Letting of 12/15/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 864-11-0008
Parish: WINN
Routes: LA 477
Description: LA 477 BRIDGES
Type Const: clearing and grubbing, grading, drainage structures, classii base course, lime treatment,
superpave asphaltic concrete, concrete slab span bridges and related work.
 
RankLicenseBidderAmount
112312 GILCHRIST CONSTRUCTION CO. LLC $2,175,250.20
234567 JAMES CONSTRUCTION GROUP LLC $2,327,642.40
309090 GUINN BROTHERS, LLC. $2,561,421.91
 
Item Number Item Description Quantity Unit of Measure - 1 -
GILCHRIST CONSTRUCTION CO. LLC
- 2 -
JAMES CONSTRUCTION GROUP LLC
- 3 -
GUINN BROTHERS, LLC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 35,000.00 35,000.00 130,000.00 130,000.00 55,000.00 55,000.00    
202-02-A-01 removal of bridges (sta. 10+304.346; 5.71 m x 46.126 m
timber bridge.)
1      ea 12,000.00 12,000.00 15,000.00 15,000.00 12,000.00 12,000.00    
202-02-A-02 removal of bridges (sta. 20+314.121; 5.65 m x 69.275 m
timber bridge.)
1      ea 18,000.00 18,000.00 25,000.00 25,000.00 22,000.00 22,000.00    
202-02-A-03 removal of bridges (sta. 30+315.909; 5.70 m x 12.000 m
timber bridge.)
1      ea 3,000.00 3,000.00 7,000.00 7,000.00 6,000.00 6,000.00    
202-02-G removal of surfacing & stabilized base 6,605.0    sq m 3.00 19,815.00 4.00 26,420.00 5.00 33,025.00    
202-02-H removal of guard rail 183      ln m 15.00 2,745.00 12.00 2,196.00 10.00 1,830.00    
203-01 general excavation 11,351      cu m 5.00 56,755.00 10.00 113,510.00 6.00 68,106.00    
203-02 drainage excavation 1,311      cu m 5.00 6,555.00 11.00 14,421.00 8.00 10,488.00    
203-03 muck excavation 300      cu m 15.00 4,500.00 10.00 3,000.00 10.00 3,000.00    
203-04 embankment 8,163      cu m 15.00 122,445.00 12.00 97,956.00 15.00 122,445.00    
204-02 temporary hay or straw bales 20      ea 25.00 500.00 7.00 140.00 10.00 200.00    
204-05-A temporary sediment check dams (hay) 12      ea 150.00 1,800.00 150.00 1,800.00 100.00 1,200.00    
204-06 temporary silt fencing 1,938      ln m 6.00 11,628.00 4.50 8,721.00 5.00 9,690.00    
302-02-B class ii base course (220 mm thick) 8,956.5    sq m 17.00 152,260.50 17.00 152,260.50 23.50 210,477.75    
304-01 lime 135.42   Mg 125.00 16,927.50 125.00 16,927.50 135.00 18,281.70    
304-04-D lime treatment (type d) (300 mm thick) 4,478      sq m 2.25 10,075.50 2.00 8,956.00 10.00 44,780.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
16      cu m 85.00 1,360.00 90.00 1,440.00 100.00 1,600.00    
402-01 traffic maintenance aggregate (vehicular measurement) 100.0    cu m 35.00 3,500.00 60.00 6,000.00 85.00 8,500.00    
502-01 superpave asphaltic concrete 2,676.9    Mg 75.00 200,767.50 87.00 232,890.30 100.00 267,690.00    
502-01-A superpave asphaltic concrete, paved drives and
turnouts
92.9    Mg 125.00 11,612.50 153.00 14,213.70 175.00 16,257.50    
701-05-G side drain pipe (450 mm) 27.0    ln m 165.00 4,455.00 130.00 3,510.00 150.00 4,050.00    
704-03 blocked out guard rail 123.83   ln m 55.00 6,810.65 50.00 6,191.50 62.00 7,677.46    
704-08-B guard rail transitions (double thrie beam) 60.96   ln m 150.00 9,144.00 140.00 8,534.40 155.00 9,448.80    
704-11-A guard rail end treatment (flared) 8      ea 2,000.00 16,000.00 1,800.00 14,400.00 2,200.00 17,600.00    
708-01 right-of-way monument 37      ea 300.00 11,100.00 200.00 7,400.00 160.00 5,920.00    
708-02 right-of-way monument witness post 37      ea 300.00 11,100.00 200.00 7,400.00 160.00 5,920.00    
711-01-C riprap (15 kg, 360 mm thick) 222      sq m 53.00 11,766.00 50.00 11,100.00 50.00 11,100.00    
711-01-D riprap (25 kg, 460 mm thick) 1,850      sq m 53.00 98,050.00 50.00 92,500.00 55.00 101,750.00    
711-04 geotextile fabric 2,773      sq m 3.25 9,012.25 3.00 8,319.00 5.00 13,865.00    
713-01 temporary signs & barricades lump      lump 24,000.00 24,000.00 15,000.00 15,000.00 30,000.00 30,000.00    
713-05-A temporary pavement markings (solid line)(100 mm width) 7.880  km 500.00 3,940.00 425.00 3,349.00 525.00 4,137.00    
713-07 temporary reflectorized raised pavement markers 96      ea 6.00 576.00 5.00 480.00 7.00 672.00    
716-01-A mulch (vegetative) 3.5    hctr 1,500.00 5,250.00 1,300.00 4,550.00 3,500.00 12,250.00    
717-01 seeding 158      kg 15.00 2,370.00 16.50 2,607.00 20.00 3,160.00    
718-01 fertilizer 3,937      kg 0.50 1,968.50 0.50 1,968.50 1.00 3,937.00    
720-01-A erosion control system, slope protection (type a) 628      sq m 1.45 910.60 2.50 1,570.00 4.00 2,512.00    
722-01 project site laboratory 1      ea 10,000.00 10,000.00 5,000.00 5,000.00 15,000.00 15,000.00    
725-04 low profile runaround 1      ea 10,000.00 10,000.00 15,000.00 15,000.00 30,000.00 30,000.00    
726-01 bedding material 29.1    cu m 75.00 2,182.50 100.00 2,910.00 100.00 2,910.00    
727-01 mobilization lump      lump 200,000.00 200,000.00 210,000.00 210,000.00 225,000.00 225,000.00    
729-16-B object marker assembly (type 2) 4      ea 60.00 240.00 58.00 232.00 70.00 280.00    
729-16-C object marker assembly (type 3) 8      ea 65.00 520.00 68.00 544.00 80.00 640.00    
731-01 nonreflectorized raised pavement markers 132      ea 10.00 1,320.00 9.50 1,254.00 15.00 1,980.00    
731-02 reflectorized raised pavement markers 138      ea 6.00 828.00 5.00 690.00 10.00 1,380.00    
732-02-A plastic pavement striping (solid line)(100 mm width) 3.940  km 1,400.00 5,516.00 1,300.00 5,122.00 2,000.00 7,880.00    
732-03-A plastic pavement striping (broken line)(100 mm width) 0.440  km 600.00 264.00 500.00 220.00 1,000.00 440.00    
740-01 construction layout lump      lump 40,000.00 40,000.00 25,000.00 25,000.00 55,000.00 55,000.00    
741-09 adjusting water house connections 1      each 700.00 700.00 500.00 500.00 500.00 500.00    
742-02 adjusting sanitary sewer house connections 1      each 700.00 700.00 750.00 750.00 1,500.00 1,500.00    
804-01-C precast concrete piles (400 mm) 1,745.0    ln m 150.00 261,750.00 160.00 279,200.00 135.00 235,575.00    
804-12 loading permanent piles 2      ea 100.00 200.00 2,000.00 4,000.00 1.00 2.00    
805-01-B class a concrete (box culvert headwalls) 20.78   cu m 925.00 19,221.50 1,100.00 22,858.00 1,400.00 29,092.00    
805-01-F class a concrete (bents) 133.74   cu m 730.00 97,630.20 700.00 93,618.00 800.00 106,992.00    
805-03 class aa concrete 611.96   cu m 500.00 305,980.00 500.00 305,980.00 650.00 397,774.00    
805-12-E reinforced concrete box culverts (1200 mm x 1200 mm) 90.00   ln m 800.00 72,000.00 1,000.00 90,000.00 820.00 73,800.00    
806-01 deformed reinforcing steel 74,598      kg 1.75 130,546.50 1.50 111,897.00 1.65 123,086.70    
810-01 concrete railing (barrier) 264.00   ln m 230.00 60,720.00 125.00 33,000.00 150.00 39,600.00    
813-01 concrete approach slabs 295.20   sq m 160.00 47,232.00 180.00 53,136.00 225.00 66,420.00    
                       
 CONTRACTOR TOTAL       2,175,250.20   2,327,642.40   2,561,421.91    