| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BEN ALLEN, INC. |
- 2 - SHILOH CONTRACTORS, INC. |
- 3 - LOUISIANA BRIDGE, INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
16.00 |
16.00 |
16,000.00 |
16,000.00 |
21,000.00 |
21,000.00 |
|
|
| 202-02-A-01 |
removal of bridge (sta. 15+00.00; 3 span, 18.70' wide
x 40.36' long timber structure) |
1   |
EACH |
2,500.00 |
2,500.00 |
8,000.00 |
8,000.00 |
3,000.00 |
3,000.00 |
|
|
| 202-02-A-02 |
removal of bridge (sta. 15+00.00; 3 span, 23.90' wide
x 40.36' long timber structure) |
1   |
EACH |
2,500.00 |
2,500.00 |
8,000.00 |
8,000.00 |
3,700.00 |
3,700.00 |
|
|
| 202-02-I |
removal of cross drain pipe (sta. 15+00.00; 2 - 60" x
31' c.m.p.) |
lump |
lump |
2,500.00 |
2,500.00 |
8,000.00 |
8,000.00 |
3,700.00 |
3,700.00 |
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
30,000.00 |
30,000.00 |
24,000.00 |
24,000.00 |
56,300.00 |
56,300.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
72   |
EACH |
FREE |
FREE |
2.00 |
144.00 |
1.00 |
72.00 |
|
|
| 204-03 |
temporary slope drains
|
200   |
LNFT |
FREE |
FREE |
2.00 |
400.00 |
1.00 |
200.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
12   |
EACH |
FREE |
FREE |
5.00 |
60.00 |
1.00 |
12.00 |
|
|
| 204-06 |
temporary silt fencing
|
2,185   |
LNFT |
FREE |
FREE |
3.00 |
6,555.00 |
1.00 |
2,185.00 |
|
|
| 302-01 |
class ii base course
|
429.9 |
CUYD |
64.00 |
27,513.60 |
75.00 |
32,242.50 |
85.00 |
36,541.50 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
21   |
CUYD |
64.00 |
1,344.00 |
85.00 |
1,785.00 |
100.00 |
2,100.00 |
|
|
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
34.3 |
CUYD |
64.00 |
2,195.20 |
70.00 |
2,401.00 |
100.00 |
3,430.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
355.7 |
TON |
114.00 |
40,549.80 |
125.00 |
44,462.50 |
131.00 |
46,596.70 |
|
|
| 701-05-G-01 |
side drain pipe (18")(erosion)
|
24   |
LNFT |
50.00 |
1,200.00 |
32.00 |
768.00 |
68.50 |
1,644.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
45.00 |
9,000.00 |
45.00 |
9,000.00 |
49.00 |
9,800.00 |
|
|
| 704-09 |
guard rail anchor sections (turndown)
|
200.0 |
LNFT |
35.00 |
7,000.00 |
35.00 |
7,000.00 |
28.50 |
5,700.00 |
|
|
| 711-01-C |
riprap (30 lb,14" thick)
|
504   |
SQYD |
45.00 |
22,680.00 |
50.00 |
25,200.00 |
51.50 |
25,956.00 |
|
|
| 711-04 |
geotextile fabric
|
504   |
SQYD |
2.00 |
1,008.00 |
2.50 |
1,260.00 |
3.00 |
1,512.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
12,000.00 |
12,000.00 |
6,000.00 |
6,000.00 |
8,000.00 |
8,000.00 |
|
|
| 726-01 |
bedding material
|
140.5 |
CUYD |
64.00 |
8,992.00 |
70.00 |
9,835.00 |
74.00 |
10,397.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
39,000.00 |
39,000.00 |
58,000.00 |
58,000.00 |
40,000.00 |
40,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
60.00 |
240.00 |
60.00 |
240.00 |
68.50 |
274.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
16   |
EACH |
70.00 |
1,120.00 |
70.00 |
1,120.00 |
77.50 |
1,240.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
11,000.00 |
11,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
|
|
| 804-01-B |
precast concrete piles (14")
|
1,544   |
LNFT |
40.00 |
61,760.00 |
34.00 |
52,496.00 |
43.50 |
67,164.00 |
|
|
| 804-12 |
loading permanent piles
|
2   |
EACH |
FREE |
FREE |
FREE |
FREE |
1.00 |
2.00 |
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
37.84 |
CUYD |
790.00 |
29,893.60 |
1,200.00 |
45,408.00 |
721.00 |
27,282.64 |
|
|
| 805-10-A |
bridge superstructure & substructure (28' wide roadway;
90 degree crossing) |
3   |
SPAN |
19,000.00 |
57,000.00 |
20,000.00 |
60,000.00 |
19,000.00 |
57,000.00 |
|
|
| 805-10-B |
bridge superstructure & substructure (28' wide roadway;
60 degree crossing) |
3   |
SPAN |
19,000.00 |
57,000.00 |
20,000.00 |
60,000.00 |
21,000.00 |
63,000.00 |
|
|
| 805-12-P |
reinforced concrete box culverts (7'x 7')
|
152.0 |
LNFT |
527.00 |
80,104.00 |
545.00 |
82,840.00 |
647.00 |
98,344.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
2,661   |
LB |
1.75 |
4,656.75 |
1.50 |
3,991.50 |
1.50 |
3,991.50 |
|
|
| S-101 |
concrete approach slabs (28'clear roadway; 90 degree
crossing)(w/o/asphalt) |
2   |
EACH |
7,500.00 |
15,000.00 |
5,500.00 |
11,000.00 |
7,000.00 |
14,000.00 |
|
|
| S-102 |
concrete approach slabs (28 clear roadway; 60 degree
crossing)(w/o asphalt) |
2   |
EACH |
8,000.00 |
16,000.00 |
5,500.00 |
11,000.00 |
8,000.00 |
16,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
543,772.95 |
|
607,208.50 |
|
640,144.34 |
|
|
|