| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - R. E. HEIDT CONSTRUCTION CO., INC. |
- 2 - PRAIRIE CONTRACTORS INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
302   |
LNFT |
8.00 |
2,416.00 |
6.00 |
1,812.00 |
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
3,300.00 |
3,300.00 |
1,000.00 |
1,000.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
280   |
CUYD |
17.00 |
4,760.00 |
15.00 |
4,200.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
960   |
CUYD |
42.00 |
40,320.00 |
45.00 |
43,200.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
4,184.5 |
TON |
52.50 |
219,686.25 |
52.00 |
217,594.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
276.3 |
TON |
85.00 |
23,485.50 |
20.00 |
5,526.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
1,822   |
SQYD |
2.95 |
5,374.90 |
9.00 |
16,398.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 28   |
CUYD |
1.00 |
- 28.00 |
0.01 |
- 0.28 |
|
|
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
2,290   |
LNFT |
1.33 |
3,045.70 |
1.75 |
4,007.50 |
|
|
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
1,263   |
LNFT |
1.60 |
2,020.80 |
1.75 |
2,210.25 |
|
|
|
|
| 602-03 |
cleaning and sealing random cracks
|
630   |
LNFT |
3.20 |
2,016.00 |
2.30 |
1,449.00 |
|
|
|
|
| 602-05-I-01 |
full depth patching of jointed conc pvmt (9" thick)
(16.0 sq yds & under) |
20.0 |
SQYD |
185.00 |
3,700.00 |
150.00 |
3,000.00 |
|
|
|
|
| 602-05-I-02 |
full depth patching of jointed conc pvmt (9" thick)
(16.1 - 48.0 sq yds) |
33.3 |
SQYD |
160.00 |
5,328.00 |
130.00 |
4,329.00 |
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
75.0 |
LNFT |
31.25 |
2,343.75 |
35.00 |
2,625.00 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
118.0 |
LNFT |
46.00 |
5,428.00 |
52.00 |
6,136.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
100.0 |
LNFT |
16.00 |
1,600.00 |
18.00 |
1,800.00 |
|
|
|
|
| 704-05 |
guard rail anchor sections (bct)
|
12.5 |
LNFT |
64.00 |
800.00 |
72.00 |
900.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
3   |
EACH |
1,900.00 |
5,700.00 |
2,000.00 |
6,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
2,600.00 |
2,600.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
3.153 |
MILE |
225.00 |
709.42 |
300.00 |
945.90 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
3.440 |
MILE |
340.00 |
1,169.60 |
1.00 |
3.44 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
2.076 |
MILE |
670.00 |
1,390.92 |
1.00 |
2.07 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
228   |
SQYD |
63.00 |
14,364.00 |
79.00 |
18,012.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
11,000.00 |
11,000.00 |
76,000.00 |
76,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
10   |
EACH |
58.00 |
580.00 |
60.00 |
600.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
72.00 |
288.00 |
75.00 |
300.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
257   |
EACH |
5.40 |
1,387.80 |
6.00 |
1,542.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
1.038 |
MILE |
2,400.00 |
2,491.20 |
2,500.00 |
2,595.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.720 |
MILE |
700.00 |
1,204.00 |
1,000.00 |
1,720.00 |
|
|
|
|
| 735-01 |
mailboxes
|
11   |
EACH |
1.06 |
11.66 |
1.50 |
16.50 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
11   |
EACH |
133.00 |
1,463.00 |
150.00 |
1,650.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
2,000.00 |
2,000.00 |
100.00 |
100.00 |
|
|
|
|
| S-104 |
cleaning and resealing existing transverse joints
(bridges) |
56   |
LNFT |
5.30 |
296.80 |
5.00 |
280.00 |
|
|
|
|
| S-922 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
399   |
LNFT |
1.35 |
538.65 |
5.00 |
1,995.00 |
|
|
|
|
| S-923 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
128   |
LNFT |
1.35 |
172.80 |
5.00 |
640.00 |
|
|
|
|
| S-927 |
sawcuts in asphaltic concrete lifts
|
527   |
LNFT |
1.12 |
590.24 |
1.50 |
790.50 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
373,554.99 |
|
434,378.88 |
|
|
|
|
|