Bid Tabulations
Letting of
03/17/2010
LA DOTD Headquarters
| Lead Project: 046-03-0076 | |
| Parish: St. Bernard | |
| Routes: LA 46 | |
| Description: ST. BERNARD HWY. DRAINAGE/SAFETY IMPROVEMENTS - PHASE III | |
| Type Const: GRADING, DRAINAGE STRUCTURES, PAVEMENT PATCHING, SHOULDER WIDENING (ADDITIVE ALTERNATES) AND RELATED WORK. | |
| Estimated Construction Cost: $4,061,416.87 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 50078 | Fenton Excavating & Const. Inc. | $3,783,907.00 |
| 2 | 52550 | Gibbs & Register Inc | $4,068,773.40 |
| 3 | 06276 | Barriere Construction Co., Llc | $4,168,808.85 |
| 4 | 02179 | Boh Bros. Construction Co., LLC. | $4,562,366.50 |
| 5 | 01033 | Wallace C. Drennan, Inc. | $4,697,818.00 |
| 6 | 25088 | RCS Contractors, Inc. | $4,818,401.31 |
| 7 | 00935 | Fleming Construction Co., Inc. | $5,156,280.90 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Fenton Excavating & Const. Inc. |
- 2 - Gibbs & Register Inc |
- 3 - Barriere Construction Co., Llc |
- 4 - Boh Bros. Construction Co., LLC. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 3,000.00 | 3,000.00 | 60,000.00 | 60,000.00 | 5,000.00 | 5,000.00 |
| 0002 | 202-02-00010 | Removal of Concrete Headwalls | 2 | EACH | 850.00 | 1,700.00 | 2,000.00 | 4,000.00 | 3,600.00 | 7,200.00 | 6,500.00 | 13,000.00 |
| 0003 | 202-02-02000 | Removal of Asphalt Drives | 60.7 | SQYD | 5.31 | 322.32 | 12.00 | 728.40 | 18.00 | 1,092.60 | 18.00 | 1,092.60 |
| 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 89.3 | LNFT | 8.00 | 714.40 | 10.00 | 893.00 | 5.00 | 446.50 | 13.00 | 1,160.90 |
| 0005 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 102,000.00 | 102,000.00 | 100,000.00 | 100,000.00 | 190,000.00 | 190,000.00 | 11,000.00 | 11,000.00 |
| 0006 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 1,389 | CUYD | 16.75 | 23,265.75 | 35.00 | 48,615.00 | 23.00 | 31,947.00 | 10.00 | 13,890.00 |
| 0007 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 146 | CUYD | 65.00 | 9,490.00 | 95.00 | 13,870.00 | 82.00 | 11,972.00 | 65.00 | 9,490.00 |
| 0008 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 20 | TON | 236.00 | 4,720.00 | 200.00 | 4,000.00 | 210.00 | 4,200.00 | 225.00 | 4,500.00 |
| 0009 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 200 | SQYD | 72.00 | 14,400.00 | 75.00 | 15,000.00 | 105.00 | 21,000.00 | 70.00 | 14,000.00 |
| 0010 | 701-10-01000 | Reinforced Concrete Pipe (Extension) (12") | 36 | LNFT | 190.00 | 6,840.00 | 225.00 | 8,100.00 | 170.00 | 6,120.00 | 126.00 | 4,536.00 |
| 0011 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 36 | LNFT | 208.00 | 7,488.00 | 125.00 | 4,500.00 | 150.00 | 5,400.00 | 163.00 | 5,868.00 |
| 0012 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 52 | LNFT | 240.00 | 12,480.00 | 200.00 | 10,400.00 | 180.00 | 9,360.00 | 200.00 | 10,400.00 |
| 0013 | 701-15-00100 | Concrete Collar | 7 | EACH | 1,050.00 | 7,350.00 | 1,000.00 | 7,000.00 | 2,800.00 | 19,600.00 | 1,700.00 | 11,900.00 |
| 0014 | 702-03-00100 | Catch Basins (CB-01) | 16 | EACH | 2,400.00 | 38,400.00 | 2,000.00 | 32,000.00 | 2,200.00 | 35,200.00 | 3,100.00 | 49,600.00 |
| 0015 | 702-03-00200 | Catch Basins (CB-02) | 1 | EACH | 3,400.00 | 3,400.00 | 3,000.00 | 3,000.00 | 4,000.00 | 4,000.00 | 5,100.00 | 5,100.00 |
| 0016 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 350.00 | 350.00 | 500.00 | 500.00 | 900.00 | 900.00 | 1,000.00 | 1,000.00 |
| 0017 | 707-03-00100 | Combination Concrete Curb and Gutter | 89.3 | LNFT | 41.00 | 3,661.30 | 25.00 | 2,232.50 | 69.00 | 6,161.70 | 75.00 | 6,697.50 |
| 0018 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 11,800.00 | 11,800.00 | 32,600.00 | 32,600.00 | 45,000.00 | 45,000.00 | 46,000.00 | 46,000.00 |
| 0019 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 25 | EACH | 145.00 | 3,625.00 | 150.00 | 3,750.00 | 275.00 | 6,875.00 | 560.00 | 14,000.00 |
| 0020 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 10 | EACH | 55.00 | 550.00 | 1,000.00 | 10,000.00 | 180.00 | 1,800.00 | 1,500.00 | 15,000.00 |
| 0021 | 717-01-00100 | Seeding | 34 | LB | 2.10 | 71.40 | 20.00 | 680.00 | 18.00 | 612.00 | 5.00 | 170.00 |
| 0022 | 718-01-00100 | Fertilizer | 1,087 | LB | 0.75 | 815.25 | 2.00 | 2,174.00 | 0.75 | 815.25 | 0.50 | 543.50 |
| 0023 | 726-01-00100 | Bedding Material | 1,049 | CUYD | 53.00 | 55,597.00 | 110.00 | 115,390.00 | 85.00 | 89,165.00 | 55.00 | 57,695.00 |
| 0024 | 727-01-00100 | Mobilization | 1 | LUMP | 251,000.00 | 251,000.00 | 180,000.00 | 180,000.00 | 200,000.00 | 200,000.00 | 100,000.00 | 100,000.00 |
| 0025 | 740-01-00100 | Construction Layout | 1 | LUMP | 11,800.00 | 11,800.00 | 15,000.00 | 15,000.00 | 115,000.00 | 115,000.00 | 8,000.00 | 8,000.00 |
| 0026 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 960 | INLF | 0.89 | 849.60 | 2.00 | 1,920.00 | 0.75 | 720.00 | 1.00 | 960.00 |
| 0027 | NS-MSC-00120 | Drainage Structure (Miscellaneous)(10'x4' RCB)(1966.22 LNFT) | 1 | EACH | 1,265,000.00 | 1,265,000.00 | 1,250,000.00 | 1,250,000.00 | 1,180,000.00 | 1,180,000.00 | 1,645,000.00 | 1,645,000.00 |
| SUBTOTAL GENERAL | 1,847,690 | 1,869,353 | 2,054,587 | 2,055,604 | ||||||||
| Alternate DA1 | ||||||||||||
| 0028 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 6,300.00 | 6,300.00 | 5,000.00 | 5,000.00 | 2,000.00 | 2,000.00 | 5,000.00 | 5,000.00 |
| 0029 | 202-02-00010 | Removal of Bienvenu Plantation Monument | 1 | EACH | 6,372.00 | 6,372.00 | 2,500.00 | 2,500.00 | 3,700.00 | 3,700.00 | 3,500.00 | 3,500.00 |
| 0030 | 202-02-02000 | Removal of Asphalt Drives | 70 | SQYD | 5.25 | 367.50 | 12.00 | 840.00 | 22.00 | 1,540.00 | 16.00 | 1,120.00 |
| 0031 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 39,000.00 | 39,000.00 | 75,000.00 | 75,000.00 | 105,000.00 | 105,000.00 | 8,000.00 | 8,000.00 |
| 0032 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 1,169 | CUYD | 17.00 | 19,873.00 | 35.00 | 40,915.00 | 23.00 | 26,887.00 | 10.00 | 11,690.00 |
| 0033 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 138 | CUYD | 65.00 | 8,970.00 | 95.00 | 13,110.00 | 82.00 | 11,316.00 | 65.00 | 8,970.00 |
| 0034 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 15 | TON | 250.00 | 3,750.00 | 200.00 | 3,000.00 | 205.00 | 3,075.00 | 225.00 | 3,375.00 |
| 0035 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 200 | SQYD | 68.00 | 13,600.00 | 75.00 | 15,000.00 | 105.00 | 21,000.00 | 70.00 | 14,000.00 |
| 0036 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 184 | LNFT | 110.00 | 20,240.00 | 160.00 | 29,440.00 | 190.00 | 34,960.00 | 178.00 | 32,752.00 |
| 0037 | 701-10-01000 | Reinforced Concrete Pipe (Extension) (12") | 32 | LNFT | 190.00 | 6,080.00 | 225.00 | 7,200.00 | 155.00 | 4,960.00 | 138.00 | 4,416.00 |
| 0038 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 8 | LNFT | 208.00 | 1,664.00 | 190.00 | 1,520.00 | 140.00 | 1,120.00 | 180.00 | 1,440.00 |
| 0039 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 59 | LNFT | 221.00 | 13,039.00 | 110.00 | 6,490.00 | 145.00 | 8,555.00 | 206.00 | 12,154.00 |
| 0040 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 35 | LNFT | 240.00 | 8,400.00 | 170.00 | 5,950.00 | 160.00 | 5,600.00 | 258.00 | 9,030.00 |
| 0041 | 701-10-01120 | Reinforced Concrete Pipe (Extension) (42") | 12 | LNFT | 255.00 | 3,060.00 | 250.00 | 3,000.00 | 510.00 | 6,120.00 | 369.00 | 4,428.00 |
| 0042 | 701-15-00100 | Concrete Collar | 7 | EACH | 1,050.00 | 7,350.00 | 1,000.00 | 7,000.00 | 2,800.00 | 19,600.00 | 1,700.00 | 11,900.00 |
| 0043 | 702-01-00100 | Junction Boxes (10'x5.5'x37') | 1 | EACH | 42,000.00 | 42,000.00 | 77,000.00 | 77,000.00 | 54,000.00 | 54,000.00 | 85,000.00 | 85,000.00 |
| 0044 | 702-03-00100 | Catch Basins (CB-01) | 16 | EACH | 2,400.00 | 38,400.00 | 2,000.00 | 32,000.00 | 2,400.00 | 38,400.00 | 3,100.00 | 49,600.00 |
| 0045 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 354.00 | 354.00 | 500.00 | 500.00 | 900.00 | 900.00 | 1,000.00 | 1,000.00 |
| 0046 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 8,024.00 | 8,024.00 | 5,000.00 | 5,000.00 | 2,000.00 | 2,000.00 | 32,000.00 | 32,000.00 |
| 0047 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 25 | EACH | 120.00 | 3,000.00 | 25.00 | 625.00 | 275.00 | 6,875.00 | 280.00 | 7,000.00 |
| 0048 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 10 | EACH | 56.00 | 560.00 | 1,000.00 | 10,000.00 | 185.00 | 1,850.00 | 1,500.00 | 15,000.00 |
| 0049 | 717-01-00100 | Seeding | 30 | LB | 2.25 | 67.50 | 20.00 | 600.00 | 16.00 | 480.00 | 5.00 | 150.00 |
| 0050 | 718-01-00100 | Fertilizer | 975 | LB | 0.70 | 682.50 | 2.00 | 1,950.00 | 0.70 | 682.50 | 0.50 | 487.50 |
| 0051 | 726-01-00100 | Bedding Material | 883 | CUYD | 62.00 | 54,746.00 | 110.00 | 97,130.00 | 85.00 | 75,055.00 | 55.00 | 48,565.00 |
| 0052 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,900.00 | 5,900.00 | 9,000.00 | 9,000.00 | 1,000.00 | 1,000.00 | 8,000.00 | 8,000.00 |
| 0053 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 360 | INLF | 0.90 | 324.00 | 2.00 | 720.00 | 0.75 | 270.00 | 1.00 | 360.00 |
| 0054 | NS-MSC-00120 | Drainage Structure (Miscellaneous)(10'x4' RCB) (1638.8 LNFT) | 1 | EACH | 1,009,076.76 | 1,009,076.76 | 1,070,000.00 | 1,070,000.00 | 971,000.00 | 971,000.00 | 1,380,000.00 | 1,380,000.00 |
| SUBTOTAL ALT DA1 | 1,321,200 | 1,520,490 | 1,407,946 | 1,758,938 | ||||||||
| Alternate EA1 | ||||||||||||
| 0055 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,770.00 | 1,770.00 | 15,000.00 | 15,000.00 | 5,000.00 | 5,000.00 | 2,500.00 | 2,500.00 |
| 0056 | 202-02-06100 | Removal of Concrete Walks and Drives | 667 | SQYD | 8.26 | 5,509.42 | 9.00 | 6,003.00 | 16.00 | 10,672.00 | 13.00 | 8,671.00 |
| 0057 | 202-02-06140 | Removal of Curbs (Concrete) | 185 | LNFT | 12.00 | 2,220.00 | 10.00 | 1,850.00 | 8.00 | 1,480.00 | 13.00 | 2,405.00 |
| 0058 | 202-02-14500 | Removal of Guard Rail | 180 | LNFT | 5.90 | 1,062.00 | 10.00 | 1,800.00 | 18.00 | 3,240.00 | 13.00 | 2,340.00 |
| 0059 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 55,000.00 | 55,000.00 | 33,000.00 | 33,000.00 | 178,000.00 | 178,000.00 | 14,000.00 | 14,000.00 |
| 0060 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 700 | CUYD | 17.00 | 11,900.00 | 35.00 | 24,500.00 | 23.00 | 16,100.00 | 10.00 | 7,000.00 |
| 0061 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 186 | CUYD | 65.00 | 12,090.00 | 95.00 | 17,670.00 | 82.00 | 15,252.00 | 65.00 | 12,090.00 |
| 0062 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 200 | SQYD | 70.00 | 14,000.00 | 75.00 | 15,000.00 | 105.00 | 21,000.00 | 70.00 | 14,000.00 |
| 0063 | 601-02-01500 | Portland Cement Concrete Pavement (12" Thick) (Crossovers & Turnouts) | 497.1 | SQYD | 108.00 | 53,686.80 | 75.00 | 37,282.50 | 88.00 | 43,744.80 | 90.00 | 44,739.00 |
| 0064 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 2,489 | LNFT | 125.00 | 311,125.00 | 160.00 | 398,240.00 | 106.00 | 263,834.00 | 195.00 | 485,355.00 |
| 0065 | 701-10-01000 | Reinforced Concrete Pipe (Extension) (12") | 16 | LNFT | 175.00 | 2,800.00 | 175.00 | 2,800.00 | 160.00 | 2,560.00 | 138.00 | 2,208.00 |
| 0066 | 701-14-00100 | Cleaning Existing Pipes | 240 | LNFT | 165.00 | 39,600.00 | 15.00 | 3,600.00 | 10.00 | 2,400.00 | 12.50 | 3,000.00 |
| 0067 | 701-15-00100 | Concrete Collar | 2 | EACH | 1,030.00 | 2,060.00 | 1,000.00 | 2,000.00 | 3,000.00 | 6,000.00 | 1,700.00 | 3,400.00 |
| 0068 | 702-03-00100 | Catch Basins (CB-01) | 13 | EACH | 2,335.00 | 30,355.00 | 2,000.00 | 26,000.00 | 3,500.00 | 45,500.00 | 3,100.00 | 40,300.00 |
| 0069 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 354.00 | 354.00 | 500.00 | 500.00 | 100.00 | 100.00 | 1,000.00 | 1,000.00 |
| 0070 | 707-03-00100 | Combination Concrete Curb and Gutter | 185 | LNFT | 42.00 | 7,770.00 | 25.00 | 4,625.00 | 56.00 | 10,360.00 | 75.00 | 13,875.00 |
| 0071 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 7,080.00 | 7,080.00 | 5,000.00 | 5,000.00 | 2,000.00 | 2,000.00 | 20,000.00 | 20,000.00 |
| 0072 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 25 | EACH | 120.00 | 3,000.00 | 25.00 | 625.00 | 275.00 | 6,875.00 | 280.00 | 7,000.00 |
| 0073 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 10 | EACH | 56.00 | 560.00 | 1,000.00 | 10,000.00 | 180.00 | 1,800.00 | 1,500.00 | 15,000.00 |
| 0074 | 717-01-00100 | Seeding | 44 | LB | 2.00 | 88.00 | 20.00 | 880.00 | 18.00 | 792.00 | 5.00 | 220.00 |
| 0075 | 718-01-00100 | Fertilizer | 1,425 | LB | 0.70 | 997.50 | 2.00 | 2,850.00 | 0.70 | 997.50 | 0.50 | 712.50 |
| 0076 | 726-01-00100 | Bedding Material | 747 | CUYD | 57.00 | 42,579.00 | 75.00 | 56,025.00 | 85.00 | 63,495.00 | 55.00 | 41,085.00 |
| 0077 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,900.00 | 5,900.00 | 9,000.00 | 9,000.00 | 2,500.00 | 2,500.00 | 4,000.00 | 4,000.00 |
| 0078 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 2,340 | INLF | 1.50 | 3,510.00 | 2.00 | 4,680.00 | 1.10 | 2,574.00 | 1.25 | 2,925.00 |
| SUBTOTAL ALT EA1 | 615,016.72 | 678,930.50 | 706,276.30 | 747,825.50 | ||||||||
| CONTRACTOR TOTAL | 3,783,907.00 | 4,068,773.40 | 4,168,808.85 | 4,562,366.50 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Wallace C. Drennan, Inc. |
- 6 - RCS Contractors, Inc. |
- 7 - Fleming Construction Co., Inc. |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 5,000.00 | 5,000.00 | 25,000.00 | 25,000.00 |
| 0002 | 202-02-00010 | Removal of Concrete Headwalls | 2 | EACH | 100.00 | 200.00 | 1,000.00 | 2,000.00 | 5,000.00 | 10,000.00 |
| 0003 | 202-02-02000 | Removal of Asphalt Drives | 60.7 | SQYD | 1.00 | 60.70 | 10.00 | 607.00 | 17.00 | 1,031.90 |
| 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 89.3 | LNFT | 1.00 | 89.30 | 10.00 | 893.00 | 5.00 | 446.50 |
| 0005 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 30,000.00 | 30,000.00 | 130,000.00 | 130,000.00 | 430,000.00 | 430,000.00 |
| 0006 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 1,389 | CUYD | 44.00 | 61,116.00 | 13.85 | 19,237.65 | 25.00 | 34,725.00 |
| 0007 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 146 | CUYD | 50.00 | 7,300.00 | 37.61 | 5,491.06 | 100.00 | 14,600.00 |
| 0008 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 20 | TON | 225.00 | 4,500.00 | 300.00 | 6,000.00 | 310.00 | 6,200.00 |
| 0009 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 200 | SQYD | 85.00 | 17,000.00 | 200.00 | 40,000.00 | 115.00 | 23,000.00 |
| 0010 | 701-10-01000 | Reinforced Concrete Pipe (Extension) (12") | 36 | LNFT | 130.00 | 4,680.00 | 40.00 | 1,440.00 | 260.00 | 9,360.00 |
| 0011 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 36 | LNFT | 170.00 | 6,120.00 | 65.00 | 2,340.00 | 290.00 | 10,440.00 |
| 0012 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 52 | LNFT | 230.00 | 11,960.00 | 130.00 | 6,760.00 | 300.00 | 15,600.00 |
| 0013 | 701-15-00100 | Concrete Collar | 7 | EACH | 750.00 | 5,250.00 | 2,000.00 | 14,000.00 | 10,000.00 | 70,000.00 |
| 0014 | 702-03-00100 | Catch Basins (CB-01) | 16 | EACH | 2,500.00 | 40,000.00 | 2,200.00 | 35,200.00 | 3,200.00 | 51,200.00 |
| 0015 | 702-03-00200 | Catch Basins (CB-02) | 1 | EACH | 5,000.00 | 5,000.00 | 3,700.00 | 3,700.00 | 5,000.00 | 5,000.00 |
| 0016 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 1,000.00 | 1,000.00 | 2,000.00 | 2,000.00 | 500.00 | 500.00 |
| 0017 | 707-03-00100 | Combination Concrete Curb and Gutter | 89.3 | LNFT | 60.00 | 5,358.00 | 45.00 | 4,018.50 | 25.00 | 2,232.50 |
| 0018 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 | 20,000.00 | 20,000.00 |
| 0019 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 25 | EACH | 100.00 | 2,500.00 | 700.00 | 17,500.00 | 200.00 | 5,000.00 |
| 0020 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 10 | EACH | 100.00 | 1,000.00 | 300.00 | 3,000.00 | 2,500.00 | 25,000.00 |
| 0021 | 717-01-00100 | Seeding | 34 | LB | 10.00 | 340.00 | 10.00 | 340.00 | 20.00 | 680.00 |
| 0022 | 718-01-00100 | Fertilizer | 1,087 | LB | 0.50 | 543.50 | 0.50 | 543.50 | 1.00 | 1,087.00 |
| 0023 | 726-01-00100 | Bedding Material | 1,049 | CUYD | 70.00 | 73,430.00 | 65.00 | 68,185.00 | 65.00 | 68,185.00 |
| 0024 | 727-01-00100 | Mobilization | 1 | LUMP | 165,000.00 | 165,000.00 | 90,048.29 | 90,048.29 | 110,000.00 | 110,000.00 |
| 0025 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 | 15,000.00 | 15,000.00 |
| 0026 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 960 | INLF | 2.00 | 1,920.00 | 0.45 | 432.00 | 1.50 | 1,440.00 |
| 0027 | NS-MSC-00120 | Drainage Structure (Miscellaneous)(10'x4' RCB)(1966.22 LNFT) | 1 | EACH | 1,600,000.00 | 1,600,000.00 | 1,663,000.00 | 1,663,000.00 | 1,350,000.00 | 1,350,000.00 |
| SUBTOTAL GENERAL | 2,094,368 | 2,196,736 | 2,305,728 | |||||||
| Alternate DA1 | ||||||||||
| 0028 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 15,000.00 | 15,000.00 | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 |
| 0029 | 202-02-00010 | Removal of Bienvenu Plantation Monument | 1 | EACH | 10,000.00 | 10,000.00 | 3,000.00 | 3,000.00 | 2,500.00 | 2,500.00 |
| 0030 | 202-02-02000 | Removal of Asphalt Drives | 70 | SQYD | 1.00 | 70.00 | 5.00 | 350.00 | 17.00 | 1,190.00 |
| 0031 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 10,000.00 | 10,000.00 | 100,000.00 | 100,000.00 | 331,200.00 | 331,200.00 |
| 0032 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 1,169 | CUYD | 44.00 | 51,436.00 | 13.85 | 16,190.65 | 25.00 | 29,225.00 |
| 0033 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 138 | CUYD | 50.00 | 6,900.00 | 37.61 | 5,190.18 | 100.00 | 13,800.00 |
| 0034 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 15 | TON | 225.00 | 3,375.00 | 300.00 | 4,500.00 | 310.00 | 4,650.00 |
| 0035 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 200 | SQYD | 85.00 | 17,000.00 | 200.00 | 40,000.00 | 115.00 | 23,000.00 |
| 0036 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 184 | LNFT | 250.00 | 46,000.00 | 130.00 | 23,920.00 | 300.00 | 55,200.00 |
| 0037 | 701-10-01000 | Reinforced Concrete Pipe (Extension) (12") | 32 | LNFT | 130.00 | 4,160.00 | 40.00 | 1,280.00 | 260.00 | 8,320.00 |
| 0038 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 8 | LNFT | 250.00 | 2,000.00 | 65.00 | 520.00 | 290.00 | 2,320.00 |
| 0039 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 59 | LNFT | 200.00 | 11,800.00 | 130.00 | 7,670.00 | 300.00 | 17,700.00 |
| 0040 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 35 | LNFT | 230.00 | 8,050.00 | 130.00 | 4,550.00 | 300.00 | 10,500.00 |
| 0041 | 701-10-01120 | Reinforced Concrete Pipe (Extension) (42") | 12 | LNFT | 350.00 | 4,200.00 | 200.00 | 2,400.00 | 500.00 | 6,000.00 |
| 0042 | 701-15-00100 | Concrete Collar | 7 | EACH | 750.00 | 5,250.00 | 2,000.00 | 14,000.00 | 10,000.00 | 70,000.00 |
| 0043 | 702-01-00100 | Junction Boxes (10'x5.5'x37') | 1 | EACH | 88,000.00 | 88,000.00 | 15,000.00 | 15,000.00 | 50,000.00 | 50,000.00 |
| 0044 | 702-03-00100 | Catch Basins (CB-01) | 16 | EACH | 3,000.00 | 48,000.00 | 2,200.00 | 35,200.00 | 3,200.00 | 51,200.00 |
| 0045 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 1,000.00 | 1,000.00 | 3,700.00 | 3,700.00 | 500.00 | 500.00 |
| 0046 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | 60,000.00 | 60,000.00 | 10,000.00 | 10,000.00 |
| 0047 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 25 | EACH | 100.00 | 2,500.00 | 700.00 | 17,500.00 | 200.00 | 5,000.00 |
| 0048 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 10 | EACH | 100.00 | 1,000.00 | 300.00 | 3,000.00 | 2,500.00 | 25,000.00 |
| 0049 | 717-01-00100 | Seeding | 30 | LB | 10.00 | 300.00 | 10.00 | 300.00 | 20.00 | 600.00 |
| 0050 | 718-01-00100 | Fertilizer | 975 | LB | 0.50 | 487.50 | 0.50 | 487.50 | 1.00 | 975.00 |
| 0051 | 726-01-00100 | Bedding Material | 883 | CUYD | 70.00 | 61,810.00 | 65.00 | 57,395.00 | 65.00 | 57,395.00 |
| 0052 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 |
| 0053 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 360 | INLF | 2.00 | 720.00 | 0.45 | 162.00 | 1.50 | 540.00 |
| 0054 | NS-MSC-00120 | Drainage Structure (Miscellaneous)(10'x4' RCB) (1638.8 LNFT) | 1 | EACH | 1,366,000.00 | 1,366,000.00 | 1,451,072.98 | 1,451,072.98 | 1,150,000.00 | 1,150,000.00 |
| SUBTOTAL ALT DA1 | 1,800,059 | 1,887,388 | 1,951,815 | |||||||
| Alternate EA1 | ||||||||||
| 0055 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 |
| 0056 | 202-02-06100 | Removal of Concrete Walks and Drives | 667 | SQYD | 1.00 | 667.00 | 10.00 | 6,670.00 | 10.00 | 6,670.00 |
| 0057 | 202-02-06140 | Removal of Curbs (Concrete) | 185 | LNFT | 1.00 | 185.00 | 10.00 | 1,850.00 | 10.00 | 1,850.00 |
| 0058 | 202-02-14500 | Removal of Guard Rail | 180 | LNFT | 10.00 | 1,800.00 | 5.00 | 900.00 | 10.00 | 1,800.00 |
| 0059 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 10,000.00 | 10,000.00 | 105,000.00 | 105,000.00 | 180,000.00 | 180,000.00 |
| 0060 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 700 | CUYD | 44.00 | 30,800.00 | 13.85 | 9,695.00 | 25.00 | 17,500.00 |
| 0061 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 186 | CUYD | 50.00 | 9,300.00 | 37.61 | 6,995.46 | 100.00 | 18,600.00 |
| 0062 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 200 | SQYD | 85.00 | 17,000.00 | 200.00 | 40,000.00 | 115.00 | 23,000.00 |
| 0063 | 601-02-01500 | Portland Cement Concrete Pavement (12" Thick) (Crossovers & Turnouts) | 497.1 | SQYD | 125.00 | 62,137.50 | 112.00 | 55,675.20 | 130.00 | 64,623.00 |
| 0064 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 2,489 | LNFT | 200.00 | 497,800.00 | 105.00 | 261,345.00 | 160.00 | 398,240.00 |
| 0065 | 701-10-01000 | Reinforced Concrete Pipe (Extension) (12") | 16 | LNFT | 130.00 | 2,080.00 | 40.00 | 640.00 | 260.00 | 4,160.00 |
| 0066 | 701-14-00100 | Cleaning Existing Pipes | 240 | LNFT | 10.00 | 2,400.00 | 20.00 | 4,800.00 | 5.00 | 1,200.00 |
| 0067 | 701-15-00100 | Concrete Collar | 2 | EACH | 750.00 | 1,500.00 | 2,000.00 | 4,000.00 | 10,000.00 | 20,000.00 |
| 0068 | 702-03-00100 | Catch Basins (CB-01) | 13 | EACH | 4,500.00 | 58,500.00 | 2,200.00 | 28,600.00 | 3,200.00 | 41,600.00 |
| 0069 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 1,000.00 | 1,000.00 | 2,000.00 | 2,000.00 | 500.00 | 500.00 |
| 0070 | 707-03-00100 | Combination Concrete Curb and Gutter | 185 | LNFT | 60.00 | 11,100.00 | 45.00 | 8,325.00 | 25.00 | 4,625.00 |
| 0071 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,000.00 | 10,000.00 | 60,000.00 | 60,000.00 | 10,000.00 | 10,000.00 |
| 0072 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 25 | EACH | 400.00 | 10,000.00 | 700.00 | 17,500.00 | 200.00 | 5,000.00 |
| 0073 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 10 | EACH | 400.00 | 4,000.00 | 300.00 | 3,000.00 | 2,500.00 | 25,000.00 |
| 0074 | 717-01-00100 | Seeding | 44 | LB | 10.00 | 440.00 | 10.00 | 440.00 | 20.00 | 880.00 |
| 0075 | 718-01-00100 | Fertilizer | 1,425 | LB | 0.50 | 712.50 | 0.50 | 712.50 | 1.00 | 1,425.00 |
| 0076 | 726-01-00100 | Bedding Material | 747 | CUYD | 70.00 | 52,290.00 | 65.00 | 48,555.00 | 65.00 | 48,555.00 |
| 0077 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 59,999.84 | 59,999.84 | 15,000.00 | 15,000.00 |
| 0078 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 2,340 | INLF | 2.00 | 4,680.00 | 1.10 | 2,574.00 | 1.50 | 3,510.00 |
| SUBTOTAL ALT EA1 | 803,392.00 | 734,277.00 | 898,738.00 | |||||||
| CONTRACTOR TOTAL | 4,697,818.00 | 4,818,401.31 | 5,156,280.90 | |||||||