LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: 050-07-0075
Parish: West Baton Rouge
Routes: LA 1
Description: LA Highway 1 Northbound Acceleration Lane at Emily Drive
Type Const: CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, PORTLAND CEMENT CONCRETE PAVEMENT, AND RELATED WORK
Estimated Construction Cost: $302,036.90


RankLicenseBidderConstruction Bid
1 12198 Byron E. Talbot Contractor, Inc. $388,313.21
2 25088 RCS Contractors, Inc. $388,826.66
3 14647 Cecil Perry Improvements Ltd. $452,450.00
4 39462 JB James Construction LLC $574,460.60
5 05693 Industrial Enterprises, Inc. $598,162.63


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Byron E. Talbot Contractor, Inc.
- 2 -
RCS Contractors, Inc.
- 3 -
Cecil Perry Improvements Ltd.
- 4 -
JB James Construction LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 1.00 1.00 1.00 1.00 23,279.47 23,279.47 45,000.00 45,000.00
0002 202-02-06060 Removal of Concrete Catch Basin 2      EACH 245.00 490.00 500.00 1,000.00 752.00 1,504.00 2,500.00 5,000.00
0003 202-02-32100 Removal of Pipe (Cross Drain) (24" RCP) 8      LNFT 5.00 40.00 20.00 160.00 60.61 484.88 100.00 800.00
0004 202-02-32100 Removal of Pipe (Cross Drain) (30" RCP) 8      LNFT 5.00 40.00 20.00 160.00 60.61 484.88 150.00 1,200.00
0005 202-02-38500 Removal of Surfacing and Stablized Base 573.4    SQYD 6.25 3,583.75 10.00 5,734.00 6.59 3,778.71 15.00 8,601.00
0006 203-01-00100 General Excavation 673      CUYD 6.95 4,677.35 7.00 4,711.00 11.03 7,423.19 20.00 13,460.00
0007 203-03-00100 Embankment 365      CUYD 16.65 6,077.25 25.00 9,125.00 29.82 10,884.30 35.00 12,775.00
0008 204-02-00100 Temporary Hay or Straw Bales 16      EACH 15.50 248.00 17.00 272.00 25.03 400.48 20.00 320.00
0009 204-05-00100 Temporary Sediment Check Dams (Hay) 5      EACH 130.00 650.00 150.00 750.00 127.02 635.10 150.00 750.00
0010 204-06-00100 Temporary Silt Fencing 1,310      LNFT 2.00 2,620.00 1.80 2,358.00 1.51 1,978.10 2.00 2,620.00
0013 601-01-00700 Portland Cement Concrete Pavement (11" Thick) 2,142.7    SQYD 78.30 167,773.41 90.00 192,843.00 78.00 167,130.60 95.00 203,556.50
0014 601-04-00100 Portland Cement Concrete Pavement Coring 6      EACH 120.00 720.00 100.00 600.00 238.69 1,432.14 200.00 1,200.00
0015 701-01-01001 Cross Drain Pipe (24" RCP) 8      LNFT 86.00 688.00 100.00 800.00 146.00 1,168.00 140.00 1,120.00
0016 701-01-01020 Cross Drain Pipe (30" RCP/PP) (RCP ONLY) 8      LNFT 100.00 800.00 100.00 800.00 160.00 1,280.00 170.00 1,360.00
0017 701-15-00100 Concrete Collar 2      EACH 300.00 600.00 750.00 1,500.00 688.00 1,376.00 2,000.00 4,000.00
0018 702-03-00100 Catch Basins (CB-01) 2      EACH 2,000.00 4,000.00 2,750.00 5,500.00 2,400.00 4,800.00 3,000.00 6,000.00
0019 713-01-00100 Temporary Signs and Barricades 1      LUMP 24,000.00 24,000.00 7,500.00 7,500.00 20,000.00 20,000.00 20,000.00 20,000.00
0020 726-01-00100 Bedding Material 2.5    CUYD 82.00 205.00 250.00 625.00 69.00 172.50 100.00 250.00
0021 727-01-00100 Mobilization 1      LUMP 38,000.00 38,000.00 15,000.00 15,000.00 5,484.02 5,484.02 56,000.00 56,000.00
0022 729-01-00100 Sign (Type A) 9      SQFT 36.75 330.75 14.00 126.00 23.43 210.87 15.00 135.00
0023 729-21-00100 U-Channel Post 1      EACH 131.00 131.00 95.00 95.00 122.36 122.36 100.00 100.00
0024 731-02-00100 Reflectorized Raised Pavement Markers 81      EACH 5.50 445.50 5.60 453.60 13.02 1,054.62 5.50 445.50
0025 732-01-01000 Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) 1,303      LNFT 0.55 716.65 0.60 781.80 1.69 2,202.07 0.60 781.80
0026 732-01-01040 Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) 483      LNFT 1.45 700.35 1.10 531.30 3.19 1,540.77 1.20 579.60
0027 732-04-01120 Plastic Pavement Legends and Symbols (Arrow - Merge) 1      EACH 262.50 262.50 230.00 230.00 663.95 663.95 210.00 210.00
0028 732-05-00100 Removal of Existing Markings 0.25   MILE 5,250.00 1,312.50 5,700.00 1,425.00 3,780.60 945.15 5,100.00 1,275.00
0029 739-01-00100 Hydro-Seeding 0.62   ACRE 2,000.00 1,240.00 2,000.00 1,240.00 7,676.00 4,759.12 1,800.00 1,116.00
0030 740-01-00100 Construction Layout 1      LUMP 6,000.00 6,000.00 2,500.00 2,500.00 3,370.00 3,370.00 20,000.00 20,000.00
0031 NS-500-00340 Saw Cutting Asphaltic Concrete Pavement 7,752      INLF 1.10 8,527.20 1.10 8,527.20 4.36 33,798.72 0.10 775.20
0032 NS-600-00220 Saw Cutting Portland Cement Concrete Pavement 300      INLF 1.75 525.00 1.10 330.00 9.36 2,808.00 4.00 1,200.00
0033 NS-713-00001 Dynamic Message Sign Unit 2      EACH 3,750.00 7,500.00 2,000.00 4,000.00 3,403.00 6,806.00 6,000.00 12,000.00
0034 302-02-05080 Class II Base Course (10" Thick) (Asphaltic Concrete Base on Embankment Layer) 2,286      SQYD 42.00 96,012.00 47.16 107,807.76 55.00 125,730.00 65.00 148,590.00
0035 304-05-00100 Lime Treatment (Type E) (Slurry) 32.4    TON 290.00 9,396.00 350.00 11,340.00 455.00 14,742.00 100.00 3,240.00
                         
    CONTRACTOR TOTAL       388,313.21   388,826.66   452,450.00   574,460.60



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 5 -
Industrial Enterprises, Inc.
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 2,575.00 2,575.00
0002 202-02-06060 Removal of Concrete Catch Basin 2      EACH 345.00 690.00
0003 202-02-32100 Removal of Pipe (Cross Drain) (24" RCP) 8      LNFT 17.25 138.00
0004 202-02-32100 Removal of Pipe (Cross Drain) (30" RCP) 8      LNFT 17.25 138.00
0005 202-02-38500 Removal of Surfacing and Stablized Base 573.4    SQYD 11.50 6,594.10
0006 203-01-00100 General Excavation 673      CUYD 20.13 13,547.49
0007 203-03-00100 Embankment 365      CUYD 24.96 9,110.40
0008 204-02-00100 Temporary Hay or Straw Bales 16      EACH 17.25 276.00
0009 204-05-00100 Temporary Sediment Check Dams (Hay) 5      EACH 143.75 718.75
0010 204-06-00100 Temporary Silt Fencing 1,310      LNFT 1.84 2,410.40
0013 601-01-00700 Portland Cement Concrete Pavement (11" Thick) 2,142.7    SQYD 116.09 248,746.04
0014 601-04-00100 Portland Cement Concrete Pavement Coring 6      EACH 115.00 690.00
0015 701-01-01001 Cross Drain Pipe (24" RCP) 8      LNFT 98.65 789.20
0016 701-01-01020 Cross Drain Pipe (30" RCP/PP) (RCP ONLY) 8      LNFT 104.98 839.84
0017 701-15-00100 Concrete Collar 2      EACH 345.00 690.00
0018 702-03-00100 Catch Basins (CB-01) 2      EACH 3,782.35 7,564.70
0019 713-01-00100 Temporary Signs and Barricades 1      LUMP 48,332.05 48,332.05
0020 726-01-00100 Bedding Material 2.5    CUYD 86.25 215.63
0021 727-01-00100 Mobilization 1      LUMP 12,075.00 12,075.00
0022 729-01-00100 Sign (Type A) 9      SQFT 40.25 362.25
0023 729-21-00100 U-Channel Post 1      EACH 143.75 143.75
0024 731-02-00100 Reflectorized Raised Pavement Markers 81      EACH 5.87 475.47
0025 732-01-01000 Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) 1,303      LNFT 0.60 781.80
0026 732-01-01040 Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) 483      LNFT 1.15 555.45
0027 732-04-01120 Plastic Pavement Legends and Symbols (Arrow - Merge) 1      EACH 241.50 241.50
0028 732-05-00100 Removal of Existing Markings 0.25   MILE 5,865.00 1,466.25
0029 739-01-00100 Hydro-Seeding 0.62   ACRE 2,070.00 1,283.40
0030 740-01-00100 Construction Layout 1      LUMP 22,300.00 22,300.00
0031 NS-500-00340 Saw Cutting Asphaltic Concrete Pavement 7,752      INLF 0.86 6,666.72
0032 NS-600-00220 Saw Cutting Portland Cement Concrete Pavement 300      INLF 1.15 345.00
0033 NS-713-00001 Dynamic Message Sign Unit 2      EACH 6,900.00 13,800.00
0034 302-02-05080 Class II Base Course (10" Thick) (Asphaltic Concrete Base on Embankment Layer) 2,286      SQYD 76.54 174,970.44
0035 304-05-00100 Lime Treatment (Type E) (Slurry) 32.4    TON 575.00 18,630.00
             
    CONTRACTOR TOTAL       598,162.63