Letting of 12/15/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 713-42-0131
Parish: RICHLAND
Routes:
Description: BRIDGES ON SCALES, PONY GREER AND BEACH ROADS.
Type Const: grading, class ii base course, superpave asphaltic concrete pavement, concrete
slab span bridges and related work.
 
RankLicenseBidderAmount
123112 BEN ALLEN, INC. $543,772.95
212136 SHILOH CONTRACTORS, INC. $607,208.50
314788 LOUISIANA BRIDGE, INC. $640,144.34
 
Item Number Item Description Quantity Unit of Measure - 1 -
BEN ALLEN, INC.
- 2 -
SHILOH CONTRACTORS, INC.
- 3 -
LOUISIANA BRIDGE, INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 16.00 16.00 16,000.00 16,000.00 21,000.00 21,000.00    
202-02-A-01 removal of bridge (sta. 15+00.00; 3 span, 18.70' wide
x 40.36' long timber structure)
1      EACH 2,500.00 2,500.00 8,000.00 8,000.00 3,000.00 3,000.00    
202-02-A-02 removal of bridge (sta. 15+00.00; 3 span, 23.90' wide
x 40.36' long timber structure)
1      EACH 2,500.00 2,500.00 8,000.00 8,000.00 3,700.00 3,700.00    
202-02-I removal of cross drain pipe (sta. 15+00.00; 2 - 60" x
31' c.m.p.)
lump      lump 2,500.00 2,500.00 8,000.00 8,000.00 3,700.00 3,700.00    
203-06 excavation & embankment lump      LUMP 30,000.00 30,000.00 24,000.00 24,000.00 56,300.00 56,300.00    
204-02 temporary hay or straw bales 72      EACH FREE FREE 2.00 144.00 1.00 72.00    
204-03 temporary slope drains 200      LNFT FREE FREE 2.00 400.00 1.00 200.00    
204-05-A temporary sediment check dams (hay) 12      EACH FREE FREE 5.00 60.00 1.00 12.00    
204-06 temporary silt fencing 2,185      LNFT FREE FREE 3.00 6,555.00 1.00 2,185.00    
302-01 class ii base course 429.9    CUYD 64.00 27,513.60 75.00 32,242.50 85.00 36,541.50    
401-02 aggregate surface course (adjusted vehicular
measurement)
21      CUYD 64.00 1,344.00 85.00 1,785.00 100.00 2,100.00    
403-01 aggregate roadway surfacing (vehicular measurement) 34.3    CUYD 64.00 2,195.20 70.00 2,401.00 100.00 3,430.00    
502-01 superpave asphaltic concrete 355.7    TON 114.00 40,549.80 125.00 44,462.50 131.00 46,596.70    
701-05-G-01 side drain pipe (18")(erosion) 24      LNFT 50.00 1,200.00 32.00 768.00 68.50 1,644.00    
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 45.00 9,000.00 45.00 9,000.00 49.00 9,800.00    
704-09 guard rail anchor sections (turndown) 200.0    LNFT 35.00 7,000.00 35.00 7,000.00 28.50 5,700.00    
711-01-C riprap (30 lb,14" thick) 504      SQYD 45.00 22,680.00 50.00 25,200.00 51.50 25,956.00    
711-04 geotextile fabric 504      SQYD 2.00 1,008.00 2.50 1,260.00 3.00 1,512.00    
713-01 temporary signs & barricades lump      LUMP 12,000.00 12,000.00 6,000.00 6,000.00 8,000.00 8,000.00    
726-01 bedding material 140.5    CUYD 64.00 8,992.00 70.00 9,835.00 74.00 10,397.00    
727-01 mobilization lump      LUMP 39,000.00 39,000.00 58,000.00 58,000.00 40,000.00 40,000.00    
729-16-B object marker assembly (type 2) 4      EACH 60.00 240.00 60.00 240.00 68.50 274.00    
729-16-C object marker assembly (type 3) 16      EACH 70.00 1,120.00 70.00 1,120.00 77.50 1,240.00    
740-01 construction layout lump      LUMP 11,000.00 11,000.00 10,000.00 10,000.00 10,000.00 10,000.00    
804-01-B precast concrete piles (14") 1,544      LNFT 40.00 61,760.00 34.00 52,496.00 43.50 67,164.00    
804-12 loading permanent piles 2      EACH FREE FREE FREE FREE 1.00 2.00    
805-01-B class a concrete (box culvert headwalls) 37.84   CUYD 790.00 29,893.60 1,200.00 45,408.00 721.00 27,282.64    
805-10-A bridge superstructure & substructure (28' wide roadway;
90 degree crossing)
3      SPAN 19,000.00 57,000.00 20,000.00 60,000.00 19,000.00 57,000.00    
805-10-B bridge superstructure & substructure (28' wide roadway;
60 degree crossing)
3      SPAN 19,000.00 57,000.00 20,000.00 60,000.00 21,000.00 63,000.00    
805-12-P reinforced concrete box culverts (7'x 7') 152.0    LNFT 527.00 80,104.00 545.00 82,840.00 647.00 98,344.00    
806-01 deformed reinforcing steel 2,661      LB 1.75 4,656.75 1.50 3,991.50 1.50 3,991.50    
S-101 concrete approach slabs (28'clear roadway; 90 degree
crossing)(w/o/asphalt)
2      EACH 7,500.00 15,000.00 5,500.00 11,000.00 7,000.00 14,000.00    
S-102 concrete approach slabs (28 clear roadway; 60 degree
crossing)(w/o asphalt)
2      EACH 8,000.00 16,000.00 5,500.00 11,000.00 8,000.00 16,000.00    
                       
 CONTRACTOR TOTAL       543,772.95   607,208.50   640,144.34    