| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - HUEY STOCKSTILL, INC. |
- 3 - BOH BROS. CONSTRUCTION CO., LLC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
216   |
LNFT |
3.50 |
756.00 |
5.00 |
1,080.00 |
5.50 |
1,188.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
300   |
CUYD |
5.00 |
1,500.00 |
5.50 |
1,650.00 |
7.00 |
2,100.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
250   |
CUYD |
10.00 |
2,500.00 |
19.00 |
4,750.00 |
10.00 |
2,500.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
4,614.2 |
TON |
46.00 |
212,253.20 |
45.00 |
207,639.00 |
57.00 |
263,009.40 |
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
100.0 |
TON |
100.00 |
10,000.00 |
90.00 |
9,000.00 |
90.00 |
9,000.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
33,088   |
SQYD |
0.50 |
16,544.00 |
1.00 |
33,088.00 |
0.50 |
16,544.00 |
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
54.0 |
LNFT |
35.00 |
1,890.00 |
30.00 |
1,620.00 |
32.00 |
1,728.00 |
|
|
| 704-03 |
blocked out guard rail
|
62.5 |
LNFT |
25.00 |
1,562.50 |
16.00 |
1,000.00 |
17.00 |
1,062.50 |
|
|
| 704-06-A |
guard rail anchor sections (trailing end) (single
thrie beam) |
12.6 |
LNFT |
80.00 |
1,008.00 |
70.00 |
882.00 |
75.00 |
945.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
2   |
EACH |
2,000.00 |
4,000.00 |
1,900.00 |
3,800.00 |
2,000.00 |
4,000.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
14,000.00 |
14,000.00 |
15,000.00 |
15,000.00 |
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
72   |
LNFT |
0.10 |
7.20 |
1.00 |
72.00 |
1.00 |
72.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
7.050 |
MILE |
5.00 |
35.25 |
200.00 |
1,410.00 |
10.00 |
70.50 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
7.050 |
MILE |
5.00 |
35.25 |
10.00 |
70.50 |
15.00 |
105.75 |
|
|
| 713-05-A |
temporary pavement markings(solid line)(4" width)
|
14.100 |
MILE |
10.00 |
141.00 |
20.00 |
282.00 |
20.00 |
282.00 |
|
|
| 713-06-D |
temporary pavement legends and symbols (rr crossing)
|
4   |
EACH |
300.00 |
1,200.00 |
200.00 |
800.00 |
50.00 |
200.00 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
520   |
SQYD |
53.00 |
27,560.00 |
50.00 |
26,000.00 |
75.00 |
39,000.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
25,000.00 |
25,000.00 |
33,000.00 |
33,000.00 |
40,000.00 |
40,000.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
310   |
EACH |
6.00 |
1,860.00 |
6.00 |
1,860.00 |
6.00 |
1,860.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
72   |
LNFT |
3.00 |
216.00 |
4.00 |
288.00 |
3.75 |
270.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
4.700 |
MILE |
2,000.00 |
9,400.00 |
2,500.00 |
11,750.00 |
1,900.00 |
8,930.00 |
|
|
| 732-03-A |
plastic pavement striping(broken line)(4" width)
|
2.350 |
MILE |
800.00 |
1,880.00 |
700.00 |
1,645.00 |
850.00 |
1,997.50 |
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
2   |
EACH |
475.00 |
950.00 |
500.00 |
1,000.00 |
550.00 |
1,100.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
3,000.00 |
3,000.00 |
2,000.00 |
2,000.00 |
1,000.00 |
1,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
333,298.40 |
|
358,686.50 |
|
411,964.65 |
|
|
|