Letting of 12/15/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 296-03-0016
Parish: LINCOLN
Routes: LA 544
Description: ROUTE LA 563 - KENTUCKY AVENUE
Type Const: grading, cold planing asphaltic concrete, lime treatment, cement treated base course,
superpave asphaltic concrete overlay, and related work.
 
RankLicenseBidderAmount
108584 MADDEN CONTRACTING CO., INC. $1,788,804.01
202268 SOIL STABILIZERS, INC. $1,811,621.95
 
Item Number Item Description Quantity Unit of Measure - 1 -
MADDEN CONTRACTING CO., INC.
- 2 -
SOIL STABILIZERS, INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 1.00 1.00 1.00 1.00        
202-02-D removal of concrete walks & drives 250      SQYD 10.00 2,500.00 10.00 2,500.00        
203-08 borrow (vehicular measurement) 602      CUYD 12.00 7,224.00 12.00 7,224.00        
203-08-A borrow (vehicular meas.)(selected soils) 4,595      CUYD 9.00 41,355.00 10.00 45,950.00        
304-01 lime 78.75   TON 110.00 8,662.50 110.00 8,662.50        
304-03-D lime treatment (type c) (12" thick) 16,667      SQYD 1.50 25,000.50 1.50 25,000.50        
401-02 aggregate surface course (adjusted vehicular
measurement)
85      CUYD 40.00 3,400.00 40.00 3,400.00        
502-01 superpave asphaltic concrete 13,304.5    TON 54.00 718,443.00 54.00 718,443.00        
502-01-A superpave asphaltic concrete, paved drives and
turnouts
367.8    TON 165.00 60,687.00 65.00 23,907.00        
509-01 cold planing asphaltic pavement 15,911      SQYD 1.55 24,662.05 2.00 31,822.00        
509-02 contractor retained reclaimed asphaltic pavement - 517      CUYD 0.01 - 5.17 0.01 - 5.17        
702-04-A adjusting manholes 6      EACH 1,100.00 6,600.00 1,100.00 6,600.00        
702-04-D adjusting water valve boxes 6      EACH 400.00 2,400.00 400.00 2,400.00        
713-01 temporary signs & barricades lump      LUMP 54,000.00 54,000.00 45,000.00 45,000.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
9.491  MILE 338.50 3,212.70 400.00 3,796.40        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
3.157  MILE 1.00 3.15 200.00 631.40        
713-05-A temporary pavement markings (solid line)(4" width) 43.878  MILE 1.00 43.87 400.00 17,551.20        
716-01-A mulch (vegetative) 7.27   ACRE 625.00 4,543.75 650.00 4,725.50        
717-01 seeding 327      LB 6.00 1,962.00 6.00 1,962.00        
718-01 fertilizer 7,281      LB 0.25 1,820.25 0.22 1,601.82        
722-02 project site laboratory (equipped) 1.00   EACH 2,500.00 2,500.00 10,000.00 10,000.00        
727-01 mobilization lump      LUMP 54,000.00 54,000.00 40,000.00 40,000.00        
731-02 reflectorized raised pavement markers 990      EACH 4.70 4,653.00 5.00 4,950.00        
732-02-A plastic pavement striping (solid line) (4" width) 31.979  MILE 2,335.00 74,670.96 1,900.00 60,760.10        
732-03-A plastic pavement striping (broken line)(4" width) 2.283  MILE 650.00 1,483.95 700.00 1,598.10        
735-01 mailboxes 83      EACH 1.00 83.00 5.00 415.00        
735-02 mailbox supports (single) 65      EACH 118.00 7,670.00 125.00 8,125.00        
735-03 mailbox supports (double) 7      EACH 170.00 1,190.00 200.00 1,400.00        
735-04 mailbox supports (multiple) 1      EACH 300.00 300.00 250.00 250.00        
740-01 construction layout lump      LUMP 20,000.00 20,000.00 30,000.00 30,000.00        
S-001 cement treated base course (12 inch depth) 104,918      SQYD 6.25 655,737.50 6.70 702,950.60        
                       
 CONTRACTOR TOTAL       1,788,804.01   1,811,621.95        