Bid Tabulations
Letting of
10/27/2010
LA DOTD Headquarters
| Lead Project: 045-02-0024-R1 | |
| Parish: Caddo | |
| Routes: LA 1 | |
| Description: WARD II INDUSTRIAL PARK TURN LANES | |
| Type Const: GRADING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT AND RELATED WORK | |
| Estimated Construction Cost: $617,034.10 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 40615 | Specialty Trackhoe & Dozer Serv.Inc | $564,312.33 |
| 2 | 36374 | Best-Yet Builders, Llc | $642,698.63 |
| 3 | 17464 | Benton & Brown, LLC. | $846,857.90 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Specialty Trackhoe & Dozer Serv.Inc |
- 2 - Best-Yet Builders, Llc |
- 3 - Benton & Brown, LLC. |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 2,000.00 | 2,000.00 | 16,500.00 | 16,500.00 | 10,000.00 | 10,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 2,000.00 | 2,000.00 | 5,500.00 | 5,500.00 | 3,000.00 | 3,000.00 |
| 0003 | 203-01-00100 | General Excavation | 2,835 | CUYD | 6.75 | 19,136.25 | 8.80 | 24,948.00 | 9.00 | 25,515.00 |
| 0004 | 203-03-00100 | Embankment | 963 | CUYD | 3.00 | 2,889.00 | 11.00 | 10,593.00 | 19.00 | 18,297.00 |
| 0005 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 1 | EACH | 200.00 | 200.00 | 275.00 | 275.00 | 110.00 | 110.00 |
| 0006 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 5 | EACH | 575.00 | 2,875.00 | 275.00 | 1,375.00 | 1,000.00 | 5,000.00 |
| 0007 | 204-06-00100 | Temporary Silt Fencing | 3,000 | LNFT | 2.00 | 6,000.00 | 2.75 | 8,250.00 | 4.00 | 12,000.00 |
| 0008 | 302-02-06120 | Class II Base Course (12" Thick) (Stone or Recycled Portland Cement Concrete) | 5,524.1 | SQYD | 26.50 | 146,388.65 | 31.50 | 174,009.15 | 35.50 | 196,105.55 |
| 0011 | 401-01-00100 | Aggregate Surface Course (Net Section) | 11.7 | CUYD | 98.00 | 1,146.60 | 110.00 | 1,287.00 | 300.00 | 3,510.00 |
| 0012 | 502-01-00100 | Superpave Asphaltic Concrete | 2,159.1 | TON | 100.00 | 215,910.00 | 99.00 | 213,750.90 | 125.00 | 269,887.50 |
| 0013 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 73.6 | TON | 100.00 | 7,360.00 | 104.50 | 7,691.20 | 125.00 | 9,200.00 |
| 0014 | 502-03-00300 | Superpave Asphaltic Concrete (6" Thick) | 200.5 | SQYD | 65.00 | 13,032.50 | 55.00 | 11,027.50 | 100.00 | 20,050.00 |
| 0015 | 509-01-00100 | Cold Planing Asphaltic Pavement | 7,154.5 | SQYD | 2.75 | 19,674.88 | 2.75 | 19,674.88 | 4.00 | 28,618.00 |
| 0016 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 160 | LNFT | 42.00 | 6,720.00 | 44.00 | 7,040.00 | 100.00 | 16,000.00 |
| 0017 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 178 | LNFT | 50.00 | 8,900.00 | 71.50 | 12,727.00 | 120.00 | 21,360.00 |
| 0018 | 702-08-00100 | Side Drain Safety End (Type I) | 6 | EACH | 2,000.00 | 12,000.00 | 825.00 | 4,950.00 | 1,800.00 | 10,800.00 |
| 0019 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 23,000.00 | 23,000.00 | 19,250.00 | 19,250.00 | 52,000.00 | 52,000.00 |
| 0020 | 716-01-00100 | Mulch (Vegetative) | 3.3 | TON | 1,500.00 | 4,950.00 | 825.00 | 2,722.50 | 1,300.00 | 4,290.00 |
| 0021 | 717-01-00100 | Seeding | 50 | LB | 10.00 | 500.00 | 8.80 | 440.00 | 11.00 | 550.00 |
| 0022 | 718-01-00100 | Fertilizer | 1,000 | LB | 0.50 | 500.00 | 0.55 | 550.00 | 0.55 | 550.00 |
| 0023 | 726-01-00100 | Bedding Material | 33.2 | CUYD | 60.00 | 1,992.00 | 82.50 | 2,739.00 | 75.00 | 2,490.00 |
| 0024 | 727-01-00100 | Mobilization | 1 | LUMP | 25,000.00 | 25,000.00 | 33,000.00 | 33,000.00 | 60,000.00 | 60,000.00 |
| 0025 | 731-02-00100 | Reflectorized Raised Pavement Markers | 800 | EACH | 4.85 | 3,880.00 | 5.30 | 4,240.00 | 5.35 | 4,280.00 |
| 0026 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 295 | LNFT | 0.75 | 221.25 | 0.80 | 236.00 | 0.85 | 250.75 |
| 0027 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 272 | LNFT | 3.00 | 816.00 | 3.30 | 897.60 | 3.30 | 897.60 |
| 0028 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.58 | MILE | 2,450.00 | 3,871.00 | 2,695.00 | 4,258.10 | 2,700.00 | 4,266.00 |
| 0029 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.19 | MILE | 1,000.00 | 190.00 | 1,100.00 | 209.00 | 1,100.00 | 209.00 |
| 0030 | 732-03-02040 | Plastic Pvmt Strip (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.056 | MILE | 5,000.00 | 280.00 | 5,500.00 | 308.00 | 5,500.00 | 308.00 |
| 0031 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 1 | EACH | 200.00 | 200.00 | 220.00 | 220.00 | 220.00 | 220.00 |
| 0032 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 200.00 | 200.00 | 220.00 | 220.00 | 220.00 | 220.00 |
| 0033 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 200.00 | 400.00 | 220.00 | 440.00 | 220.00 | 440.00 |
| 0034 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 1 | EACH | 500.00 | 500.00 | 550.00 | 550.00 | 550.00 | 550.00 |
| 0035 | 732-05-00100 | Removal of Existing Markings | 0.283 | MILE | 6,000.00 | 1,698.00 | 6,600.00 | 1,867.80 | 6,500.00 | 1,839.50 |
| 0036 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,000.00 | 7,000.00 | 19,250.00 | 19,250.00 | 15,000.00 | 15,000.00 |
| 0037 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 2,984 | INLF | 1.50 | 4,476.00 | 2.75 | 8,206.00 | 2.00 | 5,968.00 |
| 0038 | 304-05-00100 | Lime Treatment (Type E) | 78.32 | TON | 235.00 | 18,405.20 | 300.00 | 23,496.00 | 550.00 | 43,076.00 |
| CONTRACTOR TOTAL | 564,312.33 | 642,698.63 | 846,857.90 | |||||||