Lead Project: 355-02-0010
Parish: CONCORDIA
Routes: LA 566
Description: JUNCTION OF ROUTE US 84 - DUNBARTON
Type Const: grading, cold planing asphaltic concrete, lime treatment, cement treated base course,
superpave asphaltic concrete pavement, and related work.
 
RankLicenseBidderAmount
102268 SOIL STABILIZERS, INC. $1,943,849.65
212487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,960,897.62
302214 W. E. BLAIN & SONS, INC. $2,023,155.52
408815 W. E. MCDONALD & SON, LLC. $2,045,570.98
505789 D & J CONSTRUCTION CO., INC. $2,284,049.57
 
Item Number Item Description Quantity Unit of Measure - 1 -
SOIL STABILIZERS, INC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 3 -
W. E. BLAIN & SONS, INC.
- 4 -
W. E. MCDONALD & SON, LLC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-08-A borrow (vehicular meas.)(selected soils) 3,106      CUYD 10.00 31,060.00 10.50 32,613.00 15.00 46,590.00 1.00 3,106.00
304-01 lime 554.44   TON 105.00 58,216.20 106.00 58,770.64 128.00 70,968.32 102.00 56,552.88
304-04-D lime treatment (type d) (12" thick) 35,200      SQYD 1.25 44,000.00 2.71 95,392.00 1.80 63,360.00 1.90 66,880.00
401-02 aggregate surface course (adjusted vehicular
measurement)
579      CUYD 30.00 17,370.00 40.27 23,316.33 31.00 17,949.00 45.00 26,055.00
502-01 superpave asphaltic concrete 22,333.1    TON 48.50 1,083,155.35 42.99 960,099.96 48.00 1,071,988.80 48.50 1,083,155.35
502-01-A superpave asphaltic concrete, paved drives and
turnouts
36.6    TON 175.00 6,405.00 160.00 5,856.00 175.00 6,405.00 175.00 6,405.00
713-01 temporary signs & barricades lump      LUMP 7,500.00 7,500.00 8,000.00 8,000.00 11,000.00 11,000.00 7,500.00 7,500.00
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
17.197  MILE 400.00 6,878.80 132.00 2,270.00 300.00 5,159.10 250.00 4,299.25
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
15.100  MILE 125.00 1,887.50 205.00 3,095.50 200.00 3,020.00 125.00 1,887.50
713-05-A temporary pavement markings (solid line)(4" width) 41.650  MILE 230.00 9,579.50 411.00 17,118.15 400.00 16,660.00 230.00 9,579.50
722-01 project site laboratory 1      EACH 2,500.00 2,500.00 3,500.00 3,500.00 5,500.00 5,500.00 2,500.00 2,500.00
727-01 mobilization lump      LUMP 10,000.00 10,000.00 25,000.00 25,000.00 100,000.00 100,000.00 132,000.00 132,000.00
731-02 reflectorized raised pavement markers 1,136      EACH 4.00 4,544.00 5.00 5,680.00 4.50 5,112.00 4.00 4,544.00
732-02-A plastic pavement striping (solid line) (4" width) 20.825  MILE 1,900.00 39,567.50 1,750.00 36,443.75 1,700.00 35,402.50 1,900.00 39,567.50
732-03-A plastic pavement striping (broken line)(4" width) 7.550  MILE 500.00 3,775.00 615.00 4,643.25 600.00 4,530.00 500.00 3,775.00
735-01 mailboxes 24      EACH 5.00 120.00 1.00 24.00 1.00 24.00 1.00 24.00
735-02 mailbox supports (single) 15      EACH 125.00 1,875.00 100.00 1,500.00 110.00 1,650.00 125.00 1,875.00
735-03 mailbox supports (double) 1      EACH 175.00 175.00 250.00 250.00 150.00 150.00 175.00 175.00
735-04 mailbox supports (multiple) 2      EACH 300.00 600.00 350.00 700.00 200.00 400.00 325.00 650.00
740-01 construction layout lump      LUMP 23,000.00 23,000.00 23,500.00 23,500.00 23,650.00 23,650.00 15,000.00 15,000.00
S-001 cement treated base course (12 inch depth) 116,008      SQYD 5.10 591,640.80 5.63 653,125.04 4.60 533,636.80 5.00 580,040.00
                       
 CONTRACTOR TOTAL       1,943,849.65   1,960,897.62   2,023,155.52   2,045,570.98
 
Item Number Item Description Quantity Unit of Measure - 5 -
D & J CONSTRUCTION CO., INC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-08-A borrow (vehicular meas.)(selected soils) 3,106      CUYD 12.00 37,272.00            
304-01 lime 554.44   TON 105.00 58,216.20            
304-04-D lime treatment (type d) (12" thick) 35,200      SQYD 1.50 52,800.00            
401-02 aggregate surface course (adjusted vehicular
measurement)
579      CUYD 42.50 24,607.50            
502-01 superpave asphaltic concrete 22,333.1    TON 49.00 1,094,321.90            
502-01-A superpave asphaltic concrete, paved drives and
turnouts
36.6    TON 165.00 6,039.00            
713-01 temporary signs & barricades lump      LUMP 70,000.00 70,000.00            
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
17.197  MILE 175.00 3,009.47            
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
15.100  MILE 125.00 1,887.50            
713-05-A temporary pavement markings (solid line)(4" width) 41.650  MILE 250.00 10,412.50            
722-01 project site laboratory 1      EACH 5,000.00 5,000.00            
727-01 mobilization lump      LUMP 120,000.00 120,000.00            
731-02 reflectorized raised pavement markers 1,136      EACH 4.00 4,544.00            
732-02-A plastic pavement striping (solid line) (4" width) 20.825  MILE 2,900.00 60,392.50            
732-03-A plastic pavement striping (broken line)(4" width) 7.550  MILE 500.00 3,775.00            
735-01 mailboxes 24      EACH 1.00 24.00            
735-02 mailbox supports (single) 15      EACH 125.00 1,875.00            
735-03 mailbox supports (double) 1      EACH 175.00 175.00            
735-04 mailbox supports (multiple) 2      EACH 325.00 650.00            
740-01 construction layout lump      LUMP 33,000.00 33,000.00            
S-001 cement treated base course (12 inch depth) 116,008      SQYD 6.00 696,048.00            
                       
 CONTRACTOR TOTAL       2,284,049.57            