Letting of 12/15/2004 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 810-31-0005
Parish: CALCASIEU, JEFF DAVIS
Routes: LA 3258
Description: PARK RD. - JCT US 165
Type Const: grading, cold planing acp, superpave acp ovly, pvmt patch, and related work.
 
RankLicenseBidderAmount
100183 R. E. HEIDT CONSTRUCTION CO., INC. $319,008.09
214096 BESSETTE DEVELOPMENT CORP. $341,956.68
312487 DIAMOND B CONSTRUCTION CO., L.L.C. $429,897.39
 
Item Number Item Description Quantity Unit of Measure - 1 -
R. E. HEIDT CONSTRUCTION CO., INC.
- 2 -
BESSETTE DEVELOPMENT CORP.
- 3 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 536      LNFT 9.65 5,172.40 3.35 1,795.60 6.00 3,216.00    
203-08 borrow (vehicular measurement) 265      CUYD 18.50 4,902.50 15.00 3,975.00 22.00 5,830.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
893      CUYD 39.00 34,827.00 43.50 38,845.50 42.50 37,952.50    
502-01 superpave asphaltic concrete 4,196.5    TON 47.30 198,494.45 48.50 203,530.25 48.69 204,327.58    
502-01-A superpave asphaltic concrete, paved drives and
turnouts
68.9    TON 90.00 6,201.00 50.50 3,479.45 125.00 8,612.50    
509-01 cold planing asphaltic pavement 1,530      SQYD 3.75 5,737.50 3.35 5,125.50 10.00 15,300.00    
509-02 contractor retained reclaimed asphaltic pavement - 36      CUYD 1.00 - 36.00 1.15 - 41.40 0.10 - 3.60    
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 168.8    LNFT 31.27 5,278.37 32.80 5,536.64 45.00 7,596.00    
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 152.0    LNFT 46.00 6,992.00 48.35 7,349.20 52.00 7,904.00    
704-03 blocked out guard rail 162.5    LNFT 16.00 2,600.00 16.65 2,705.62 18.00 2,925.00    
704-05 guard rail anchor sections (bct) 12.5    LNFT 64.00 800.00 66.75 834.37 65.00 812.50    
704-11-A guard rail end treatment (flared) 6      EACH 1,900.00 11,400.00 1,945.00 11,670.00 2,500.00 15,000.00    
713-01 temporary signs & barricades lump      LUMP 2,700.00 2,700.00 4,200.00 4,200.00 35,000.00 35,000.00    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
2.580  MILE 205.00 528.90 3,200.00 8,256.00 250.00 645.00    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
2.232  MILE 212.00 473.18 222.25 496.06 215.00 479.88    
713-05-A temporary pavement markings (solid line)(4" width) 6.182  MILE 425.00 2,627.35 555.85 3,436.26 515.00 3,183.73    
724-01-B pavement patching (12" minimum thickness) 192      SQYD 59.00 11,328.00 58.00 11,136.00 100.00 19,200.00    
727-01 mobilization lump      LUMP 5,500.00 5,500.00 12,500.00 12,500.00 35,000.00 35,000.00    
729-16-C object marker assembly (type 3) 8      EACH 75.00 600.00 75.50 604.00 85.00 680.00    
731-02 reflectorized raised pavement markers 172      EACH 5.30 911.60 5.55 954.60 6.00 1,032.00    
732-02-A plastic pavement striping (solid line) (4" width) 3.091  MILE 1,800.00 5,563.80 2,000.00 6,182.00 2,500.00 7,727.50    
732-03-A plastic pavement striping (broken line)(4" width) 1.116  MILE 690.00 770.04 722.25 806.03 800.00 892.80    
740-01 construction layout lump      LUMP 3,800.00 3,800.00 7,500.00 7,500.00 15,000.00 15,000.00    
S-104 cleaning and resealing existing transverse joints
(bridges)
144      LNFT 12.75 1,836.00 7.50 1,080.00 11.00 1,584.00    
                       
 CONTRACTOR TOTAL       319,008.09   341,956.68   429,897.39    