Letting of 12/15/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 853-01-0010
Parish: TANGIPAHOA
Routes: LA 1054
Description: LA 1054 BRIDGES
Type Const: grading,lime trmt,class ii bc,drain struct,superpave acp, precast prestressed conc
girder spans bridge,conc slab span bridges and related work.
 
RankLicenseBidderAmount
100481 COASTAL BRIDGE CO., L.L.C. $4,395,887.49
236827 SHAVERS-WHITTLE CONSTRUCTION INC $4,682,424.94
325747 KOSTMAYER CONSTRUCTION, LLC $5,095,264.69
427492 GLYNN W. LEONARD, INC. $5,152,127.76
515288 GULF SOUTH PILING & CONST., INC. $5,164,329.44
602179 BOH BROS. CONSTRUCTION CO., LLC. $5,211,462.48
700755 L & A CONTRACTING CO. $5,267,569.58
834567 JAMES CONSTRUCTION GROUP LLC $6,012,302.27
 
Item Number Item Description Quantity Unit of Measure - 1 -
COASTAL BRIDGE CO., L.L.C.
- 2 -
SHAVERS-WHITTLE CONSTRUCTION INC
- 3 -
KOSTMAYER CONSTRUCTION, LLC
- 4 -
GLYNN W. LEONARD, INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 150,000.00 150,000.00 35,000.00 35,000.00 24,000.00 24,000.00 250,000.00 250,000.00
202-01 removal of structures & obstructions lump      lump 5,000.00 5,000.00 12,500.00 12,500.00 3,600.00 3,600.00 3,500.00 3,500.00
202-02-A-01 removal of bridge (sta. 10+177.6,8.5m x 47m timber
bridge w/timber piles)
1      ea 10,000.00 10,000.00 24,000.00 24,000.00 11,000.00 11,000.00 8,000.00 8,000.00
202-02-A-02 removal of bridge (sta. 10+554.3,8.5m x 31m timber
bridge w/timber piles)
1      ea 10,000.00 10,000.00 27,000.00 27,000.00 16,000.00 16,000.00 12,000.00 12,000.00
202-02-A-03 removal of bridge (sta. 10+964.5,8.5m x 69m timber
bridge w/timber piles)
1      ea 15,000.00 15,000.00 35,000.00 35,000.00 19,000.00 19,000.00 20,000.00 20,000.00
202-02-A-04 removal of bridge (sta. 11+209.5,8.5m x 12m timber
bridge w/timber piles)
1      ea 8,000.00 8,000.00 15,000.00 15,000.00 7,000.00 7,000.00 6,500.00 6,500.00
202-02-A-05 removal of bridge (sta. 11+127.9,7.9m x 12m timber
bridge w/ timber piles)
1      ea 7,000.00 7,000.00 14,000.00 14,000.00 7,000.00 7,000.00 6,500.00 6,500.00
202-02-A-06 removal of bridge (sta. 11+287.9,7.9m x 12m timber
bridge w/ timber piles)
1      ea 7,000.00 7,000.00 14,000.00 14,000.00 7,000.00 7,000.00 6,500.00 6,500.00
202-02-G removal of surfacing & stablizing base 10,187.0    sq m 7.50 76,402.50 6.50 66,215.50 9.00 91,683.00 8.00 81,496.00
203-01 general excavation 854      cu m 5.00 4,270.00 12.00 10,248.00 5.00 4,270.00 25.00 21,350.00
203-02 drainage excavation 20,989      cu m 5.00 104,945.00 8.50 178,406.50 10.00 209,890.00 11.88 249,349.32
203-04 embankment 35,398      cu m 9.00 318,582.00 13.50 477,873.00 14.00 495,572.00 13.60 481,412.80
204-02 temporary hay or straw bales 50      ea 8.00 400.00 5.00 250.00 10.00 500.00 10.00 500.00
204-05-A temporary sediment check dams (hay) 5      ea 225.00 1,125.00 125.00 625.00 110.00 550.00 250.00 1,250.00
204-06 temporary silt fencing 1,150      ln m 6.00 6,900.00 2.50 2,875.00 5.50 6,325.00 8.00 9,200.00
302-01 class ii base course (sand clay gravel, shell or sand
shell not allowed)
3,044.3    cu m 80.00 243,544.00 75.00 228,322.50 70.00 213,101.00 85.00 258,765.50
304-01 lime 176.33   Mg 10.00 1,763.30 125.00 22,041.25 162.00 28,565.46 155.00 27,331.15
304-04 lime treatment (type d) ( 300mm thick) 11,662      sq m 0.25 2,915.50 3.50 40,817.00 3.75 43,732.50 3.75 43,732.50
401-02 aggregate surface course (adjusted vehicular
measurement)
55      cu m 100.00 5,500.00 75.00 4,125.00 75.00 4,125.00 85.00 4,675.00
402-01 traffic maintenance aggregate (vehicular measurement) 100.0    cu m 50.00 5,000.00 65.00 6,500.00 70.00 7,000.00 85.00 8,500.00
502-01 superpave asphaltic concrete (level 1) 2,869.0    Mg 80.00 229,520.00 80.00 229,520.00 127.00 364,363.00 76.00 218,044.00
502-01-A superpave asphaltic concrete, paved drives and
turnouts
749.5    Mg 116.00 86,942.00 115.00 86,192.50 190.00 142,405.00 110.00 82,445.00
701-05-K side drain pipe (750 mm rcp) 29.8    ln m 325.00 9,685.00 100.00 2,980.00 140.00 4,172.00 90.00 2,682.00
702-06 side drain end treatment (type ii) 2      each 4,000.00 8,000.00 5,000.00 10,000.00 3,250.00 6,500.00 4,500.00 9,000.00
704-03 blocked out guard rail 519.48   ln m 58.00 30,129.84 58.00 30,129.84 63.00 32,727.24 57.50 29,870.10
704-08-B guard rail transitions (double thrie beam) 180.34   ln m 160.00 28,854.40 155.00 27,952.70 177.00 31,920.18 145.00 26,149.30
704-11-A guard rail end treatment(flared) 15      each 2,000.00 30,000.00 2,300.00 34,500.00 2,150.00 32,250.00 1,850.00 27,750.00
705-01 barbed wire fence 880      ln m 16.00 14,080.00 15.00 13,200.00 18.00 15,840.00 15.00 13,200.00
705-02 combination mesh & barbed wire fence 190      ln m 20.00 3,800.00 15.00 2,850.00 19.00 3,610.00 25.00 4,750.00
705-04 single swinging driveway gates 3      ea 300.00 900.00 300.00 900.00 600.00 1,800.00 400.00 1,200.00
708-01 right-of-way monument 22      ea 200.00 4,400.00 100.00 2,200.00 100.00 2,200.00 60.00 1,320.00
708-02 right-of-way monument witness post 22      ea 160.00 3,520.00 100.00 2,200.00 98.00 2,156.00 60.00 1,320.00
712-04 flexible revetment 4,008      sq m 45.00 180,360.00 45.00 180,360.00 33.10 132,664.80 52.00 208,416.00
713-01 temporary signs & barricades lump      lump 75,000.00 75,000.00 30,000.00 30,000.00 18,000.00 18,000.00 45,000.00 45,000.00
717-01 seeding 164      kg 20.00 3,280.00 40.00 6,560.00 12.00 1,968.00 20.00 3,280.00
718-01 fertilizer 5,416      kg 1.00 5,416.00 0.50 2,708.00 0.50 2,708.00 1.50 8,124.00
727-01 mobilization lump      lump 265,000.00 265,000.00 145,000.00 145,000.00 325,000.00 325,000.00 400,000.00 400,000.00
729-16 object marker assembly 24      ea 80.00 1,920.00 90.00 2,160.00 80.00 1,920.00 75.00 1,800.00
731-01 non-reflectorized raised pavement markers 390      ea 10.00 3,900.00 11.00 4,290.00 12.00 4,680.00 10.00 3,900.00
731-02 reflectorized raised pavement markers 204      ea 6.00 1,224.00 6.50 1,326.00 7.00 1,428.00 8.00 1,632.00
732-02-A plastic pavement striping (solid line)(100 mm width) 3.069  km 1,200.00 3,682.80 1,350.00 4,143.15 1,400.00 4,296.60 2,200.00 6,751.80
732-03-A plastic pavement striping (broken line)(100 mm width) 1.440  km 500.00 720.00 625.00 900.00 605.00 871.20 1,500.00 2,160.00
740-01 construction layout lump      lump 80,000.00 80,000.00 75,000.00 75,000.00 46,000.00 46,000.00 160,000.00 160,000.00
804-01-B precast concrete piles (350 mm) 60.0    ln m 125.00 7,500.00 124.00 7,440.00 143.00 8,580.00 103.77 6,226.20
804-01-C precast concrete piles (400 mm) 3,830.0    ln m 117.00 448,110.00 115.00 440,450.00 159.00 608,970.00 110.56 423,444.80
804-01-D precast concrete piles (450 mm) 500.0    ln m 136.00 68,000.00 135.00 67,500.00 200.00 100,000.00 145.37 72,685.00
804-01-F precast concrete piles (600 mm) 406.0    ln m 217.00 88,102.00 375.00 152,250.00 303.00 123,018.00 327.63 133,017.78
804-12 loading permanent piles 6      ea 100.00 600.00 500.00 3,000.00 120.00 720.00 10,000.00 60,000.00
805-01-F class a concrete (bents) 287.02   cu m 900.00 258,318.00 1,000.00 287,020.00 700.00 200,914.00 725.00 208,089.50
805-03 class aa concrete 1,123.03   cu m 560.00 628,896.80 600.00 673,818.00 600.00 673,818.00 575.00 645,742.25
805-08-C precast-prestressed concrete girders (type iii) 563.85   ln m 275.00 155,058.75 260.00 146,601.00 390.00 219,901.50 346.86 195,577.01
805-11 strip seal joints 25.60   ln m 400.00 10,240.00 450.00 11,520.00 410.00 10,496.00 35.00 896.00
806-01 deformed reinforcing steel 166,733      kg 1.60 266,772.80 2.00 333,466.00 2.37 395,157.21 1.75 291,782.75
807-06 structural metalwork lump      lump 7,000.00 7,000.00 15,000.00 15,000.00 2,600.00 2,600.00 10,000.00 10,000.00
810-01 concrete railing (barrier) 568.00   ln m 140.00 79,520.00 250.00 142,000.00 155.00 88,040.00 140.00 79,520.00
813-01 concrete approach slabs 1,766.60   sq m 183.00 323,287.80 165.00 291,489.00 160.00 282,656.00 150.00 264,990.00
S-101 special anchor section 1      ea 800.00 800.00 1,000.00 1,000.00 1,000.00 1,000.00 800.00 800.00
                       
 CONTRACTOR TOTAL       4,395,887.49   4,682,424.94   5,095,264.69   5,152,127.76
 
Item Number Item Description Quantity Unit of Measure - 5 -
GULF SOUTH PILING & CONST., INC.
- 6 -
BOH BROS. CONSTRUCTION CO., LLC.
- 7 -
L & A CONTRACTING CO.
- 8 -
JAMES CONSTRUCTION GROUP LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 100,000.00 100,000.00 50,000.00 50,000.00 300,000.00 300,000.00 250,000.00 250,000.00
202-01 removal of structures & obstructions lump      lump 25,000.00 25,000.00 20,000.00 20,000.00 12,000.00 12,000.00 10,000.00 10,000.00
202-02-A-01 removal of bridge (sta. 10+177.6,8.5m x 47m timber
bridge w/timber piles)
1      ea 20,000.00 20,000.00 15,000.00 15,000.00 7,000.00 7,000.00 15,000.00 15,000.00
202-02-A-02 removal of bridge (sta. 10+554.3,8.5m x 31m timber
bridge w/timber piles)
1      ea 15,000.00 15,000.00 15,000.00 15,000.00 7,000.00 7,000.00 10,000.00 10,000.00
202-02-A-03 removal of bridge (sta. 10+964.5,8.5m x 69m timber
bridge w/timber piles)
1      ea 25,000.00 25,000.00 25,000.00 25,000.00 20,000.00 20,000.00 20,000.00 20,000.00
202-02-A-04 removal of bridge (sta. 11+209.5,8.5m x 12m timber
bridge w/timber piles)
1      ea 12,000.00 12,000.00 15,000.00 15,000.00 5,000.00 5,000.00 7,000.00 7,000.00
202-02-A-05 removal of bridge (sta. 11+127.9,7.9m x 12m timber
bridge w/ timber piles)
1      ea 12,000.00 12,000.00 15,000.00 15,000.00 5,000.00 5,000.00 6,000.00 6,000.00
202-02-A-06 removal of bridge (sta. 11+287.9,7.9m x 12m timber
bridge w/ timber piles)
1      ea 12,000.00 12,000.00 15,000.00 15,000.00 5,000.00 5,000.00 6,000.00 6,000.00
202-02-G removal of surfacing & stablizing base 10,187.0    sq m 7.25 73,855.75 6.20 63,159.40 5.00 50,935.00 7.50 76,402.50
203-01 general excavation 854      cu m 10.50 8,967.00 9.20 7,856.80 3.00 2,562.00 15.00 12,810.00
203-02 drainage excavation 20,989      cu m 10.00 209,890.00 10.40 218,285.60 4.00 83,956.00 10.00 209,890.00
203-04 embankment 35,398      cu m 20.00 707,960.00 20.83 737,340.34 17.00 601,766.00 19.50 690,261.00
204-02 temporary hay or straw bales 50      ea 6.00 300.00 8.60 430.00 8.80 440.00 8.00 400.00
204-05-A temporary sediment check dams (hay) 5      ea 160.00 800.00 160.00 800.00 137.50 687.50 125.00 625.00
204-06 temporary silt fencing 1,150      ln m 3.50 4,025.00 3.63 4,174.50 6.00 6,900.00 3.50 4,025.00
302-01 class ii base course (sand clay gravel, shell or sand
shell not allowed)
3,044.3    cu m 88.00 267,898.40 72.35 220,255.10 93.00 283,119.90 80.00 243,544.00
304-01 lime 176.33   Mg 140.00 24,686.20 143.00 25,215.19 110.00 19,396.30 145.00 25,567.85
304-04 lime treatment (type d) ( 300mm thick) 11,662      sq m 3.00 34,986.00 1.20 13,994.40 1.40 16,326.80 3.00 34,986.00
401-02 aggregate surface course (adjusted vehicular
measurement)
55      cu m 65.00 3,575.00 75.00 4,125.00 74.40 4,092.00 100.00 5,500.00
402-01 traffic maintenance aggregate (vehicular measurement) 100.0    cu m 65.00 6,500.00 73.00 7,300.00 38.50 3,850.00 60.00 6,000.00
502-01 superpave asphaltic concrete (level 1) 2,869.0    Mg 100.00 286,900.00 88.40 253,619.60 104.50 299,810.50 76.00 218,044.00
502-01-A superpave asphaltic concrete, paved drives and
turnouts
749.5    Mg 125.00 93,687.50 116.30 87,166.85 133.10 99,758.45 110.00 82,445.00
701-05-K side drain pipe (750 mm rcp) 29.8    ln m 90.00 2,682.00 109.00 3,248.20 262.35 7,818.03 280.00 8,344.00
702-06 side drain end treatment (type ii) 2      each 4,750.00 9,500.00 3,300.00 6,600.00 3,410.00 6,820.00 4,500.00 9,000.00
704-03 blocked out guard rail 519.48   ln m 58.00 30,129.84 60.40 31,376.59 58.30 30,285.68 60.00 31,168.80
704-08-B guard rail transitions (double thrie beam) 180.34   ln m 145.00 26,149.30 152.40 27,483.81 161.70 29,160.97 140.00 25,247.60
704-11-A guard rail end treatment(flared) 15      each 1,800.00 27,000.00 1,950.00 29,250.00 2,035.00 30,525.00 2,000.00 30,000.00
705-01 barbed wire fence 880      ln m 16.00 14,080.00 15.75 13,860.00 16.50 14,520.00 15.00 13,200.00
705-02 combination mesh & barbed wire fence 190      ln m 15.00 2,850.00 14.70 2,793.00 15.40 2,926.00 14.00 2,660.00
705-04 single swinging driveway gates 3      ea 260.00 780.00 300.00 900.00 275.00 825.00 250.00 750.00
708-01 right-of-way monument 22      ea 150.00 3,300.00 600.00 13,200.00 253.50 5,577.00 200.00 4,400.00
708-02 right-of-way monument witness post 22      ea 150.00 3,300.00 20.00 440.00 84.50 1,859.00 200.00 4,400.00
712-04 flexible revetment 4,008      sq m 50.00 200,400.00 44.70 179,157.60 66.00 264,528.00 44.00 176,352.00
713-01 temporary signs & barricades lump      lump 100,000.00 100,000.00 34,500.00 34,500.00 50,000.00 50,000.00 75,000.00 75,000.00
717-01 seeding 164      kg 14.00 2,296.00 15.10 2,476.40 15.76 2,584.64 15.00 2,460.00
718-01 fertilizer 5,416      kg 0.45 2,437.20 0.45 2,437.20 0.50 2,708.00 0.42 2,274.72
727-01 mobilization lump      lump 450,000.00 450,000.00 497,000.00 497,000.00 525,000.00 525,000.00 575,000.00 575,000.00
729-16 object marker assembly 24      ea 70.00 1,680.00 75.00 1,800.00 77.00 1,848.00 70.00 1,680.00
731-01 non-reflectorized raised pavement markers 390      ea 9.00 3,510.00 9.45 3,685.50 10.00 3,900.00 9.00 3,510.00
731-02 reflectorized raised pavement markers 204      ea 5.00 1,020.00 5.25 1,071.00 5.50 1,122.00 5.00 1,020.00
732-02-A plastic pavement striping (solid line)(100 mm width) 3.069  km 1,200.00 3,682.80 1,180.00 3,621.42 1,232.00 3,781.00 1,200.00 3,682.80
732-03-A plastic pavement striping (broken line)(100 mm width) 1.440  km 500.00 720.00 520.00 748.80 545.00 784.80 500.00 720.00
740-01 construction layout lump      lump 100,000.00 100,000.00 155,000.00 155,000.00 250,000.00 250,000.00 100,000.00 100,000.00
804-01-B precast concrete piles (350 mm) 60.0    ln m 150.00 9,000.00 110.45 6,627.00 162.50 9,750.00 160.00 9,600.00
804-01-C precast concrete piles (400 mm) 3,830.0    ln m 100.00 383,000.00 120.30 460,749.00 110.23 422,180.90 170.00 651,100.00
804-01-D precast concrete piles (450 mm) 500.0    ln m 145.00 72,500.00 153.00 76,500.00 137.36 68,680.00 180.00 90,000.00
804-01-F precast concrete piles (600 mm) 406.0    ln m 250.00 101,500.00 363.65 147,641.90 201.56 81,833.36 250.00 101,500.00
804-12 loading permanent piles 6      ea 1,500.00 9,000.00 5,000.00 30,000.00 8,300.00 49,800.00 4,000.00 24,000.00
805-01-F class a concrete (bents) 287.02   cu m 850.00 243,967.00 800.00 229,616.00 375.00 107,632.50 1,100.00 315,722.00
805-03 class aa concrete 1,123.03   cu m 550.00 617,666.50 580.00 651,357.40 575.00 645,742.25 800.00 898,424.00
805-08-C precast-prestressed concrete girders (type iii) 563.85   ln m 250.00 140,962.50 253.45 142,907.78 301.47 169,983.85 300.00 169,155.00
805-11 strip seal joints 25.60   ln m 400.00 10,240.00 366.00 9,369.60 300.00 7,680.00 350.00 8,960.00
806-01 deformed reinforcing steel 166,733      kg 1.65 275,109.45 1.58 263,438.14 1.55 258,436.15 2.00 333,466.00
807-06 structural metalwork lump      lump 10,000.00 10,000.00 2,700.00 2,700.00 2,000.00 2,000.00 10,000.00 10,000.00
810-01 concrete railing (barrier) 568.00   ln m 135.00 76,680.00 134.45 76,367.60 141.00 80,088.00 150.00 85,200.00
813-01 concrete approach slabs 1,766.60   sq m 160.00 282,656.00 163.60 289,015.76 165.00 291,489.00 175.00 309,155.00
S-101 special anchor section 1      ea 1,500.00 1,500.00 800.00 800.00 1,100.00 1,100.00 650.00 650.00
                       
 CONTRACTOR TOTAL       5,164,329.44   5,211,462.48   5,267,569.58   6,012,302.27