| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - COASTAL BRIDGE CO., L.L.C. |
- 2 - BARBER BROS. CONTRACTING CO., L.L.C |
- 3 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 4 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-I |
removal of concrete chain wall
|
78   |
LNFT |
1.00 |
78.00 |
50.00 |
3,900.00 |
4.10 |
319.80 |
50.00 |
3,900.00 |
| 203-08 |
borrow (vehicular measurement)
|
3,200   |
CUYD |
0.01 |
32.00 |
10.00 |
32,000.00 |
10.00 |
32,000.00 |
14.00 |
44,800.00 |
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
1,884   |
CUYD |
0.01 |
18.84 |
10.00 |
18,840.00 |
10.00 |
18,840.00 |
10.00 |
18,840.00 |
| 204-06 |
temporary silt fencing
|
7,286   |
LNFT |
1.50 |
10,929.00 |
1.50 |
10,929.00 |
1.00 |
7,286.00 |
1.00 |
7,286.00 |
| 303-02 |
removal of existing patches
|
260   |
SQYD |
1.00 |
260.00 |
15.00 |
3,900.00 |
13.50 |
3,510.00 |
10.00 |
2,600.00 |
| 502-01 |
superpave asphaltic concrete
|
15,085.5 |
TON |
48.00 |
724,104.00 |
45.00 |
678,847.50 |
46.30 |
698,458.65 |
45.00 |
678,847.50 |
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
714.2 |
TON |
1.00 |
714.20 |
60.00 |
42,852.00 |
95.85 |
68,456.07 |
80.00 |
57,136.00 |
| 502-01-B |
superpave asphaltic concrete, spot locations
|
279.1 |
TON |
60.00 |
16,746.00 |
100.00 |
27,910.00 |
120.00 |
33,492.00 |
80.00 |
22,328.00 |
| 509-01 |
cold planing asphaltic pavement
|
3,236   |
SQYD |
3.45 |
11,164.20 |
5.00 |
16,180.00 |
7.00 |
22,652.00 |
10.00 |
32,360.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 135   |
CUYD |
0.01 |
- 1.35 |
FREE |
FREE |
0.10 |
- 13.50 |
0.10 |
- 13.50 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
17,500.00 |
17,500.00 |
30,000.00 |
30,000.00 |
5,200.00 |
5,200.00 |
49,000.00 |
49,000.00 |
| 713-03-E |
temporary pavement markings (24" width)
|
36   |
LNFT |
0.90 |
32.40 |
1.00 |
36.00 |
0.62 |
22.32 |
0.35 |
12.60 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
12.900 |
MILE |
1.00 |
12.90 |
325.00 |
4,192.50 |
130.00 |
1,677.00 |
400.00 |
5,160.00 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
6.780 |
MILE |
1.00 |
6.78 |
300.00 |
2,034.00 |
205.00 |
1,389.90 |
100.00 |
678.00 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
43.950 |
MILE |
1.00 |
43.95 |
300.00 |
13,185.00 |
410.00 |
18,019.50 |
10.00 |
439.50 |
| 717-01 |
seeding
|
156   |
LB |
6.50 |
1,014.00 |
8.00 |
1,248.00 |
6.15 |
959.40 |
8.00 |
1,248.00 |
| 718-01 |
fertilizer
|
5,210   |
LB |
0.25 |
1,302.50 |
0.30 |
1,563.00 |
0.18 |
937.80 |
0.25 |
1,302.50 |
| 721-01 |
asphalt mulch
|
12,614   |
GAL |
1.40 |
17,659.60 |
1.55 |
19,551.70 |
1.03 |
12,992.42 |
0.50 |
6,307.00 |
| 722-01 |
project site laboratory
|
1   |
EACH |
2,500.00 |
2,500.00 |
7,500.00 |
7,500.00 |
3,500.00 |
3,500.00 |
1,000.00 |
1,000.00 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
145   |
SQYD |
45.00 |
6,525.00 |
75.00 |
10,875.00 |
73.50 |
10,657.50 |
70.00 |
10,150.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
110,000.00 |
110,000.00 |
24,000.00 |
24,000.00 |
27,500.00 |
27,500.00 |
51,000.00 |
51,000.00 |
| 731-02 |
reflectorized raised pavement markers
|
569   |
EACH |
4.95 |
2,816.55 |
5.00 |
2,845.00 |
5.00 |
2,845.00 |
6.00 |
3,414.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
12   |
LNFT |
2.75 |
33.00 |
5.00 |
60.00 |
2.50 |
30.00 |
5.00 |
60.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
15.377 |
MILE |
1,800.00 |
27,678.60 |
2,000.00 |
30,754.00 |
1,750.00 |
26,909.75 |
2,000.00 |
30,754.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.381 |
MILE |
800.00 |
1,904.80 |
900.00 |
2,142.90 |
670.00 |
1,595.27 |
1,000.00 |
2,381.00 |
| 735-01 |
mailboxes
|
214   |
EACH |
1.00 |
214.00 |
2.00 |
428.00 |
1.00 |
214.00 |
2.00 |
428.00 |
| 735-02 |
mailbox supports (single)
|
214   |
EACH |
125.00 |
26,750.00 |
105.00 |
22,470.00 |
100.00 |
21,400.00 |
135.00 |
28,890.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
25,000.00 |
25,000.00 |
20,000.00 |
20,000.00 |
45,000.00 |
45,000.00 |
| S-001 |
cement treated base course (12 in depth)
|
68,112   |
SQYD |
4.15 |
282,664.80 |
4.50 |
306,504.00 |
4.56 |
310,590.72 |
5.25 |
357,588.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,272,703.77 |
|
1,339,747.60 |
|
1,351,441.60 |
|
1,462,896.60 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - BARRIERE CONSTRUCTION CO., LLC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-I |
removal of concrete chain wall
|
78   |
LNFT |
60.00 |
4,680.00 |
|
|
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
3,200   |
CUYD |
11.00 |
35,200.00 |
|
|
|
|
|
|
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
1,884   |
CUYD |
12.00 |
22,608.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
7,286   |
LNFT |
1.30 |
9,471.80 |
|
|
|
|
|
|
| 303-02 |
removal of existing patches
|
260   |
SQYD |
1.00 |
260.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
15,085.5 |
TON |
51.00 |
769,360.50 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
714.2 |
TON |
100.00 |
71,420.00 |
|
|
|
|
|
|
| 502-01-B |
superpave asphaltic concrete, spot locations
|
279.1 |
TON |
160.00 |
44,656.00 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
3,236   |
SQYD |
9.00 |
29,124.00 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 135   |
CUYD |
0.10 |
- 13.50 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
36   |
LNFT |
1.00 |
36.00 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
12.900 |
MILE |
140.00 |
1,806.00 |
|
|
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
6.780 |
MILE |
40.00 |
271.20 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
43.950 |
MILE |
60.00 |
2,637.00 |
|
|
|
|
|
|
| 717-01 |
seeding
|
156   |
LB |
28.00 |
4,368.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
5,210   |
LB |
0.60 |
3,126.00 |
|
|
|
|
|
|
| 721-01 |
asphalt mulch
|
12,614   |
GAL |
0.30 |
3,784.20 |
|
|
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
145   |
SQYD |
76.00 |
11,020.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
90,000.00 |
90,000.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
569   |
EACH |
5.30 |
3,015.70 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
12   |
LNFT |
3.00 |
36.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
15.377 |
MILE |
1,900.00 |
29,216.30 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.381 |
MILE |
900.00 |
2,142.90 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
214   |
EACH |
2.00 |
428.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
214   |
EACH |
100.00 |
21,400.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
13,000.00 |
13,000.00 |
|
|
|
|
|
|
| S-001 |
cement treated base course (12 in depth)
|
68,112   |
SQYD |
5.30 |
360,993.60 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,555,047.70 |
|
|
|
|
|
|
|