| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
- 2 - SOIL STABILIZERS, INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
1.00 |
1.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
250   |
SQYD |
10.00 |
2,500.00 |
10.00 |
2,500.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
602   |
CUYD |
12.00 |
7,224.00 |
12.00 |
7,224.00 |
|
|
|
|
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
4,595   |
CUYD |
9.00 |
41,355.00 |
10.00 |
45,950.00 |
|
|
|
|
| 304-01 |
lime
|
78.75 |
TON |
110.00 |
8,662.50 |
110.00 |
8,662.50 |
|
|
|
|
| 304-03-D |
lime treatment (type c) (12" thick)
|
16,667   |
SQYD |
1.50 |
25,000.50 |
1.50 |
25,000.50 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
85   |
CUYD |
40.00 |
3,400.00 |
40.00 |
3,400.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
13,304.5 |
TON |
54.00 |
718,443.00 |
54.00 |
718,443.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
367.8 |
TON |
165.00 |
60,687.00 |
65.00 |
23,907.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
15,911   |
SQYD |
1.55 |
24,662.05 |
2.00 |
31,822.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 517   |
CUYD |
0.01 |
- 5.17 |
0.01 |
- 5.17 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
6   |
EACH |
1,100.00 |
6,600.00 |
1,100.00 |
6,600.00 |
|
|
|
|
| 702-04-D |
adjusting water valve boxes
|
6   |
EACH |
400.00 |
2,400.00 |
400.00 |
2,400.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
54,000.00 |
54,000.00 |
45,000.00 |
45,000.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
9.491 |
MILE |
338.50 |
3,212.70 |
400.00 |
3,796.40 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
3.157 |
MILE |
1.00 |
3.15 |
200.00 |
631.40 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
43.878 |
MILE |
1.00 |
43.87 |
400.00 |
17,551.20 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
7.27 |
ACRE |
625.00 |
4,543.75 |
650.00 |
4,725.50 |
|
|
|
|
| 717-01 |
seeding
|
327   |
LB |
6.00 |
1,962.00 |
6.00 |
1,962.00 |
|
|
|
|
| 718-01 |
fertilizer
|
7,281   |
LB |
0.25 |
1,820.25 |
0.22 |
1,601.82 |
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1.00 |
EACH |
2,500.00 |
2,500.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
54,000.00 |
54,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
990   |
EACH |
4.70 |
4,653.00 |
5.00 |
4,950.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
31.979 |
MILE |
2,335.00 |
74,670.96 |
1,900.00 |
60,760.10 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.283 |
MILE |
650.00 |
1,483.95 |
700.00 |
1,598.10 |
|
|
|
|
| 735-01 |
mailboxes
|
83   |
EACH |
1.00 |
83.00 |
5.00 |
415.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
65   |
EACH |
118.00 |
7,670.00 |
125.00 |
8,125.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
7   |
EACH |
170.00 |
1,190.00 |
200.00 |
1,400.00 |
|
|
|
|
| 735-04 |
mailbox supports (multiple)
|
1   |
EACH |
300.00 |
300.00 |
250.00 |
250.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
30,000.00 |
30,000.00 |
|
|
|
|
| S-001 |
cement treated base course (12 inch depth)
|
104,918   |
SQYD |
6.25 |
655,737.50 |
6.70 |
702,950.60 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,788,804.01 |
|
1,811,621.95 |
|
|
|
|
|