Lead Project: 811-09-0010
Parish: CALDWELL, LASALLE
Routes: LA 843
Description: LASALLEPARISHLINE-JCT. US 165 JCT.LA124-CALDWELL PARISH LINE
Type Const: cement treated base course, cold planing asphaltic pavement, superpave asphaltic
concrete pavement and related work.
 
RankLicenseBidderAmount
105789 D & J CONSTRUCTION CO., INC. $1,418,807.20
212487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,453,236.41
 
Item Number Item Description Quantity Unit of Measure - 1 -
D & J CONSTRUCTION CO., INC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-08-A borrow (vehicular meas.)(selected soils) 1,951      CUYD 10.00 19,510.00 15.00 29,265.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
121      CUYD 55.00 6,655.00 65.00 7,865.00        
502-01 superpave asphaltic concrete 10,975.3    TON 55.00 603,641.50 48.69 534,387.35        
502-01-A superpave asphaltic concrete, paved drives and
turnouts
314.6    TON 125.00 39,325.00 124.69 39,227.47        
509-01 cold planing asphaltic pavement 54,855      SQYD 2.00 109,710.00 1.50 82,282.50        
509-02 contractor retained reclaimed asphaltic pavement - 1,240      CUYD 0.01 - 12.40 0.10 - 124.00        
713-01 temporary signs & barricades lump      LUMP 85,000.00 85,000.00 85,000.00 85,000.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
9.191  MILE 200.00 1,838.20 250.00 2,297.75        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
1.418  MILE 400.00 567.20 250.00 354.50        
713-05-A temporary pavement markings (solid line)(4" width) 16.965  MILE 280.00 4,750.20 550.00 9,330.75        
722-01 project site laboratory 1      EACH 5,000.00 5,000.00 43,795.00 43,795.00        
727-01 mobilization lump      LUMP 135,000.00 135,000.00 123,000.00 123,000.00        
731-02 reflectorized raised pavement markers 607      EACH 6.50 3,945.50 5.00 3,035.00        
732-02-A plastic pavement striping (solid line) (4" width) 8.483  MILE 2,600.00 22,055.80 1,945.00 16,499.43        
732-03-A plastic pavement striping (broken line)(4" width) 0.708  MILE 1,000.00 708.00 705.00 499.14        
735-01 mailboxes 13      EACH 5.00 65.00 25.00 325.00        
735-02 mailbox supports (single) 6      EACH 150.00 900.00 475.00 2,850.00        
735-03 mailbox supports (double) 2      EACH 250.00 500.00 585.00 1,170.00        
735-04 mailbox supports (multiple) 1      EACH 350.00 350.00 1,150.00 1,150.00        
740-01 construction layout lump      LUMP 30,000.00 30,000.00 72,483.00 72,483.00        
S-001 cement treated base course (12 in depth) 57,262      SQYD 6.10 349,298.20 6.96 398,543.52        
                       
 CONTRACTOR TOTAL       1,418,807.20   1,453,236.41        