| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GILCHRIST CONSTRUCTION CO. LLC |
- 2 - JAMES CONSTRUCTION GROUP LLC |
- 3 - GUINN BROTHERS, LLC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
35,000.00 |
35,000.00 |
130,000.00 |
130,000.00 |
55,000.00 |
55,000.00 |
|
|
| 202-02-A-01 |
removal of bridges (sta. 10+304.346; 5.71 m x 46.126 m
timber bridge.) |
1   |
ea |
12,000.00 |
12,000.00 |
15,000.00 |
15,000.00 |
12,000.00 |
12,000.00 |
|
|
| 202-02-A-02 |
removal of bridges (sta. 20+314.121; 5.65 m x 69.275 m
timber bridge.) |
1   |
ea |
18,000.00 |
18,000.00 |
25,000.00 |
25,000.00 |
22,000.00 |
22,000.00 |
|
|
| 202-02-A-03 |
removal of bridges (sta. 30+315.909; 5.70 m x 12.000 m
timber bridge.) |
1   |
ea |
3,000.00 |
3,000.00 |
7,000.00 |
7,000.00 |
6,000.00 |
6,000.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
6,605.0 |
sq m |
3.00 |
19,815.00 |
4.00 |
26,420.00 |
5.00 |
33,025.00 |
|
|
| 202-02-H |
removal of guard rail
|
183   |
ln m |
15.00 |
2,745.00 |
12.00 |
2,196.00 |
10.00 |
1,830.00 |
|
|
| 203-01 |
general excavation
|
11,351   |
cu m |
5.00 |
56,755.00 |
10.00 |
113,510.00 |
6.00 |
68,106.00 |
|
|
| 203-02 |
drainage excavation
|
1,311   |
cu m |
5.00 |
6,555.00 |
11.00 |
14,421.00 |
8.00 |
10,488.00 |
|
|
| 203-03 |
muck excavation
|
300   |
cu m |
15.00 |
4,500.00 |
10.00 |
3,000.00 |
10.00 |
3,000.00 |
|
|
| 203-04 |
embankment
|
8,163   |
cu m |
15.00 |
122,445.00 |
12.00 |
97,956.00 |
15.00 |
122,445.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
20   |
ea |
25.00 |
500.00 |
7.00 |
140.00 |
10.00 |
200.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
12   |
ea |
150.00 |
1,800.00 |
150.00 |
1,800.00 |
100.00 |
1,200.00 |
|
|
| 204-06 |
temporary silt fencing
|
1,938   |
ln m |
6.00 |
11,628.00 |
4.50 |
8,721.00 |
5.00 |
9,690.00 |
|
|
| 302-02-B |
class ii base course (220 mm thick)
|
8,956.5 |
sq m |
17.00 |
152,260.50 |
17.00 |
152,260.50 |
23.50 |
210,477.75 |
|
|
| 304-01 |
lime
|
135.42 |
Mg |
125.00 |
16,927.50 |
125.00 |
16,927.50 |
135.00 |
18,281.70 |
|
|
| 304-04-D |
lime treatment (type d) (300 mm thick)
|
4,478   |
sq m |
2.25 |
10,075.50 |
2.00 |
8,956.00 |
10.00 |
44,780.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
16   |
cu m |
85.00 |
1,360.00 |
90.00 |
1,440.00 |
100.00 |
1,600.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
100.0 |
cu m |
35.00 |
3,500.00 |
60.00 |
6,000.00 |
85.00 |
8,500.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
2,676.9 |
Mg |
75.00 |
200,767.50 |
87.00 |
232,890.30 |
100.00 |
267,690.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
92.9 |
Mg |
125.00 |
11,612.50 |
153.00 |
14,213.70 |
175.00 |
16,257.50 |
|
|
| 701-05-G |
side drain pipe (450 mm)
|
27.0 |
ln m |
165.00 |
4,455.00 |
130.00 |
3,510.00 |
150.00 |
4,050.00 |
|
|
| 704-03 |
blocked out guard rail
|
123.83 |
ln m |
55.00 |
6,810.65 |
50.00 |
6,191.50 |
62.00 |
7,677.46 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
60.96 |
ln m |
150.00 |
9,144.00 |
140.00 |
8,534.40 |
155.00 |
9,448.80 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
8   |
ea |
2,000.00 |
16,000.00 |
1,800.00 |
14,400.00 |
2,200.00 |
17,600.00 |
|
|
| 708-01 |
right-of-way monument
|
37   |
ea |
300.00 |
11,100.00 |
200.00 |
7,400.00 |
160.00 |
5,920.00 |
|
|
| 708-02 |
right-of-way monument witness post
|
37   |
ea |
300.00 |
11,100.00 |
200.00 |
7,400.00 |
160.00 |
5,920.00 |
|
|
| 711-01-C |
riprap (15 kg, 360 mm thick)
|
222   |
sq m |
53.00 |
11,766.00 |
50.00 |
11,100.00 |
50.00 |
11,100.00 |
|
|
| 711-01-D |
riprap (25 kg, 460 mm thick)
|
1,850   |
sq m |
53.00 |
98,050.00 |
50.00 |
92,500.00 |
55.00 |
101,750.00 |
|
|
| 711-04 |
geotextile fabric
|
2,773   |
sq m |
3.25 |
9,012.25 |
3.00 |
8,319.00 |
5.00 |
13,865.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
24,000.00 |
24,000.00 |
15,000.00 |
15,000.00 |
30,000.00 |
30,000.00 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(100 mm width)
|
7.880 |
km |
500.00 |
3,940.00 |
425.00 |
3,349.00 |
525.00 |
4,137.00 |
|
|
| 713-07 |
temporary reflectorized raised pavement markers
|
96   |
ea |
6.00 |
576.00 |
5.00 |
480.00 |
7.00 |
672.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
3.5 |
hctr |
1,500.00 |
5,250.00 |
1,300.00 |
4,550.00 |
3,500.00 |
12,250.00 |
|
|
| 717-01 |
seeding
|
158   |
kg |
15.00 |
2,370.00 |
16.50 |
2,607.00 |
20.00 |
3,160.00 |
|
|
| 718-01 |
fertilizer
|
3,937   |
kg |
0.50 |
1,968.50 |
0.50 |
1,968.50 |
1.00 |
3,937.00 |
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
628   |
sq m |
1.45 |
910.60 |
2.50 |
1,570.00 |
4.00 |
2,512.00 |
|
|
| 722-01 |
project site laboratory
|
1   |
ea |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
15,000.00 |
15,000.00 |
|
|
| 725-04 |
low profile runaround
|
1   |
ea |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
30,000.00 |
30,000.00 |
|
|
| 726-01 |
bedding material
|
29.1 |
cu m |
75.00 |
2,182.50 |
100.00 |
2,910.00 |
100.00 |
2,910.00 |
|
|
| 727-01 |
mobilization
|
lump |
lump |
200,000.00 |
200,000.00 |
210,000.00 |
210,000.00 |
225,000.00 |
225,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
4   |
ea |
60.00 |
240.00 |
58.00 |
232.00 |
70.00 |
280.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
ea |
65.00 |
520.00 |
68.00 |
544.00 |
80.00 |
640.00 |
|
|
| 731-01 |
nonreflectorized raised pavement markers
|
132   |
ea |
10.00 |
1,320.00 |
9.50 |
1,254.00 |
15.00 |
1,980.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
138   |
ea |
6.00 |
828.00 |
5.00 |
690.00 |
10.00 |
1,380.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
3.940 |
km |
1,400.00 |
5,516.00 |
1,300.00 |
5,122.00 |
2,000.00 |
7,880.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
0.440 |
km |
600.00 |
264.00 |
500.00 |
220.00 |
1,000.00 |
440.00 |
|
|
| 740-01 |
construction layout
|
lump |
lump |
40,000.00 |
40,000.00 |
25,000.00 |
25,000.00 |
55,000.00 |
55,000.00 |
|
|
| 741-09 |
adjusting water house connections
|
1   |
each |
700.00 |
700.00 |
500.00 |
500.00 |
500.00 |
500.00 |
|
|
| 742-02 |
adjusting sanitary sewer house connections
|
1   |
each |
700.00 |
700.00 |
750.00 |
750.00 |
1,500.00 |
1,500.00 |
|
|
| 804-01-C |
precast concrete piles (400 mm)
|
1,745.0 |
ln m |
150.00 |
261,750.00 |
160.00 |
279,200.00 |
135.00 |
235,575.00 |
|
|
| 804-12 |
loading permanent piles
|
2   |
ea |
100.00 |
200.00 |
2,000.00 |
4,000.00 |
1.00 |
2.00 |
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
20.78 |
cu m |
925.00 |
19,221.50 |
1,100.00 |
22,858.00 |
1,400.00 |
29,092.00 |
|
|
| 805-01-F |
class a concrete (bents)
|
133.74 |
cu m |
730.00 |
97,630.20 |
700.00 |
93,618.00 |
800.00 |
106,992.00 |
|
|
| 805-03 |
class aa concrete
|
611.96 |
cu m |
500.00 |
305,980.00 |
500.00 |
305,980.00 |
650.00 |
397,774.00 |
|
|
| 805-12-E |
reinforced concrete box culverts (1200 mm x 1200 mm)
|
90.00 |
ln m |
800.00 |
72,000.00 |
1,000.00 |
90,000.00 |
820.00 |
73,800.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
74,598   |
kg |
1.75 |
130,546.50 |
1.50 |
111,897.00 |
1.65 |
123,086.70 |
|
|
| 810-01 |
concrete railing (barrier)
|
264.00 |
ln m |
230.00 |
60,720.00 |
125.00 |
33,000.00 |
150.00 |
39,600.00 |
|
|
| 813-01 |
concrete approach slabs
|
295.20 |
sq m |
160.00 |
47,232.00 |
180.00 |
53,136.00 |
225.00 |
66,420.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,175,250.20 |
|
2,327,642.40 |
|
2,561,421.91 |
|
|
|