Letting of 12/15/2004 LA DOTD Headquarters


READV
go back
Go Back
 
Lead Project: 281-02-0010
Parish: ST TAMMANY
Routes: LA 1087
Description: CAUSEWAY - US 190
Type Const: grading, cold planing asph pvmt, drain struct, superpave asphaltic concrete ovly,
pccp, sidewalks, landscaping, lighting, and related work
 
RankLicenseBidderAmount
112198 BYRON E. TALBOT CONTRACTOR, INC. $2,918,244.82
202179 BOH BROS. CONSTRUCTION CO., LLC. $3,218,389.10
316378 MCDONALD CONST. INC. OF SLIDELL $3,245,809.80
406276 BARRIERE CONSTRUCTION CO., LLC. $3,526,676.00
502074 CIRCLE, INC. $3,549,998.99
 
Item Number Item Description Quantity Unit of Measure - 1 -
BYRON E. TALBOT CONTRACTOR, INC.
- 2 -
BOH BROS. CONSTRUCTION CO., LLC.
- 3 -
MCDONALD CONST. INC. OF SLIDELL
- 4 -
BARRIERE CONSTRUCTION CO., LLC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 15,000.00 15,000.00 5,000.00 5,000.00 42,000.00 42,000.00 10,000.00 10,000.00
202-01 removal of structures & obstructions lump      LUMP 20,000.00 20,000.00 25,000.00 25,000.00 20,000.00 20,000.00 80,000.00 80,000.00
202-02-C removal of portland cement concrete pavement 418      SQYD 6.60 2,758.80 15.00 6,270.00 10.00 4,180.00 10.00 4,180.00
202-02-D removal of concrete walks & drives 1,019      SQYD 5.30 5,400.70 6.00 6,114.00 5.50 5,604.50 10.00 10,190.00
202-02-E removal of concrete curbs 24.0    LNFT 2.50 60.00 15.00 360.00 5.00 120.00 5.00 120.00
202-02-G removal of surfacing & stabilized base 1,855.0    SQYD 6.30 11,686.50 6.00 11,130.00 5.00 9,275.00 5.00 9,275.00
202-03-A relocation of mailbox and support 1      EACH 200.00 200.00 100.00 100.00 200.00 200.00 150.00 150.00
202-03-B relocation of air release valve 1      EACH 400.00 400.00 2,500.00 2,500.00 2,200.00 2,200.00 1,500.00 1,500.00
202-03-C relocation of gas valve 1      EACH 800.00 800.00 2,200.00 2,200.00 3,500.00 3,500.00 3,000.00 3,000.00
203-05 nonplastic embankment 512      CUYD 11.50 5,888.00 20.00 10,240.00 12.00 6,144.00 20.00 10,240.00
203-06 excavation & embankment lump      LUMP 98,500.00 98,500.00 40,000.00 40,000.00 45,000.00 45,000.00 80,000.00 80,000.00
401-02 aggregate surface course (adjusted vehicular
measurement)
48      CUYD 50.00 2,400.00 50.00 2,400.00 44.00 2,112.00 60.00 2,880.00
402-01 traffic maintenance aggregate (vehicular measurement) 300.0    CUYD 37.00 11,100.00 42.00 12,600.00 48.00 14,400.00 35.00 10,500.00
502-01 superpave asphaltic concrete 6,665.8    TON 60.00 399,948.00 55.00 366,619.00 60.00 399,948.00 56.00 373,284.80
502-01-A superpave asphaltic concrete, paved drives and
turnouts
1,337.9    TON 99.00 132,452.10 75.00 100,342.50 82.00 109,707.80 93.00 124,424.70
509-01 cold planing asphaltic pavement 24,929      SQYD 1.70 42,379.30 2.00 49,858.00 2.25 56,090.25 1.50 37,393.50
509-02 contractor retained reclaimed asphaltic pavement - 1,385      CUYD 3.00 - 4,155.00 11.00 - 15,235.00 10.00 - 13,850.00 6.00 - 8,310.00
601-01-G portland cement concrete pavement (8" thick) 265.0    SQYD 41.00 10,865.00 65.00 17,225.00 50.00 13,250.00 45.00 11,925.00
701-02-E cross drain pipe arch (30" equiv. rcpa) 94      LNFT 94.00 8,836.00 100.00 9,400.00 89.00 8,366.00 140.00 13,160.00
701-03-F storm drain pipe (15" rcp/pcp) 1,129      LNFT 29.50 33,305.50 46.00 51,934.00 42.00 47,418.00 45.00 50,805.00
701-03-G storm drain pipe (18" rcp/pcp) 2,970      LNFT 33.70 100,089.00 52.00 154,440.00 48.00 142,560.00 50.00 148,500.00
701-03-I storm drain pipe (24" rcp/pcp) 1,271      LNFT 50.80 64,566.80 60.00 76,260.00 54.00 68,634.00 80.00 101,680.00
701-03-K storm drain pipe (30" rcp/pcp) 798      LNFT 68.50 54,663.00 93.00 74,214.00 85.00 67,830.00 100.00 79,800.00
701-03-M storm drain pipe (36" rcp/pcp) 36      LNFT 100.00 3,600.00 115.00 4,140.00 105.00 3,780.00 140.00 5,040.00
701-03-N storm drain pipe (42" rcp/pcp) 20      LNFT 150.00 3,000.00 132.00 2,640.00 120.00 2,400.00 160.00 3,200.00
701-03-O storm drain pipe (48" rcp/pcp) 1,110      LNFT 140.00 155,400.00 140.00 155,400.00 125.00 138,750.00 170.00 188,700.00
701-04-B storm drain pipe arch (18" equiv. rcpa) 103      LNFT 45.00 4,635.00 57.00 5,871.00 52.00 5,356.00 55.00 5,665.00
701-04-D storm drain pipe arch (24" equiv. rcpa) 375      LNFT 52.00 19,500.00 63.00 23,625.00 57.00 21,375.00 70.00 26,250.00
701-04-E storm drain pipe arch (30" equiv. rcpa) 679      LNFT 77.00 52,283.00 100.00 67,900.00 92.00 62,468.00 90.00 61,110.00
701-04-F storm drain pipe arch (36" equiv. rcpa) 166      LNFT 101.00 16,766.00 120.00 19,920.00 110.00 18,260.00 120.00 19,920.00
701-04-H storm drain pipe arch (48" equiv. rcpa) 431      LNFT 135.00 58,185.00 140.00 60,340.00 128.00 55,168.00 180.00 77,580.00
701-05-G side drain pipe (18") 433      LNFT 34.00 14,722.00 53.00 22,949.00 48.00 20,784.00 55.00 23,815.00
701-07-C yard drain pipe (8") 849      LNFT 15.50 13,159.50 20.00 16,980.00 16.50 14,008.50 28.00 23,772.00
701-09 fabricating pipe fittings 2      EACH 2,600.00 5,200.00 3,100.00 6,200.00 2,800.00 5,600.00 3,500.00 7,000.00
701-14 cleaning existing pipes 1,005      LNFT 10.00 10,050.00 4.40 4,422.00 4.00 4,020.00 4.00 4,020.00
701-15 concrete collar 3      EACH 300.00 900.00 500.00 1,500.00 450.00 1,350.00 1,500.00 4,500.00
702-02-B manholes (r-cb-11) 12      EACH 1,400.00 16,800.00 3,500.00 42,000.00 3,200.00 38,400.00 3,500.00 42,000.00
702-02-C manholes (r-cb-11 mod) 12      EACH 2,700.00 32,400.00 4,100.00 49,200.00 3,800.00 45,600.00 3,800.00 45,600.00
702-03-A catch basins (cb-01) 81      EACH 2,100.00 170,100.00 2,300.00 186,300.00 2,100.00 170,100.00 3,000.00 243,000.00
702-03-B catch basins (cb-02) 12      EACH 3,000.00 36,000.00 3,300.00 39,600.00 3,000.00 36,000.00 4,500.00 54,000.00
702-03-C catch basins (cb-06) 6      EACH 2,100.00 12,600.00 4,700.00 28,200.00 4,300.00 25,800.00 3,500.00 21,000.00
702-03-H catch basins (cb-05) 59      EACH 850.00 50,150.00 2,000.00 118,000.00 1,800.00 106,200.00 800.00 47,200.00
702-03-I catch basin (cb-sd02) 9      EACH 4,100.00 36,900.00 5,200.00 46,800.00 4,800.00 43,200.00 5,000.00 45,000.00
702-04-A adjusting manholes 29      EACH 200.00 5,800.00 450.00 13,050.00 600.00 17,400.00 600.00 17,400.00
702-04-B adjusting catch basins 4      EACH 400.00 1,600.00 2,700.00 10,800.00 2,400.00 9,600.00 2,000.00 8,000.00
706-01-A concrete walk (4" thick) 4,781.8    SQYD 35.10 167,841.18 35.00 167,363.00 30.00 143,454.00 32.00 153,017.60
706-01-C concrete walk (6" thick) 148.9    SQYD 40.00 5,956.00 55.00 8,189.50 42.00 6,253.80 38.00 5,658.20
706-02-C concrete drive (6" thick) 1,558.5    SQYD 39.70 61,872.45 55.00 85,717.50 42.00 65,457.00 38.00 59,223.00
707-03 combination concrete curb & gutter 3,162.8    LNFT 14.50 45,860.60 15.00 47,442.00 28.00 88,558.40 18.00 56,930.40
713-01 temporary signs & barricades lump      LUMP 42,000.00 42,000.00 30,000.00 30,000.00 42,000.00 42,000.00 70,000.00 70,000.00
713-02 temporary pavement markings lump      LUMP 4,400.00 4,400.00 2,000.00 2,000.00 3,850.00 3,850.00 4,000.00 4,000.00
714-01 slab sodding 11,362      SQYD 4.00 45,448.00 2.50 28,405.00 3.00 34,086.00 4.00 45,448.00
717-01 seeding 100      LB 9.00 900.00 1.60 160.00 8.00 800.00 8.00 800.00
718-01 fertilizer 450      LB 27.50 12,375.00 0.32 144.00 0.40 180.00 0.25 112.50
719-01-A plants (crape myrtle, 2.5" - 3.0" caliper) 22      EACH 340.00 7,480.00 160.00 3,520.00 160.00 3,520.00 330.00 7,260.00
719-01-B plants (redbud, 2.5" - 3.0" caliper) 18      EACH 412.50 7,425.00 160.00 2,880.00 275.00 4,950.00 380.00 6,840.00
719-01-C plants (drake elm, 3.0" - 3.5" caliper) 23      EACH 510.00 11,730.00 300.00 6,900.00 318.00 7,314.00 500.00 11,500.00
719-01-D plants (daylily, 1 gal) 1,274      EACH 6.90 8,790.60 5.00 6,370.00 3.50 4,459.00 6.50 8,281.00
719-01-E plants (coral bells azalea, 3 gal) 55      EACH 12.40 682.00 13.00 715.00 14.00 770.00 12.00 660.00
719-01-F plants (dwarf barberry, 3 gal) 547      EACH 13.75 7,521.25 13.00 7,111.00 12.90 7,056.30 13.00 7,111.00
719-01-G plants (helleri holly, 3 gal) 442      EACH 13.75 6,077.50 13.00 5,746.00 12.90 5,701.80 13.00 5,746.00
719-01-H plants (indian hawthorn, 3 gal) 954      EACH 13.75 13,117.50 13.00 12,402.00 10.75 10,255.50 13.00 12,402.00
719-01-I plants (sago palm, 15 gal) 19      EACH 165.00 3,135.00 50.00 950.00 200.00 3,800.00 150.00 2,850.00
719-01-J plants (big blue liriope, 1 gal) 2,189      EACH 3.85 8,427.65 3.00 6,567.00 2.25 4,925.25 3.50 7,661.50
719-01-K plants (liriope, 4" containers) 2,743      EACH 1.45 3,977.35 1.50 4,114.50 1.40 3,840.20 1.30 3,565.90
719-02 top dressing mulch ( 4" depth) 2,195      SQYD 3.30 7,243.50 4.00 8,780.00 4.20 9,219.00 3.00 6,585.00
719-03-A bed preparation (12" depth) 2,195      SQYD 11.00 24,145.00 1.50 3,292.50 5.00 10,975.00 10.00 21,950.00
722-01 project site laboratory 1      EACH 6,000.00 6,000.00 20,000.00 20,000.00 8,500.00 8,500.00 25,000.00 25,000.00
724-01-B pavement patching (12" minimum thickness) 1,001      SQYD 53.00 53,053.00 65.00 65,065.00 71.00 71,071.00 50.00 50,050.00
724-02 pavement widening 2,691.0    SQYD 34.00 91,494.00 40.00 107,640.00 44.00 118,404.00 32.00 86,112.00
726-01 bedding material 77.3    CUYD 50.00 3,865.00 65.00 5,024.50 62.00 4,792.60 80.00 6,184.00
727-01 mobilization lump      LUMP 215,000.00 215,000.00 237,000.00 237,000.00 200,000.00 200,000.00 280,000.00 280,000.00
730-05 light pole (20 feet long, concrete) 43      EACH 2,425.00 104,275.00 2,700.00 116,100.00 2,500.00 107,500.00 2,400.00 103,200.00
730-07 luminaire (175 watt metal halide) 43      EACH 1,170.00 50,310.00 1,500.00 64,500.00 1,990.00 85,570.00 1,100.00 47,300.00
730-08 electrical service point (120v) 1      EACH 4,270.00 4,270.00 7,000.00 7,000.00 6,600.00 6,600.00 4,000.00 4,000.00
731-02 reflectorized raised pavement markers 265      EACH 5.60 1,484.00 5.10 1,351.50 5.50 1,457.50 5.50 1,457.50
732-02-A plastic pavement striping (solid line) (4" width) 3.992  MILE 2,170.00 8,662.64 2,000.00 7,984.00 2,000.00 7,984.00 2,000.00 7,984.00
732-03-A plastic pavement striping (broken line)(4" width) 1.996  MILE 900.00 1,796.40 850.00 1,696.60 900.00 1,796.40 900.00 1,796.40
732-04-E plastic pavement legends & symbols (school crossing) 1      EACH 480.00 480.00 450.00 450.00 550.00 550.00 500.00 500.00
735-01 mailboxes 70      ea 2.00 140.00 1.00 70.00 75.00 5,250.00 1.00 70.00
735-02 mailbox supports (single) 70      ea 105.00 7,350.00 110.00 7,700.00 115.00 8,050.00 100.00 7,000.00
740-01 construction layout lump      LUMP 26,000.00 26,000.00 20,000.00 20,000.00 60,000.00 60,000.00 80,000.00 80,000.00
741-09 adjusting water house connections 15      EACH 260.00 3,900.00 220.00 3,300.00 200.00 3,000.00 400.00 6,000.00
741-10 adjusting water service lines 150      LNFT 2.50 375.00 11.00 1,650.00 10.00 1,500.00 100.00 15,000.00
741-11 adjusting water valve and meter box 5      EACH 100.00 500.00 110.00 550.00 100.00 500.00 400.00 2,000.00
742-01-A sanitary sewer pipe (4") (pvc) 80      LNFT 6.00 480.00 28.00 2,240.00 25.00 2,000.00 50.00 4,000.00
742-01-B sanitary sewer pipe (8") (ductile iron) 48      LNFT 25.00 1,200.00 55.00 2,640.00 50.00 2,400.00 50.00 2,400.00
742-02 adjusting sanitary sewer house connections 15      EACH 270.00 4,050.00 330.00 4,950.00 300.00 4,500.00 900.00 13,500.00
742-03 adjusting sanitary sewer service lines 150      LNFT 5.00 750.00 28.00 4,200.00 25.00 3,750.00 35.00 5,250.00
742-04 casing (8" steel with 0.25" wall thickness) 80      LNFT 32.00 2,560.00 90.00 7,200.00 80.00 6,400.00 60.00 4,800.00
S-001 drip irrigation system lump      lump 33,000.00 33,000.00 32,000.00 32,000.00 85,000.00 85,000.00 30,000.00 30,000.00
S-002 tree trimming & root pruning lump      lump 13,000.00 13,000.00 8,500.00 8,500.00 28,500.00 28,500.00 30,000.00 30,000.00
S-003 paved gutter drain 28      EACH 150.00 4,200.00 2,000.00 56,000.00 500.00 14,000.00 1,500.00 42,000.00
S-004 electrical lines (e1 and e2) (1 1/2" direct buried pvc
conduit with 2 #4, & 1 #8g)
5,000      LNFT 9.35 46,750.00 12.00 60,000.00 9.00 45,000.00 9.00 45,000.00
                       
 CONTRACTOR TOTAL       2,918,244.82   3,218,389.10   3,245,809.80   3,526,676.00
 
Item Number Item Description Quantity Unit of Measure - 5 -
CIRCLE, INC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 42,919.77 42,919.77            
202-01 removal of structures & obstructions lump      LUMP 26,300.00 26,300.00            
202-02-C removal of portland cement concrete pavement 418      SQYD 18.00 7,524.00            
202-02-D removal of concrete walks & drives 1,019      SQYD 11.00 11,209.00            
202-02-E removal of concrete curbs 24.0    LNFT 4.00 96.00            
202-02-G removal of surfacing & stabilized base 1,855.0    SQYD 18.00 33,390.00            
202-03-A relocation of mailbox and support 1      EACH 60.00 60.00            
202-03-B relocation of air release valve 1      EACH 2,000.00 2,000.00            
202-03-C relocation of gas valve 1      EACH 3,000.00 3,000.00            
203-05 nonplastic embankment 512      CUYD 12.50 6,400.00            
203-06 excavation & embankment lump      LUMP 45,000.00 45,000.00            
401-02 aggregate surface course (adjusted vehicular
measurement)
48      CUYD 50.00 2,400.00            
402-01 traffic maintenance aggregate (vehicular measurement) 300.0    CUYD 43.00 12,900.00            
502-01 superpave asphaltic concrete 6,665.8    TON 65.65 437,609.77            
502-01-A superpave asphaltic concrete, paved drives and
turnouts
1,337.9    TON 100.00 133,790.00            
509-01 cold planing asphaltic pavement 24,929      SQYD 2.10 52,350.90            
509-02 contractor retained reclaimed asphaltic pavement - 1,385      CUYD 6.00 - 8,310.00            
601-01-G portland cement concrete pavement (8" thick) 265.0    SQYD 85.00 22,525.00            
701-02-E cross drain pipe arch (30" equiv. rcpa) 94      LNFT 94.00 8,836.00            
701-03-F storm drain pipe (15" rcp/pcp) 1,129      LNFT 45.00 50,805.00            
701-03-G storm drain pipe (18" rcp/pcp) 2,970      LNFT 53.00 157,410.00            
701-03-I storm drain pipe (24" rcp/pcp) 1,271      LNFT 73.00 92,783.00            
701-03-K storm drain pipe (30" rcp/pcp) 798      LNFT 91.00 72,618.00            
701-03-M storm drain pipe (36" rcp/pcp) 36      LNFT 125.00 4,500.00            
701-03-N storm drain pipe (42" rcp/pcp) 20      LNFT 206.00 4,120.00            
701-03-O storm drain pipe (48" rcp/pcp) 1,110      LNFT 213.00 236,430.00            
701-04-B storm drain pipe arch (18" equiv. rcpa) 103      LNFT 59.00 6,077.00            
701-04-D storm drain pipe arch (24" equiv. rcpa) 375      LNFT 75.00 28,125.00            
701-04-E storm drain pipe arch (30" equiv. rcpa) 679      LNFT 97.00 65,863.00            
701-04-F storm drain pipe arch (36" equiv. rcpa) 166      LNFT 131.00 21,746.00            
701-04-H storm drain pipe arch (48" equiv. rcpa) 431      LNFT 200.00 86,200.00            
701-05-G side drain pipe (18") 433      LNFT 51.00 22,083.00            
701-07-C yard drain pipe (8") 849      LNFT 12.00 10,188.00            
701-09 fabricating pipe fittings 2      EACH 2,200.00 4,400.00            
701-14 cleaning existing pipes 1,005      LNFT 11.00 11,055.00            
701-15 concrete collar 3      EACH 1,500.00 4,500.00            
702-02-B manholes (r-cb-11) 12      EACH 2,800.00 33,600.00            
702-02-C manholes (r-cb-11 mod) 12      EACH 4,050.00 48,600.00            
702-03-A catch basins (cb-01) 81      EACH 2,782.00 225,342.00            
702-03-B catch basins (cb-02) 12      EACH 2,950.00 35,400.00            
702-03-C catch basins (cb-06) 6      EACH 3,500.00 21,000.00            
702-03-H catch basins (cb-05) 59      EACH 900.00 53,100.00            
702-03-I catch basin (cb-sd02) 9      EACH 3,700.00 33,300.00            
702-04-A adjusting manholes 29      EACH 725.00 21,025.00            
702-04-B adjusting catch basins 4      EACH 1,100.00 4,400.00            
706-01-A concrete walk (4" thick) 4,781.8    SQYD 50.00 239,090.00            
706-01-C concrete walk (6" thick) 148.9    SQYD 61.25 9,120.12            
706-02-C concrete drive (6" thick) 1,558.5    SQYD 65.10 101,458.35            
707-03 combination concrete curb & gutter 3,162.8    LNFT 11.20 35,423.36            
713-01 temporary signs & barricades lump      LUMP 79,000.00 79,000.00            
713-02 temporary pavement markings lump      LUMP 7,250.00 7,250.00            
714-01 slab sodding 11,362      SQYD 5.00 56,810.00            
717-01 seeding 100      LB 8.00 800.00            
718-01 fertilizer 450      LB 1.00 450.00            
719-01-A plants (crape myrtle, 2.5" - 3.0" caliper) 22      EACH 375.00 8,250.00            
719-01-B plants (redbud, 2.5" - 3.0" caliper) 18      EACH 450.00 8,100.00            
719-01-C plants (drake elm, 3.0" - 3.5" caliper) 23      EACH 558.00 12,834.00            
719-01-D plants (daylily, 1 gal) 1,274      EACH 7.50 9,555.00            
719-01-E plants (coral bells azalea, 3 gal) 55      EACH 13.50 742.50            
719-01-F plants (dwarf barberry, 3 gal) 547      EACH 15.00 8,205.00            
719-01-G plants (helleri holly, 3 gal) 442      EACH 15.00 6,630.00            
719-01-H plants (indian hawthorn, 3 gal) 954      EACH 15.00 14,310.00            
719-01-I plants (sago palm, 15 gal) 19      EACH 180.00 3,420.00            
719-01-J plants (big blue liriope, 1 gal) 2,189      EACH 4.25 9,303.25            
719-01-K plants (liriope, 4" containers) 2,743      EACH 1.60 4,388.80            
719-02 top dressing mulch ( 4" depth) 2,195      SQYD 3.60 7,902.00            
719-03-A bed preparation (12" depth) 2,195      SQYD 12.00 26,340.00            
722-01 project site laboratory 1      EACH 12,000.00 12,000.00            
724-01-B pavement patching (12" minimum thickness) 1,001      SQYD 53.00 53,053.00            
724-02 pavement widening 2,691.0    SQYD 18.00 48,438.00            
726-01 bedding material 77.3    CUYD 45.00 3,478.50            
727-01 mobilization lump      LUMP 110,000.00 110,000.00            
730-05 light pole (20 feet long, concrete) 43      EACH 2,770.00 119,110.00            
730-07 luminaire (175 watt metal halide) 43      EACH 1,300.00 55,900.00            
730-08 electrical service point (120v) 1      EACH 6,500.00 6,500.00            
731-02 reflectorized raised pavement markers 265      EACH 6.15 1,629.75            
732-02-A plastic pavement striping (solid line) (4" width) 3.992  MILE 2,390.00 9,540.88            
732-03-A plastic pavement striping (broken line)(4" width) 1.996  MILE 990.00 1,976.04            
732-04-E plastic pavement legends & symbols (school crossing) 1      EACH 530.00 530.00            
735-01 mailboxes 70      ea 6.00 420.00            
735-02 mailbox supports (single) 70      ea 126.00 8,820.00            
740-01 construction layout lump      LUMP 96,000.00 96,000.00            
741-09 adjusting water house connections 15      EACH 550.00 8,250.00            
741-10 adjusting water service lines 150      LNFT 14.00 2,100.00            
741-11 adjusting water valve and meter box 5      EACH 420.00 2,100.00            
742-01-A sanitary sewer pipe (4") (pvc) 80      LNFT 12.50 1,000.00            
742-01-B sanitary sewer pipe (8") (ductile iron) 48      LNFT 60.00 2,880.00            
742-02 adjusting sanitary sewer house connections 15      EACH 470.00 7,050.00            
742-03 adjusting sanitary sewer service lines 150      LNFT 29.00 4,350.00            
742-04 casing (8" steel with 0.25" wall thickness) 80      LNFT 14.00 1,120.00            
S-001 drip irrigation system lump      lump 39,700.00 39,700.00            
S-002 tree trimming & root pruning lump      lump 32,000.00 32,000.00            
S-003 paved gutter drain 28      EACH 1,000.00 28,000.00            
S-004 electrical lines (e1 and e2) (1 1/2" direct buried pvc
conduit with 2 #4, & 1 #8g)
5,000      LNFT 10.00 50,000.00            
                       
 CONTRACTOR TOTAL       3,549,998.99            