Lead Project: 832-02-0020
Parish: LIVINGSTON
Routes: LA 1019
Description: JCT LA 16 - JCT LA 63
Type Const: cold planing aspahltic pavement, cement treated base course, superpave asphaltic
concrete overlay, and related work.
 
RankLicenseBidderAmount
100481 COASTAL BRIDGE CO., L.L.C. $1,272,703.77
200046 BARBER BROS. CONTRACTING CO., L.L.C $1,339,747.60
312487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,351,441.60
400849 F.G. SULLIVAN, JR. CONTRACTOR LLC $1,462,896.60
506276 BARRIERE CONSTRUCTION CO., LLC. $1,555,047.70
 
Item Number Item Description Quantity Unit of Measure - 1 -
COASTAL BRIDGE CO., L.L.C.
- 2 -
BARBER BROS. CONTRACTING CO., L.L.C
- 3 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 4 -
F.G. SULLIVAN, JR. CONTRACTOR LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-I removal of concrete chain wall 78      LNFT 1.00 78.00 50.00 3,900.00 4.10 319.80 50.00 3,900.00
203-08 borrow (vehicular measurement) 3,200      CUYD 0.01 32.00 10.00 32,000.00 10.00 32,000.00 14.00 44,800.00
203-08-A borrow (vehicular meas.)(selected soils) 1,884      CUYD 0.01 18.84 10.00 18,840.00 10.00 18,840.00 10.00 18,840.00
204-06 temporary silt fencing 7,286      LNFT 1.50 10,929.00 1.50 10,929.00 1.00 7,286.00 1.00 7,286.00
303-02 removal of existing patches 260      SQYD 1.00 260.00 15.00 3,900.00 13.50 3,510.00 10.00 2,600.00
502-01 superpave asphaltic concrete 15,085.5    TON 48.00 724,104.00 45.00 678,847.50 46.30 698,458.65 45.00 678,847.50
502-01-A superpave asphaltic concrete, paved drives and
turnouts
714.2    TON 1.00 714.20 60.00 42,852.00 95.85 68,456.07 80.00 57,136.00
502-01-B superpave asphaltic concrete, spot locations 279.1    TON 60.00 16,746.00 100.00 27,910.00 120.00 33,492.00 80.00 22,328.00
509-01 cold planing asphaltic pavement 3,236      SQYD 3.45 11,164.20 5.00 16,180.00 7.00 22,652.00 10.00 32,360.00
509-02 contractor retained reclaimed asphaltic pavement - 135      CUYD 0.01 - 1.35 FREE FREE 0.10 - 13.50 0.10 - 13.50
713-01 temporary signs & barricades lump      LUMP 17,500.00 17,500.00 30,000.00 30,000.00 5,200.00 5,200.00 49,000.00 49,000.00
713-03-E temporary pavement markings (24" width) 36      LNFT 0.90 32.40 1.00 36.00 0.62 22.32 0.35 12.60
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
12.900  MILE 1.00 12.90 325.00 4,192.50 130.00 1,677.00 400.00 5,160.00
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
6.780  MILE 1.00 6.78 300.00 2,034.00 205.00 1,389.90 100.00 678.00
713-05-A temporary pavement markings (solid line)(4" width) 43.950  MILE 1.00 43.95 300.00 13,185.00 410.00 18,019.50 10.00 439.50
717-01 seeding 156      LB 6.50 1,014.00 8.00 1,248.00 6.15 959.40 8.00 1,248.00
718-01 fertilizer 5,210      LB 0.25 1,302.50 0.30 1,563.00 0.18 937.80 0.25 1,302.50
721-01 asphalt mulch 12,614      GAL 1.40 17,659.60 1.55 19,551.70 1.03 12,992.42 0.50 6,307.00
722-01 project site laboratory 1      EACH 2,500.00 2,500.00 7,500.00 7,500.00 3,500.00 3,500.00 1,000.00 1,000.00
724-01-B pavement patching (12" minimum thickness) 145      SQYD 45.00 6,525.00 75.00 10,875.00 73.50 10,657.50 70.00 10,150.00
727-01 mobilization lump      LUMP 110,000.00 110,000.00 24,000.00 24,000.00 27,500.00 27,500.00 51,000.00 51,000.00
731-02 reflectorized raised pavement markers 569      EACH 4.95 2,816.55 5.00 2,845.00 5.00 2,845.00 6.00 3,414.00
732-01-E plastic pavement striping (24" width) 12      LNFT 2.75 33.00 5.00 60.00 2.50 30.00 5.00 60.00
732-02-A plastic pavement striping (solid line) (4" width) 15.377  MILE 1,800.00 27,678.60 2,000.00 30,754.00 1,750.00 26,909.75 2,000.00 30,754.00
732-03-A plastic pavement striping (broken line)(4" width) 2.381  MILE 800.00 1,904.80 900.00 2,142.90 670.00 1,595.27 1,000.00 2,381.00
735-01 mailboxes 214      EACH 1.00 214.00 2.00 428.00 1.00 214.00 2.00 428.00
735-02 mailbox supports (single) 214      EACH 125.00 26,750.00 105.00 22,470.00 100.00 21,400.00 135.00 28,890.00
740-01 construction layout lump      LUMP 10,000.00 10,000.00 25,000.00 25,000.00 20,000.00 20,000.00 45,000.00 45,000.00
S-001 cement treated base course (12 in depth) 68,112      SQYD 4.15 282,664.80 4.50 306,504.00 4.56 310,590.72 5.25 357,588.00
                       
 CONTRACTOR TOTAL       1,272,703.77   1,339,747.60   1,351,441.60   1,462,896.60
 
Item Number Item Description Quantity Unit of Measure - 5 -
BARRIERE CONSTRUCTION CO., LLC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-I removal of concrete chain wall 78      LNFT 60.00 4,680.00            
203-08 borrow (vehicular measurement) 3,200      CUYD 11.00 35,200.00            
203-08-A borrow (vehicular meas.)(selected soils) 1,884      CUYD 12.00 22,608.00            
204-06 temporary silt fencing 7,286      LNFT 1.30 9,471.80            
303-02 removal of existing patches 260      SQYD 1.00 260.00            
502-01 superpave asphaltic concrete 15,085.5    TON 51.00 769,360.50            
502-01-A superpave asphaltic concrete, paved drives and
turnouts
714.2    TON 100.00 71,420.00            
502-01-B superpave asphaltic concrete, spot locations 279.1    TON 160.00 44,656.00            
509-01 cold planing asphaltic pavement 3,236      SQYD 9.00 29,124.00            
509-02 contractor retained reclaimed asphaltic pavement - 135      CUYD 0.10 - 13.50            
713-01 temporary signs & barricades lump      LUMP 20,000.00 20,000.00            
713-03-E temporary pavement markings (24" width) 36      LNFT 1.00 36.00            
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
12.900  MILE 140.00 1,806.00            
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
6.780  MILE 40.00 271.20            
713-05-A temporary pavement markings (solid line)(4" width) 43.950  MILE 60.00 2,637.00            
717-01 seeding 156      LB 28.00 4,368.00            
718-01 fertilizer 5,210      LB 0.60 3,126.00            
721-01 asphalt mulch 12,614      GAL 0.30 3,784.20            
722-01 project site laboratory 1      EACH 1,000.00 1,000.00            
724-01-B pavement patching (12" minimum thickness) 145      SQYD 76.00 11,020.00            
727-01 mobilization lump      LUMP 90,000.00 90,000.00            
731-02 reflectorized raised pavement markers 569      EACH 5.30 3,015.70            
732-01-E plastic pavement striping (24" width) 12      LNFT 3.00 36.00            
732-02-A plastic pavement striping (solid line) (4" width) 15.377  MILE 1,900.00 29,216.30            
732-03-A plastic pavement striping (broken line)(4" width) 2.381  MILE 900.00 2,142.90            
735-01 mailboxes 214      EACH 2.00 428.00            
735-02 mailbox supports (single) 214      EACH 100.00 21,400.00            
740-01 construction layout lump      LUMP 13,000.00 13,000.00            
S-001 cement treated base course (12 in depth) 68,112      SQYD 5.30 360,993.60            
                       
 CONTRACTOR TOTAL       1,555,047.70            