| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BYRON E. TALBOT CONTRACTOR, INC. |
- 2 - BOH BROS. CONSTRUCTION CO., LLC. |
- 3 - MCDONALD CONST. INC. OF SLIDELL |
- 4 - BARRIERE CONSTRUCTION CO., LLC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
15,000.00 |
15,000.00 |
5,000.00 |
5,000.00 |
42,000.00 |
42,000.00 |
10,000.00 |
10,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
20,000.00 |
20,000.00 |
80,000.00 |
80,000.00 |
| 202-02-C |
removal of portland cement concrete pavement
|
418   |
SQYD |
6.60 |
2,758.80 |
15.00 |
6,270.00 |
10.00 |
4,180.00 |
10.00 |
4,180.00 |
| 202-02-D |
removal of concrete walks & drives
|
1,019   |
SQYD |
5.30 |
5,400.70 |
6.00 |
6,114.00 |
5.50 |
5,604.50 |
10.00 |
10,190.00 |
| 202-02-E |
removal of concrete curbs
|
24.0 |
LNFT |
2.50 |
60.00 |
15.00 |
360.00 |
5.00 |
120.00 |
5.00 |
120.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
1,855.0 |
SQYD |
6.30 |
11,686.50 |
6.00 |
11,130.00 |
5.00 |
9,275.00 |
5.00 |
9,275.00 |
| 202-03-A |
relocation of mailbox and support
|
1   |
EACH |
200.00 |
200.00 |
100.00 |
100.00 |
200.00 |
200.00 |
150.00 |
150.00 |
| 202-03-B |
relocation of air release valve
|
1   |
EACH |
400.00 |
400.00 |
2,500.00 |
2,500.00 |
2,200.00 |
2,200.00 |
1,500.00 |
1,500.00 |
| 202-03-C |
relocation of gas valve
|
1   |
EACH |
800.00 |
800.00 |
2,200.00 |
2,200.00 |
3,500.00 |
3,500.00 |
3,000.00 |
3,000.00 |
| 203-05 |
nonplastic embankment
|
512   |
CUYD |
11.50 |
5,888.00 |
20.00 |
10,240.00 |
12.00 |
6,144.00 |
20.00 |
10,240.00 |
| 203-06 |
excavation & embankment
|
lump |
LUMP |
98,500.00 |
98,500.00 |
40,000.00 |
40,000.00 |
45,000.00 |
45,000.00 |
80,000.00 |
80,000.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
48   |
CUYD |
50.00 |
2,400.00 |
50.00 |
2,400.00 |
44.00 |
2,112.00 |
60.00 |
2,880.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
300.0 |
CUYD |
37.00 |
11,100.00 |
42.00 |
12,600.00 |
48.00 |
14,400.00 |
35.00 |
10,500.00 |
| 502-01 |
superpave asphaltic concrete
|
6,665.8 |
TON |
60.00 |
399,948.00 |
55.00 |
366,619.00 |
60.00 |
399,948.00 |
56.00 |
373,284.80 |
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
1,337.9 |
TON |
99.00 |
132,452.10 |
75.00 |
100,342.50 |
82.00 |
109,707.80 |
93.00 |
124,424.70 |
| 509-01 |
cold planing asphaltic pavement
|
24,929   |
SQYD |
1.70 |
42,379.30 |
2.00 |
49,858.00 |
2.25 |
56,090.25 |
1.50 |
37,393.50 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,385   |
CUYD |
3.00 |
- 4,155.00 |
11.00 |
- 15,235.00 |
10.00 |
- 13,850.00 |
6.00 |
- 8,310.00 |
| 601-01-G |
portland cement concrete pavement (8" thick)
|
265.0 |
SQYD |
41.00 |
10,865.00 |
65.00 |
17,225.00 |
50.00 |
13,250.00 |
45.00 |
11,925.00 |
| 701-02-E |
cross drain pipe arch (30" equiv. rcpa)
|
94   |
LNFT |
94.00 |
8,836.00 |
100.00 |
9,400.00 |
89.00 |
8,366.00 |
140.00 |
13,160.00 |
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
1,129   |
LNFT |
29.50 |
33,305.50 |
46.00 |
51,934.00 |
42.00 |
47,418.00 |
45.00 |
50,805.00 |
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
2,970   |
LNFT |
33.70 |
100,089.00 |
52.00 |
154,440.00 |
48.00 |
142,560.00 |
50.00 |
148,500.00 |
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
1,271   |
LNFT |
50.80 |
64,566.80 |
60.00 |
76,260.00 |
54.00 |
68,634.00 |
80.00 |
101,680.00 |
| 701-03-K |
storm drain pipe (30" rcp/pcp)
|
798   |
LNFT |
68.50 |
54,663.00 |
93.00 |
74,214.00 |
85.00 |
67,830.00 |
100.00 |
79,800.00 |
| 701-03-M |
storm drain pipe (36" rcp/pcp)
|
36   |
LNFT |
100.00 |
3,600.00 |
115.00 |
4,140.00 |
105.00 |
3,780.00 |
140.00 |
5,040.00 |
| 701-03-N |
storm drain pipe (42" rcp/pcp)
|
20   |
LNFT |
150.00 |
3,000.00 |
132.00 |
2,640.00 |
120.00 |
2,400.00 |
160.00 |
3,200.00 |
| 701-03-O |
storm drain pipe (48" rcp/pcp)
|
1,110   |
LNFT |
140.00 |
155,400.00 |
140.00 |
155,400.00 |
125.00 |
138,750.00 |
170.00 |
188,700.00 |
| 701-04-B |
storm drain pipe arch (18" equiv. rcpa)
|
103   |
LNFT |
45.00 |
4,635.00 |
57.00 |
5,871.00 |
52.00 |
5,356.00 |
55.00 |
5,665.00 |
| 701-04-D |
storm drain pipe arch (24" equiv. rcpa)
|
375   |
LNFT |
52.00 |
19,500.00 |
63.00 |
23,625.00 |
57.00 |
21,375.00 |
70.00 |
26,250.00 |
| 701-04-E |
storm drain pipe arch (30" equiv. rcpa)
|
679   |
LNFT |
77.00 |
52,283.00 |
100.00 |
67,900.00 |
92.00 |
62,468.00 |
90.00 |
61,110.00 |
| 701-04-F |
storm drain pipe arch (36" equiv. rcpa)
|
166   |
LNFT |
101.00 |
16,766.00 |
120.00 |
19,920.00 |
110.00 |
18,260.00 |
120.00 |
19,920.00 |
| 701-04-H |
storm drain pipe arch (48" equiv. rcpa)
|
431   |
LNFT |
135.00 |
58,185.00 |
140.00 |
60,340.00 |
128.00 |
55,168.00 |
180.00 |
77,580.00 |
| 701-05-G |
side drain pipe (18")
|
433   |
LNFT |
34.00 |
14,722.00 |
53.00 |
22,949.00 |
48.00 |
20,784.00 |
55.00 |
23,815.00 |
| 701-07-C |
yard drain pipe (8")
|
849   |
LNFT |
15.50 |
13,159.50 |
20.00 |
16,980.00 |
16.50 |
14,008.50 |
28.00 |
23,772.00 |
| 701-09 |
fabricating pipe fittings
|
2   |
EACH |
2,600.00 |
5,200.00 |
3,100.00 |
6,200.00 |
2,800.00 |
5,600.00 |
3,500.00 |
7,000.00 |
| 701-14 |
cleaning existing pipes
|
1,005   |
LNFT |
10.00 |
10,050.00 |
4.40 |
4,422.00 |
4.00 |
4,020.00 |
4.00 |
4,020.00 |
| 701-15 |
concrete collar
|
3   |
EACH |
300.00 |
900.00 |
500.00 |
1,500.00 |
450.00 |
1,350.00 |
1,500.00 |
4,500.00 |
| 702-02-B |
manholes (r-cb-11)
|
12   |
EACH |
1,400.00 |
16,800.00 |
3,500.00 |
42,000.00 |
3,200.00 |
38,400.00 |
3,500.00 |
42,000.00 |
| 702-02-C |
manholes (r-cb-11 mod)
|
12   |
EACH |
2,700.00 |
32,400.00 |
4,100.00 |
49,200.00 |
3,800.00 |
45,600.00 |
3,800.00 |
45,600.00 |
| 702-03-A |
catch basins (cb-01)
|
81   |
EACH |
2,100.00 |
170,100.00 |
2,300.00 |
186,300.00 |
2,100.00 |
170,100.00 |
3,000.00 |
243,000.00 |
| 702-03-B |
catch basins (cb-02)
|
12   |
EACH |
3,000.00 |
36,000.00 |
3,300.00 |
39,600.00 |
3,000.00 |
36,000.00 |
4,500.00 |
54,000.00 |
| 702-03-C |
catch basins (cb-06)
|
6   |
EACH |
2,100.00 |
12,600.00 |
4,700.00 |
28,200.00 |
4,300.00 |
25,800.00 |
3,500.00 |
21,000.00 |
| 702-03-H |
catch basins (cb-05)
|
59   |
EACH |
850.00 |
50,150.00 |
2,000.00 |
118,000.00 |
1,800.00 |
106,200.00 |
800.00 |
47,200.00 |
| 702-03-I |
catch basin (cb-sd02)
|
9   |
EACH |
4,100.00 |
36,900.00 |
5,200.00 |
46,800.00 |
4,800.00 |
43,200.00 |
5,000.00 |
45,000.00 |
| 702-04-A |
adjusting manholes
|
29   |
EACH |
200.00 |
5,800.00 |
450.00 |
13,050.00 |
600.00 |
17,400.00 |
600.00 |
17,400.00 |
| 702-04-B |
adjusting catch basins
|
4   |
EACH |
400.00 |
1,600.00 |
2,700.00 |
10,800.00 |
2,400.00 |
9,600.00 |
2,000.00 |
8,000.00 |
| 706-01-A |
concrete walk (4" thick)
|
4,781.8 |
SQYD |
35.10 |
167,841.18 |
35.00 |
167,363.00 |
30.00 |
143,454.00 |
32.00 |
153,017.60 |
| 706-01-C |
concrete walk (6" thick)
|
148.9 |
SQYD |
40.00 |
5,956.00 |
55.00 |
8,189.50 |
42.00 |
6,253.80 |
38.00 |
5,658.20 |
| 706-02-C |
concrete drive (6" thick)
|
1,558.5 |
SQYD |
39.70 |
61,872.45 |
55.00 |
85,717.50 |
42.00 |
65,457.00 |
38.00 |
59,223.00 |
| 707-03 |
combination concrete curb & gutter
|
3,162.8 |
LNFT |
14.50 |
45,860.60 |
15.00 |
47,442.00 |
28.00 |
88,558.40 |
18.00 |
56,930.40 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
42,000.00 |
42,000.00 |
30,000.00 |
30,000.00 |
42,000.00 |
42,000.00 |
70,000.00 |
70,000.00 |
| 713-02 |
temporary pavement markings
|
lump |
LUMP |
4,400.00 |
4,400.00 |
2,000.00 |
2,000.00 |
3,850.00 |
3,850.00 |
4,000.00 |
4,000.00 |
| 714-01 |
slab sodding
|
11,362   |
SQYD |
4.00 |
45,448.00 |
2.50 |
28,405.00 |
3.00 |
34,086.00 |
4.00 |
45,448.00 |
| 717-01 |
seeding
|
100   |
LB |
9.00 |
900.00 |
1.60 |
160.00 |
8.00 |
800.00 |
8.00 |
800.00 |
| 718-01 |
fertilizer
|
450   |
LB |
27.50 |
12,375.00 |
0.32 |
144.00 |
0.40 |
180.00 |
0.25 |
112.50 |
| 719-01-A |
plants (crape myrtle, 2.5" - 3.0" caliper)
|
22   |
EACH |
340.00 |
7,480.00 |
160.00 |
3,520.00 |
160.00 |
3,520.00 |
330.00 |
7,260.00 |
| 719-01-B |
plants (redbud, 2.5" - 3.0" caliper)
|
18   |
EACH |
412.50 |
7,425.00 |
160.00 |
2,880.00 |
275.00 |
4,950.00 |
380.00 |
6,840.00 |
| 719-01-C |
plants (drake elm, 3.0" - 3.5" caliper)
|
23   |
EACH |
510.00 |
11,730.00 |
300.00 |
6,900.00 |
318.00 |
7,314.00 |
500.00 |
11,500.00 |
| 719-01-D |
plants (daylily, 1 gal)
|
1,274   |
EACH |
6.90 |
8,790.60 |
5.00 |
6,370.00 |
3.50 |
4,459.00 |
6.50 |
8,281.00 |
| 719-01-E |
plants (coral bells azalea, 3 gal)
|
55   |
EACH |
12.40 |
682.00 |
13.00 |
715.00 |
14.00 |
770.00 |
12.00 |
660.00 |
| 719-01-F |
plants (dwarf barberry, 3 gal)
|
547   |
EACH |
13.75 |
7,521.25 |
13.00 |
7,111.00 |
12.90 |
7,056.30 |
13.00 |
7,111.00 |
| 719-01-G |
plants (helleri holly, 3 gal)
|
442   |
EACH |
13.75 |
6,077.50 |
13.00 |
5,746.00 |
12.90 |
5,701.80 |
13.00 |
5,746.00 |
| 719-01-H |
plants (indian hawthorn, 3 gal)
|
954   |
EACH |
13.75 |
13,117.50 |
13.00 |
12,402.00 |
10.75 |
10,255.50 |
13.00 |
12,402.00 |
| 719-01-I |
plants (sago palm, 15 gal)
|
19   |
EACH |
165.00 |
3,135.00 |
50.00 |
950.00 |
200.00 |
3,800.00 |
150.00 |
2,850.00 |
| 719-01-J |
plants (big blue liriope, 1 gal)
|
2,189   |
EACH |
3.85 |
8,427.65 |
3.00 |
6,567.00 |
2.25 |
4,925.25 |
3.50 |
7,661.50 |
| 719-01-K |
plants (liriope, 4" containers)
|
2,743   |
EACH |
1.45 |
3,977.35 |
1.50 |
4,114.50 |
1.40 |
3,840.20 |
1.30 |
3,565.90 |
| 719-02 |
top dressing mulch ( 4" depth)
|
2,195   |
SQYD |
3.30 |
7,243.50 |
4.00 |
8,780.00 |
4.20 |
9,219.00 |
3.00 |
6,585.00 |
| 719-03-A |
bed preparation (12" depth)
|
2,195   |
SQYD |
11.00 |
24,145.00 |
1.50 |
3,292.50 |
5.00 |
10,975.00 |
10.00 |
21,950.00 |
| 722-01 |
project site laboratory
|
1   |
EACH |
6,000.00 |
6,000.00 |
20,000.00 |
20,000.00 |
8,500.00 |
8,500.00 |
25,000.00 |
25,000.00 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
1,001   |
SQYD |
53.00 |
53,053.00 |
65.00 |
65,065.00 |
71.00 |
71,071.00 |
50.00 |
50,050.00 |
| 724-02 |
pavement widening
|
2,691.0 |
SQYD |
34.00 |
91,494.00 |
40.00 |
107,640.00 |
44.00 |
118,404.00 |
32.00 |
86,112.00 |
| 726-01 |
bedding material
|
77.3 |
CUYD |
50.00 |
3,865.00 |
65.00 |
5,024.50 |
62.00 |
4,792.60 |
80.00 |
6,184.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
215,000.00 |
215,000.00 |
237,000.00 |
237,000.00 |
200,000.00 |
200,000.00 |
280,000.00 |
280,000.00 |
| 730-05 |
light pole (20 feet long, concrete)
|
43   |
EACH |
2,425.00 |
104,275.00 |
2,700.00 |
116,100.00 |
2,500.00 |
107,500.00 |
2,400.00 |
103,200.00 |
| 730-07 |
luminaire (175 watt metal halide)
|
43   |
EACH |
1,170.00 |
50,310.00 |
1,500.00 |
64,500.00 |
1,990.00 |
85,570.00 |
1,100.00 |
47,300.00 |
| 730-08 |
electrical service point (120v)
|
1   |
EACH |
4,270.00 |
4,270.00 |
7,000.00 |
7,000.00 |
6,600.00 |
6,600.00 |
4,000.00 |
4,000.00 |
| 731-02 |
reflectorized raised pavement markers
|
265   |
EACH |
5.60 |
1,484.00 |
5.10 |
1,351.50 |
5.50 |
1,457.50 |
5.50 |
1,457.50 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
3.992 |
MILE |
2,170.00 |
8,662.64 |
2,000.00 |
7,984.00 |
2,000.00 |
7,984.00 |
2,000.00 |
7,984.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.996 |
MILE |
900.00 |
1,796.40 |
850.00 |
1,696.60 |
900.00 |
1,796.40 |
900.00 |
1,796.40 |
| 732-04-E |
plastic pavement legends & symbols (school crossing)
|
1   |
EACH |
480.00 |
480.00 |
450.00 |
450.00 |
550.00 |
550.00 |
500.00 |
500.00 |
| 735-01 |
mailboxes
|
70   |
ea |
2.00 |
140.00 |
1.00 |
70.00 |
75.00 |
5,250.00 |
1.00 |
70.00 |
| 735-02 |
mailbox supports (single)
|
70   |
ea |
105.00 |
7,350.00 |
110.00 |
7,700.00 |
115.00 |
8,050.00 |
100.00 |
7,000.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
26,000.00 |
26,000.00 |
20,000.00 |
20,000.00 |
60,000.00 |
60,000.00 |
80,000.00 |
80,000.00 |
| 741-09 |
adjusting water house connections
|
15   |
EACH |
260.00 |
3,900.00 |
220.00 |
3,300.00 |
200.00 |
3,000.00 |
400.00 |
6,000.00 |
| 741-10 |
adjusting water service lines
|
150   |
LNFT |
2.50 |
375.00 |
11.00 |
1,650.00 |
10.00 |
1,500.00 |
100.00 |
15,000.00 |
| 741-11 |
adjusting water valve and meter box
|
5   |
EACH |
100.00 |
500.00 |
110.00 |
550.00 |
100.00 |
500.00 |
400.00 |
2,000.00 |
| 742-01-A |
sanitary sewer pipe (4") (pvc)
|
80   |
LNFT |
6.00 |
480.00 |
28.00 |
2,240.00 |
25.00 |
2,000.00 |
50.00 |
4,000.00 |
| 742-01-B |
sanitary sewer pipe (8") (ductile iron)
|
48   |
LNFT |
25.00 |
1,200.00 |
55.00 |
2,640.00 |
50.00 |
2,400.00 |
50.00 |
2,400.00 |
| 742-02 |
adjusting sanitary sewer house connections
|
15   |
EACH |
270.00 |
4,050.00 |
330.00 |
4,950.00 |
300.00 |
4,500.00 |
900.00 |
13,500.00 |
| 742-03 |
adjusting sanitary sewer service lines
|
150   |
LNFT |
5.00 |
750.00 |
28.00 |
4,200.00 |
25.00 |
3,750.00 |
35.00 |
5,250.00 |
| 742-04 |
casing (8" steel with 0.25" wall thickness)
|
80   |
LNFT |
32.00 |
2,560.00 |
90.00 |
7,200.00 |
80.00 |
6,400.00 |
60.00 |
4,800.00 |
| S-001 |
drip irrigation system
|
lump |
lump |
33,000.00 |
33,000.00 |
32,000.00 |
32,000.00 |
85,000.00 |
85,000.00 |
30,000.00 |
30,000.00 |
| S-002 |
tree trimming & root pruning
|
lump |
lump |
13,000.00 |
13,000.00 |
8,500.00 |
8,500.00 |
28,500.00 |
28,500.00 |
30,000.00 |
30,000.00 |
| S-003 |
paved gutter drain
|
28   |
EACH |
150.00 |
4,200.00 |
2,000.00 |
56,000.00 |
500.00 |
14,000.00 |
1,500.00 |
42,000.00 |
| S-004 |
electrical lines (e1 and e2) (1 1/2" direct buried pvc
conduit with 2 #4, & 1 #8g) |
5,000   |
LNFT |
9.35 |
46,750.00 |
12.00 |
60,000.00 |
9.00 |
45,000.00 |
9.00 |
45,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,918,244.82 |
|
3,218,389.10 |
|
3,245,809.80 |
|
3,526,676.00 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - CIRCLE, INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
42,919.77 |
42,919.77 |
|
|
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
26,300.00 |
26,300.00 |
|
|
|
|
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
418   |
SQYD |
18.00 |
7,524.00 |
|
|
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
1,019   |
SQYD |
11.00 |
11,209.00 |
|
|
|
|
|
|
| 202-02-E |
removal of concrete curbs
|
24.0 |
LNFT |
4.00 |
96.00 |
|
|
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
1,855.0 |
SQYD |
18.00 |
33,390.00 |
|
|
|
|
|
|
| 202-03-A |
relocation of mailbox and support
|
1   |
EACH |
60.00 |
60.00 |
|
|
|
|
|
|
| 202-03-B |
relocation of air release valve
|
1   |
EACH |
2,000.00 |
2,000.00 |
|
|
|
|
|
|
| 202-03-C |
relocation of gas valve
|
1   |
EACH |
3,000.00 |
3,000.00 |
|
|
|
|
|
|
| 203-05 |
nonplastic embankment
|
512   |
CUYD |
12.50 |
6,400.00 |
|
|
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
45,000.00 |
45,000.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
48   |
CUYD |
50.00 |
2,400.00 |
|
|
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
300.0 |
CUYD |
43.00 |
12,900.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
6,665.8 |
TON |
65.65 |
437,609.77 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
1,337.9 |
TON |
100.00 |
133,790.00 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
24,929   |
SQYD |
2.10 |
52,350.90 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,385   |
CUYD |
6.00 |
- 8,310.00 |
|
|
|
|
|
|
| 601-01-G |
portland cement concrete pavement (8" thick)
|
265.0 |
SQYD |
85.00 |
22,525.00 |
|
|
|
|
|
|
| 701-02-E |
cross drain pipe arch (30" equiv. rcpa)
|
94   |
LNFT |
94.00 |
8,836.00 |
|
|
|
|
|
|
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
1,129   |
LNFT |
45.00 |
50,805.00 |
|
|
|
|
|
|
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
2,970   |
LNFT |
53.00 |
157,410.00 |
|
|
|
|
|
|
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
1,271   |
LNFT |
73.00 |
92,783.00 |
|
|
|
|
|
|
| 701-03-K |
storm drain pipe (30" rcp/pcp)
|
798   |
LNFT |
91.00 |
72,618.00 |
|
|
|
|
|
|
| 701-03-M |
storm drain pipe (36" rcp/pcp)
|
36   |
LNFT |
125.00 |
4,500.00 |
|
|
|
|
|
|
| 701-03-N |
storm drain pipe (42" rcp/pcp)
|
20   |
LNFT |
206.00 |
4,120.00 |
|
|
|
|
|
|
| 701-03-O |
storm drain pipe (48" rcp/pcp)
|
1,110   |
LNFT |
213.00 |
236,430.00 |
|
|
|
|
|
|
| 701-04-B |
storm drain pipe arch (18" equiv. rcpa)
|
103   |
LNFT |
59.00 |
6,077.00 |
|
|
|
|
|
|
| 701-04-D |
storm drain pipe arch (24" equiv. rcpa)
|
375   |
LNFT |
75.00 |
28,125.00 |
|
|
|
|
|
|
| 701-04-E |
storm drain pipe arch (30" equiv. rcpa)
|
679   |
LNFT |
97.00 |
65,863.00 |
|
|
|
|
|
|
| 701-04-F |
storm drain pipe arch (36" equiv. rcpa)
|
166   |
LNFT |
131.00 |
21,746.00 |
|
|
|
|
|
|
| 701-04-H |
storm drain pipe arch (48" equiv. rcpa)
|
431   |
LNFT |
200.00 |
86,200.00 |
|
|
|
|
|
|
| 701-05-G |
side drain pipe (18")
|
433   |
LNFT |
51.00 |
22,083.00 |
|
|
|
|
|
|
| 701-07-C |
yard drain pipe (8")
|
849   |
LNFT |
12.00 |
10,188.00 |
|
|
|
|
|
|
| 701-09 |
fabricating pipe fittings
|
2   |
EACH |
2,200.00 |
4,400.00 |
|
|
|
|
|
|
| 701-14 |
cleaning existing pipes
|
1,005   |
LNFT |
11.00 |
11,055.00 |
|
|
|
|
|
|
| 701-15 |
concrete collar
|
3   |
EACH |
1,500.00 |
4,500.00 |
|
|
|
|
|
|
| 702-02-B |
manholes (r-cb-11)
|
12   |
EACH |
2,800.00 |
33,600.00 |
|
|
|
|
|
|
| 702-02-C |
manholes (r-cb-11 mod)
|
12   |
EACH |
4,050.00 |
48,600.00 |
|
|
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
81   |
EACH |
2,782.00 |
225,342.00 |
|
|
|
|
|
|
| 702-03-B |
catch basins (cb-02)
|
12   |
EACH |
2,950.00 |
35,400.00 |
|
|
|
|
|
|
| 702-03-C |
catch basins (cb-06)
|
6   |
EACH |
3,500.00 |
21,000.00 |
|
|
|
|
|
|
| 702-03-H |
catch basins (cb-05)
|
59   |
EACH |
900.00 |
53,100.00 |
|
|
|
|
|
|
| 702-03-I |
catch basin (cb-sd02)
|
9   |
EACH |
3,700.00 |
33,300.00 |
|
|
|
|
|
|
| 702-04-A |
adjusting manholes
|
29   |
EACH |
725.00 |
21,025.00 |
|
|
|
|
|
|
| 702-04-B |
adjusting catch basins
|
4   |
EACH |
1,100.00 |
4,400.00 |
|
|
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
4,781.8 |
SQYD |
50.00 |
239,090.00 |
|
|
|
|
|
|
| 706-01-C |
concrete walk (6" thick)
|
148.9 |
SQYD |
61.25 |
9,120.12 |
|
|
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
1,558.5 |
SQYD |
65.10 |
101,458.35 |
|
|
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
3,162.8 |
LNFT |
11.20 |
35,423.36 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
79,000.00 |
79,000.00 |
|
|
|
|
|
|
| 713-02 |
temporary pavement markings
|
lump |
LUMP |
7,250.00 |
7,250.00 |
|
|
|
|
|
|
| 714-01 |
slab sodding
|
11,362   |
SQYD |
5.00 |
56,810.00 |
|
|
|
|
|
|
| 717-01 |
seeding
|
100   |
LB |
8.00 |
800.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
450   |
LB |
1.00 |
450.00 |
|
|
|
|
|
|
| 719-01-A |
plants (crape myrtle, 2.5" - 3.0" caliper)
|
22   |
EACH |
375.00 |
8,250.00 |
|
|
|
|
|
|
| 719-01-B |
plants (redbud, 2.5" - 3.0" caliper)
|
18   |
EACH |
450.00 |
8,100.00 |
|
|
|
|
|
|
| 719-01-C |
plants (drake elm, 3.0" - 3.5" caliper)
|
23   |
EACH |
558.00 |
12,834.00 |
|
|
|
|
|
|
| 719-01-D |
plants (daylily, 1 gal)
|
1,274   |
EACH |
7.50 |
9,555.00 |
|
|
|
|
|
|
| 719-01-E |
plants (coral bells azalea, 3 gal)
|
55   |
EACH |
13.50 |
742.50 |
|
|
|
|
|
|
| 719-01-F |
plants (dwarf barberry, 3 gal)
|
547   |
EACH |
15.00 |
8,205.00 |
|
|
|
|
|
|
| 719-01-G |
plants (helleri holly, 3 gal)
|
442   |
EACH |
15.00 |
6,630.00 |
|
|
|
|
|
|
| 719-01-H |
plants (indian hawthorn, 3 gal)
|
954   |
EACH |
15.00 |
14,310.00 |
|
|
|
|
|
|
| 719-01-I |
plants (sago palm, 15 gal)
|
19   |
EACH |
180.00 |
3,420.00 |
|
|
|
|
|
|
| 719-01-J |
plants (big blue liriope, 1 gal)
|
2,189   |
EACH |
4.25 |
9,303.25 |
|
|
|
|
|
|
| 719-01-K |
plants (liriope, 4" containers)
|
2,743   |
EACH |
1.60 |
4,388.80 |
|
|
|
|
|
|
| 719-02 |
top dressing mulch ( 4" depth)
|
2,195   |
SQYD |
3.60 |
7,902.00 |
|
|
|
|
|
|
| 719-03-A |
bed preparation (12" depth)
|
2,195   |
SQYD |
12.00 |
26,340.00 |
|
|
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
12,000.00 |
12,000.00 |
|
|
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
1,001   |
SQYD |
53.00 |
53,053.00 |
|
|
|
|
|
|
| 724-02 |
pavement widening
|
2,691.0 |
SQYD |
18.00 |
48,438.00 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
77.3 |
CUYD |
45.00 |
3,478.50 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
110,000.00 |
110,000.00 |
|
|
|
|
|
|
| 730-05 |
light pole (20 feet long, concrete)
|
43   |
EACH |
2,770.00 |
119,110.00 |
|
|
|
|
|
|
| 730-07 |
luminaire (175 watt metal halide)
|
43   |
EACH |
1,300.00 |
55,900.00 |
|
|
|
|
|
|
| 730-08 |
electrical service point (120v)
|
1   |
EACH |
6,500.00 |
6,500.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
265   |
EACH |
6.15 |
1,629.75 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
3.992 |
MILE |
2,390.00 |
9,540.88 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.996 |
MILE |
990.00 |
1,976.04 |
|
|
|
|
|
|
| 732-04-E |
plastic pavement legends & symbols (school crossing)
|
1   |
EACH |
530.00 |
530.00 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
70   |
ea |
6.00 |
420.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
70   |
ea |
126.00 |
8,820.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
96,000.00 |
96,000.00 |
|
|
|
|
|
|
| 741-09 |
adjusting water house connections
|
15   |
EACH |
550.00 |
8,250.00 |
|
|
|
|
|
|
| 741-10 |
adjusting water service lines
|
150   |
LNFT |
14.00 |
2,100.00 |
|
|
|
|
|
|
| 741-11 |
adjusting water valve and meter box
|
5   |
EACH |
420.00 |
2,100.00 |
|
|
|
|
|
|
| 742-01-A |
sanitary sewer pipe (4") (pvc)
|
80   |
LNFT |
12.50 |
1,000.00 |
|
|
|
|
|
|
| 742-01-B |
sanitary sewer pipe (8") (ductile iron)
|
48   |
LNFT |
60.00 |
2,880.00 |
|
|
|
|
|
|
| 742-02 |
adjusting sanitary sewer house connections
|
15   |
EACH |
470.00 |
7,050.00 |
|
|
|
|
|
|
| 742-03 |
adjusting sanitary sewer service lines
|
150   |
LNFT |
29.00 |
4,350.00 |
|
|
|
|
|
|
| 742-04 |
casing (8" steel with 0.25" wall thickness)
|
80   |
LNFT |
14.00 |
1,120.00 |
|
|
|
|
|
|
| S-001 |
drip irrigation system
|
lump |
lump |
39,700.00 |
39,700.00 |
|
|
|
|
|
|
| S-002 |
tree trimming & root pruning
|
lump |
lump |
32,000.00 |
32,000.00 |
|
|
|
|
|
|
| S-003 |
paved gutter drain
|
28   |
EACH |
1,000.00 |
28,000.00 |
|
|
|
|
|
|
| S-004 |
electrical lines (e1 and e2) (1 1/2" direct buried pvc
conduit with 2 #4, & 1 #8g) |
5,000   |
LNFT |
10.00 |
50,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,549,998.99 |
|
|
|
|
|
|
|