Lead Project: 845-21-0003
Parish: ST CHARLES
Routes: LA 3160
Description: JCT LA 3127 - JCT LA 18
Type Const: grading, cold planing asphaltic concrete, superpave asphaltic concrete overlay,
pavement patching, and related work.
 
RankLicenseBidderAmount
106276 BARRIERE CONSTRUCTION CO., LLC $333,298.40
206487 HUEY STOCKSTILL, INC. $358,686.50
302179 BOH BROS. CONSTRUCTION CO., LLC. $411,964.65
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC
- 2 -
HUEY STOCKSTILL, INC.
- 3 -
BOH BROS. CONSTRUCTION CO., LLC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 216      LNFT 3.50 756.00 5.00 1,080.00 5.50 1,188.00    
203-08 borrow (vehicular measurement) 300      CUYD 5.00 1,500.00 5.50 1,650.00 7.00 2,100.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
250      CUYD 10.00 2,500.00 19.00 4,750.00 10.00 2,500.00    
502-01 superpave asphaltic concrete 4,614.2    TON 46.00 212,253.20 45.00 207,639.00 57.00 263,009.40    
502-01-A superpave asphaltic concrete, paved drives and
turnouts
100.0    TON 100.00 10,000.00 90.00 9,000.00 90.00 9,000.00    
509-01 cold planing asphaltic pavement 33,088      SQYD 0.50 16,544.00 1.00 33,088.00 0.50 16,544.00    
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 54.0    LNFT 35.00 1,890.00 30.00 1,620.00 32.00 1,728.00    
704-03 blocked out guard rail 62.5    LNFT 25.00 1,562.50 16.00 1,000.00 17.00 1,062.50    
704-06-A guard rail anchor sections (trailing end) (single
thrie beam)
12.6    LNFT 80.00 1,008.00 70.00 882.00 75.00 945.00    
704-11-A guard rail end treatment (flared) 2      EACH 2,000.00 4,000.00 1,900.00 3,800.00 2,000.00 4,000.00    
713-01 temporary signs & barricades lump      LUMP 10,000.00 10,000.00 14,000.00 14,000.00 15,000.00 15,000.00    
713-03-E temporary pavement markings (24" width) 72      LNFT 0.10 7.20 1.00 72.00 1.00 72.00    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
7.050  MILE 5.00 35.25 200.00 1,410.00 10.00 70.50    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
7.050  MILE 5.00 35.25 10.00 70.50 15.00 105.75    
713-05-A temporary pavement markings(solid line)(4" width) 14.100  MILE 10.00 141.00 20.00 282.00 20.00 282.00    
713-06-D temporary pavement legends and symbols (rr crossing) 4      EACH 300.00 1,200.00 200.00 800.00 50.00 200.00    
724-01-B pavement patching (12" minimum thickness) 520      SQYD 53.00 27,560.00 50.00 26,000.00 75.00 39,000.00    
727-01 mobilization lump      LUMP 25,000.00 25,000.00 33,000.00 33,000.00 40,000.00 40,000.00    
731-02 reflectorized raised pavement markers 310      EACH 6.00 1,860.00 6.00 1,860.00 6.00 1,860.00    
732-01-E plastic pavement striping (24" width) 72      LNFT 3.00 216.00 4.00 288.00 3.75 270.00    
732-02-A plastic pavement striping (solid line) (4" width) 4.700  MILE 2,000.00 9,400.00 2,500.00 11,750.00 1,900.00 8,930.00    
732-03-A plastic pavement striping(broken line)(4" width) 2.350  MILE 800.00 1,880.00 700.00 1,645.00 850.00 1,997.50    
732-04-D plastic pavement legends & symbols (rr crossing) 2      EACH 475.00 950.00 500.00 1,000.00 550.00 1,100.00    
740-01 construction layout lump      LUMP 3,000.00 3,000.00 2,000.00 2,000.00 1,000.00 1,000.00    
                       
 CONTRACTOR TOTAL       333,298.40   358,686.50   411,964.65    