 0018 | 806-01-00100 | Deformed Reinforcing Steel | 1,231 | LB | 5.00 | 6,155.00 | 1.73 | 2,129.63 | 1.00 | 1,231.00 | 1.00 | 1,231.00 |
| 0019 | NS-200-00020 | Cleaning Existing Ditches | 150 | LNFT | 12.00 | 1,800.00 | 5.75 | 862.50 | 4.00 | 600.00 | 15.00 | 2,250.00 |
| 0020 | NS-700-00180 | Impact Attenuator (Construction Zone) | 2 | EACH | 20,000.00 | 40,000.00 | 14,375.00 | 28,750.00 | 11,000.00 | 22,000.00 | 11,000.00 | 22,000.00 |
| 0021 | NS-713-00001 | Dynamic Message Sign Unit | 2 | EACH | 3,700.00 | 7,400.00 | 5,750.00 | 11,500.00 | 3,200.00 | 6,400.00 | 7,000.00 | 14,000.00 |
| CONTRACTOR TOTAL | 704,623.00 | 722,662.25 | 779,975.00 | 968,341.00 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 9 - Byron E. Talbot Contractor, Inc. |
|
| Unit Price | Total Amount |
|||||
| 0001 | 202-02-32120 | Removal of Pipe (Side Drain) Remove existing 30" CMP | 48 | LNFT | 11.00 | 528.00 |
| 0002 | 202-02-32180 | Removal of Pipe Headwalls Remove existing safety end | 1 | EACH | 350.00 | 350.00 |
| 0003 | 203-07-00300 | Borrow (Vehicular Measurement) (Plastic Soils) | 390 | CUYD | 18.95 | 7,390.50 |
| 0004 | 203-08-00100 | Geotextile Fabric | 150 | SQYD | 9.85 | 1,477.50 |
| 0005 | 204-06-00100 | Temporary Silt Fencing | 600 | LNFT | 2.70 | 1,620.00 |
| 0006 | 702-07-00100 | Cross Drain Safety End (Type 1) for 36" Steel Casing Pipes | 6 | EACH | 4,500.00 | 27,000.00 |
| 0007 | 702-07-00200 | Cross Drain Safety End (Type 2) for 36" Steel Casing & 48" Steel Casing Pipes | 1 | EACH | 10,500.00 | 10,500.00 |
| 0008 | 713-01-00100 | Temporary Signs and Barricades Lump Sum | 1 | LUMP | 40,000.00 | 40,000.00 |
| 0009 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) Contractor Furnished | 10 | EACH | 1,050.00 | 10,500.00 |
| 0010 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 30 | EACH | 160.00 | 4,800.00 |
| 0011 | 726-01-00100 | Bedding Material | 45 | CUYD | 97.50 | 4,387.50 |
| 0012 | 727-01-00100 | Mobilization | 1 | LUMP | 33,500.00 | 33,500.00 |
| 0013 | 728-01-01200 | Jacked or Bored Pipe (36") 36" Steel Casing (0.812" Thick) | 820 | LNFT | 935.00 | 766,700.00 |
| 0014 | 739-01-00100 | Hydro-Seeding | 0.2 | ACRE | 2,500.00 | 500.00 |
| 0015 | 740-01-00100 | Construction Layout | 1 | LUMP | 4,000.00 | 4,000.00 |
| 0016 | 803-05-00100 | Temporary Sheeting | 1 | LUMP | 25,000.00 | 25,000.00 |
| 0017 | 805-01-00200 | Class A Concrete (Pipe Headwalls) | 19.42 | CUYD | 1,200.00 | 23,304.00 |
| 0018 | 806-01-00100 | Deformed Reinforcing Steel | 1,231 | LB | 1.80 | 2,215.80 |
| 0019 | NS-200-00020 | Cleaning Existing Ditches | 150 | LNFT | 6.50 | 975.00 |
| 0020 | NS-700-00180 | Impact Attenuator (Construction Zone) | 2 | EACH | 12,750.00 | 25,500.00 |
| 0021 | NS-713-00001 | Dynamic Message Sign Unit | 2 | EACH | 4,875.00 | 9,750.00 |
| CONTRACTOR TOTAL | 999,998.30 | |||||