| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - W. E. MCDONALD & SON, LLC. |
- 2 - GUINN BROTHERS, LLC. |
- 3 - F. MILLER & SONS, LLC |
- 4 - MID SOUTH CONST INC OF MISSISSIPPI |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
12,000.00 |
12,000.00 |
15,000.00 |
15,000.00 |
24,900.00 |
24,900.00 |
10,000.00 |
10,000.00 |
| 202-02-A-01 |
removal of bridge(sta. 15+00-23.25ft.x 57ft. precast
concrete bridge) |
1   |
EACH |
6,000.00 |
6,000.00 |
4,000.00 |
4,000.00 |
19,700.00 |
19,700.00 |
3,500.00 |
3,500.00 |
| 202-02-A-02 |
removal of bridge(sta. 15+00-20.25ft.x 79ft. timber
bridge) |
1   |
EACH |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
14,800.00 |
14,800.00 |
3,500.00 |
3,500.00 |
| 202-02-A-03 |
removal of bridge(sta. 15+00-25ft.x 80ft. precast
concrete bridge) |
1   |
EACH |
6,000.00 |
6,000.00 |
8,000.00 |
8,000.00 |
15,200.00 |
15,200.00 |
40,000.00 |
40,000.00 |
| 202-02-A-04 |
removal of bridge(sta.15+00-22.5 ft.x 76 ft.timber
bridge) |
1   |
EACH |
5,000.00 |
5,000.00 |
6,000.00 |
6,000.00 |
16,300.00 |
16,300.00 |
40,000.00 |
40,000.00 |
| 203-06 |
excavation & embankment
|
lump |
LUMP |
30,000.00 |
30,000.00 |
31,000.00 |
31,000.00 |
82,400.00 |
82,400.00 |
30,000.00 |
30,000.00 |
| 204-02 |
temporary hay or straw bales
|
22   |
EACH |
7.00 |
154.00 |
10.00 |
220.00 |
14.00 |
308.00 |
12.00 |
264.00 |
| 204-03 |
temporary slope drains
|
640   |
LNFT |
4.00 |
2,560.00 |
1.00 |
640.00 |
8.00 |
5,120.00 |
15.00 |
9,600.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
16   |
EACH |
100.00 |
1,600.00 |
100.00 |
1,600.00 |
74.00 |
1,184.00 |
140.00 |
2,240.00 |
| 204-06 |
temporary silt fencing
|
3,190   |
LNFT |
2.00 |
6,380.00 |
1.25 |
3,987.50 |
2.00 |
6,380.00 |
2.00 |
6,380.00 |
| 302-01-A |
class ii base course(stone)
|
797.0 |
CUYD |
68.00 |
54,196.00 |
85.00 |
67,745.00 |
25.00 |
19,925.00 |
80.00 |
63,760.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
55   |
CUYD |
75.00 |
4,125.00 |
85.00 |
4,675.00 |
38.00 |
2,090.00 |
60.00 |
3,300.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
400.0 |
CUYD |
1.00 |
400.00 |
50.00 |
20,000.00 |
49.00 |
19,600.00 |
60.00 |
24,000.00 |
| 502-01 |
superpave asphaltic concrete
|
648.8 |
TON |
100.00 |
64,880.00 |
135.00 |
87,588.00 |
141.00 |
91,480.80 |
140.00 |
90,832.00 |
| 701-05-K |
side drain pipe (30")
|
18   |
LNFT |
45.00 |
810.00 |
150.00 |
2,700.00 |
52.00 |
936.00 |
60.00 |
1,080.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
375.0 |
LNFT |
46.75 |
17,531.25 |
50.00 |
18,750.00 |
46.00 |
17,250.00 |
46.75 |
17,531.25 |
| 704-09 |
guard rail anchor sections (turndown)
|
375.0 |
LNFT |
26.75 |
10,031.25 |
31.00 |
11,625.00 |
26.00 |
9,750.00 |
26.75 |
10,031.25 |
| 704-11-A |
guard rail end treatment (flared)
|
1   |
EACH |
1,850.00 |
1,850.00 |
2,200.00 |
2,200.00 |
4,600.00 |
4,600.00 |
1,850.00 |
1,850.00 |
| 705-01 |
barbed wire fence
|
639   |
LNFT |
6.00 |
3,834.00 |
5.00 |
3,195.00 |
6.00 |
3,834.00 |
18.00 |
11,502.00 |
| 705-06-A |
chain link fence (4-foot height)
|
66   |
LNFT |
22.00 |
1,452.00 |
20.00 |
1,320.00 |
22.00 |
1,452.00 |
25.00 |
1,650.00 |
| 711-01-D |
riprap (55 lb,18" thick)
|
1,944   |
SQYD |
40.00 |
77,760.00 |
45.00 |
87,480.00 |
40.00 |
77,760.00 |
45.00 |
87,480.00 |
| 711-04 |
geotextile fabric
|
1,944   |
SQYD |
2.50 |
4,860.00 |
5.00 |
9,720.00 |
2.50 |
4,860.00 |
2.00 |
3,888.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
30,000.00 |
30,000.00 |
24,000.00 |
24,000.00 |
51,600.00 |
51,600.00 |
35,000.00 |
35,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
40,000.00 |
40,000.00 |
20,000.00 |
20,000.00 |
100,000.00 |
100,000.00 |
10,000.00 |
10,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
31   |
EACH |
70.00 |
2,170.00 |
75.00 |
2,325.00 |
70.00 |
2,170.00 |
75.00 |
2,325.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
7,500.00 |
7,500.00 |
16,000.00 |
16,000.00 |
23,400.00 |
23,400.00 |
25,000.00 |
25,000.00 |
| 804-01-B |
precast concrete piles (14")
|
3,993   |
LNFT |
30.00 |
119,790.00 |
34.00 |
135,762.00 |
24.45 |
97,628.85 |
35.00 |
139,755.00 |
| 804-12 |
loading permanent piles
|
4   |
EACH |
1.00 |
4.00 |
1.00 |
4.00 |
100.00 |
400.00 |
500.00 |
2,000.00 |
| 805-10-A |
bridge superstructure & substructure(24 ft.clear
roadway-90 degree crossing) |
8   |
SPAN |
16,500.00 |
132,000.00 |
19,000.00 |
152,000.00 |
12,600.00 |
100,800.00 |
20,000.00 |
160,000.00 |
| 805-10-B |
bridge superstructure & substructure(24 ft.clear
roadway-90 degree crossing)(c.i.p.) |
5   |
SPAN |
18,000.00 |
90,000.00 |
19,000.00 |
95,000.00 |
16,800.00 |
84,000.00 |
20,000.00 |
100,000.00 |
| 805-10-C |
bridge superstructure & substructure(24 ft.clear
roadway-75 degree crossing) |
5   |
SPAN |
16,500.00 |
82,500.00 |
19,500.00 |
97,500.00 |
14,300.00 |
71,500.00 |
20,000.00 |
100,000.00 |
| S-101 |
concrete approach slabs (24ft. clear roadway;
90 degree crossing w/o asphalt) |
4   |
EACH |
7,000.00 |
28,000.00 |
6,500.00 |
26,000.00 |
6,000.00 |
24,000.00 |
6,500.00 |
26,000.00 |
| S-102 |
concrete approach slabs (24ft. clear roadway;
90 degree crossing w/o asphalt,curved) |
2   |
EACH |
7,000.00 |
14,000.00 |
6,500.00 |
13,000.00 |
6,000.00 |
12,000.00 |
6,500.00 |
13,000.00 |
| S-103 |
concrete approach slabs (24ft. clear roadway;
75 degree crossing w/o asphalt) |
2   |
EACH |
7,000.00 |
14,000.00 |
6,500.00 |
13,000.00 |
6,000.00 |
12,000.00 |
6,500.00 |
13,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
876,387.50 |
|
987,036.50 |
|
1,019,328.65 |
|
1,088,468.50 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - GILCHRIST CONSTRUCTION CO. LLC |
- 6 - KOSTMAYER CONSTRUCTION, LLC |
- 7 - JAMES CONSTRUCTION GROUP LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
60,000.00 |
60,000.00 |
40,000.00 |
40,000.00 |
35,000.00 |
35,000.00 |
|
|
| 202-02-A-01 |
removal of bridge(sta. 15+00-23.25ft.x 57ft. precast
concrete bridge) |
1   |
EACH |
7,500.00 |
7,500.00 |
7,000.00 |
7,000.00 |
16,000.00 |
16,000.00 |
|
|
| 202-02-A-02 |
removal of bridge(sta. 15+00-20.25ft.x 79ft. timber
bridge) |
1   |
EACH |
7,500.00 |
7,500.00 |
7,000.00 |
7,000.00 |
10,000.00 |
10,000.00 |
|
|
| 202-02-A-03 |
removal of bridge(sta. 15+00-25ft.x 80ft. precast
concrete bridge) |
1   |
EACH |
7,500.00 |
7,500.00 |
8,000.00 |
8,000.00 |
23,000.00 |
23,000.00 |
|
|
| 202-02-A-04 |
removal of bridge(sta.15+00-22.5 ft.x 76 ft.timber
bridge) |
1   |
EACH |
7,500.00 |
7,500.00 |
8,000.00 |
8,000.00 |
10,000.00 |
10,000.00 |
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
50,000.00 |
50,000.00 |
31.00 |
31.00 |
65,000.00 |
65,000.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
22   |
EACH |
12.00 |
264.00 |
7.00 |
154.00 |
10.00 |
220.00 |
|
|
| 204-03 |
temporary slope drains
|
640   |
LNFT |
10.00 |
6,400.00 |
11.00 |
7,040.00 |
3.00 |
1,920.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
16   |
EACH |
100.00 |
1,600.00 |
110.00 |
1,760.00 |
150.00 |
2,400.00 |
|
|
| 204-06 |
temporary silt fencing
|
3,190   |
LNFT |
2.50 |
7,975.00 |
2.00 |
6,380.00 |
2.00 |
6,380.00 |
|
|
| 302-01-A |
class ii base course(stone)
|
797.0 |
CUYD |
75.00 |
59,775.00 |
65.00 |
51,805.00 |
60.00 |
47,820.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
55   |
CUYD |
80.00 |
4,400.00 |
65.00 |
3,575.00 |
50.00 |
2,750.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
400.0 |
CUYD |
45.00 |
18,000.00 |
65.00 |
26,000.00 |
60.00 |
24,000.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
648.8 |
TON |
125.00 |
81,100.00 |
185.00 |
120,028.00 |
200.00 |
129,760.00 |
|
|
| 701-05-K |
side drain pipe (30")
|
18   |
LNFT |
100.00 |
1,800.00 |
105.00 |
1,890.00 |
140.00 |
2,520.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
375.0 |
LNFT |
55.00 |
20,625.00 |
56.00 |
21,000.00 |
50.00 |
18,750.00 |
|
|
| 704-09 |
guard rail anchor sections (turndown)
|
375.0 |
LNFT |
32.00 |
12,000.00 |
43.00 |
16,125.00 |
27.00 |
10,125.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
1   |
EACH |
2,200.00 |
2,200.00 |
2,150.00 |
2,150.00 |
1,900.00 |
1,900.00 |
|
|
| 705-01 |
barbed wire fence
|
639   |
LNFT |
7.00 |
4,473.00 |
7.00 |
4,473.00 |
5.00 |
3,195.00 |
|
|
| 705-06-A |
chain link fence (4-foot height)
|
66   |
LNFT |
26.00 |
1,716.00 |
15.00 |
990.00 |
21.00 |
1,386.00 |
|
|
| 711-01-D |
riprap (55 lb,18" thick)
|
1,944   |
SQYD |
40.00 |
77,760.00 |
55.00 |
106,920.00 |
48.00 |
93,312.00 |
|
|
| 711-04 |
geotextile fabric
|
1,944   |
SQYD |
2.50 |
4,860.00 |
1.50 |
2,916.00 |
2.50 |
4,860.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
18,000.00 |
18,000.00 |
31,000.00 |
31,000.00 |
20,000.00 |
20,000.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
100,000.00 |
100,000.00 |
115,000.00 |
115,000.00 |
115,000.00 |
115,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
31   |
EACH |
80.00 |
2,480.00 |
75.00 |
2,325.00 |
70.00 |
2,170.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
30,000.00 |
30,000.00 |
37,000.00 |
37,000.00 |
20,000.00 |
20,000.00 |
|
|
| 804-01-B |
precast concrete piles (14")
|
3,993   |
LNFT |
35.00 |
139,755.00 |
36.50 |
145,744.50 |
65.00 |
259,545.00 |
|
|
| 804-12 |
loading permanent piles
|
4   |
EACH |
100.00 |
400.00 |
100.00 |
400.00 |
500.00 |
2,000.00 |
|
|
| 805-10-A |
bridge superstructure & substructure(24 ft.clear
roadway-90 degree crossing) |
8   |
SPAN |
21,700.00 |
173,600.00 |
21,000.00 |
168,000.00 |
29,000.00 |
232,000.00 |
|
|
| 805-10-B |
bridge superstructure & substructure(24 ft.clear
roadway-90 degree crossing)(c.i.p.) |
5   |
SPAN |
21,500.00 |
107,500.00 |
24,000.00 |
120,000.00 |
27,000.00 |
135,000.00 |
|
|
| 805-10-C |
bridge superstructure & substructure(24 ft.clear
roadway-75 degree crossing) |
5   |
SPAN |
21,900.00 |
109,500.00 |
21,000.00 |
105,000.00 |
28,500.00 |
142,500.00 |
|
|
| S-101 |
concrete approach slabs (24ft. clear roadway;
90 degree crossing w/o asphalt) |
4   |
EACH |
6,500.00 |
26,000.00 |
21,000.00 |
84,000.00 |
7,000.00 |
28,000.00 |
|
|
| S-102 |
concrete approach slabs (24ft. clear roadway;
90 degree crossing w/o asphalt,curved) |
2   |
EACH |
6,500.00 |
13,000.00 |
7,000.00 |
14,000.00 |
7,000.00 |
14,000.00 |
|
|
| S-103 |
concrete approach slabs (24ft. clear roadway;
75 degree crossing w/o asphalt) |
2   |
EACH |
6,500.00 |
13,000.00 |
7,000.00 |
14,000.00 |
7,000.00 |
14,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,178,183.00 |
|
1,279,706.50 |
|
1,494,513.00 |
|
|
|