| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - H & S CONSTRUCTION CO., INC. |
- 2 - M. MATT DURAND, LLC |
- 3 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
306   |
LNFT |
3.00 |
918.00 |
18.00 |
5,508.00 |
10.00 |
3,060.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
400   |
CUYD |
12.00 |
4,800.00 |
11.00 |
4,400.00 |
25.00 |
10,000.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,377   |
CUYD |
40.00 |
55,080.00 |
24.00 |
33,048.00 |
62.00 |
85,374.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
9,433.4 |
TON |
60.00 |
566,004.00 |
60.00 |
566,004.00 |
48.65 |
458,934.91 |
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
1,149.5 |
TON |
64.00 |
73,568.00 |
66.00 |
75,867.00 |
74.69 |
85,856.15 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
41,270   |
SQYD |
3.00 |
123,810.00 |
2.00 |
82,540.00 |
1.50 |
61,905.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,866   |
CUYD |
0.05 |
- 143.30 |
5.00 |
- 14,330.00 |
0.10 |
- 286.60 |
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
50.0 |
LNFT |
46.00 |
2,300.00 |
52.10 |
2,605.00 |
35.00 |
1,750.00 |
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
87.5 |
LNFT |
63.25 |
5,534.37 |
71.60 |
6,265.00 |
52.00 |
4,550.00 |
|
|
| 704-03 |
blocked out guard rail
|
162.5 |
LNFT |
19.00 |
3,087.50 |
21.50 |
3,493.75 |
18.50 |
3,006.25 |
|
|
| 704-05 |
guard rail anchor sections (bct)
|
18.8 |
LNFT |
75.00 |
1,410.00 |
85.00 |
1,598.00 |
73.00 |
1,372.40 |
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
2   |
EACH |
2,200.00 |
4,400.00 |
2,500.00 |
5,000.00 |
2,500.00 |
5,000.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
35,000.00 |
35,000.00 |
60,000.00 |
60,000.00 |
65,000.00 |
65,000.00 |
|
|
| 713-03-D |
temporary pavement markings (12" width)
|
24   |
LNFT |
0.70 |
16.80 |
0.90 |
21.60 |
1.00 |
24.00 |
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
72   |
LNFT |
1.45 |
104.40 |
1.70 |
122.40 |
1.00 |
72.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
7.000 |
MILE |
300.00 |
2,100.00 |
521.00 |
3,647.00 |
250.00 |
1,750.00 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
6.530 |
MILE |
310.00 |
2,024.30 |
352.00 |
2,298.56 |
300.00 |
1,959.00 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
16.130 |
MILE |
600.00 |
9,678.00 |
677.00 |
10,920.01 |
650.00 |
10,484.50 |
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
5,000.00 |
5,000.00 |
25,000.00 |
25,000.00 |
52,000.00 |
52,000.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
100,000.00 |
100,000.00 |
42,000.00 |
42,000.00 |
100,000.00 |
100,000.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
462   |
EACH |
6.00 |
2,772.00 |
7.00 |
3,234.00 |
6.00 |
2,772.00 |
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
24   |
LNFT |
1.50 |
36.00 |
1.70 |
40.80 |
2.00 |
48.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
72   |
LNFT |
4.50 |
324.00 |
5.00 |
360.00 |
3.00 |
216.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
8.065 |
MILE |
2,290.00 |
18,468.85 |
2,700.00 |
21,775.50 |
2,500.00 |
20,162.50 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.265 |
MILE |
900.00 |
2,938.50 |
1,100.00 |
3,591.50 |
850.00 |
2,775.25 |
|
|
| 735-01 |
mailboxes
|
102   |
EACH |
20.00 |
2,040.00 |
7.00 |
714.00 |
25.00 |
2,550.00 |
|
|
| 735-02 |
mailbox supports (single)
|
88   |
EACH |
150.00 |
13,200.00 |
170.00 |
14,960.00 |
350.00 |
30,800.00 |
|
|
| 735-03 |
mailbox supports (double)
|
4   |
EACH |
287.50 |
1,150.00 |
339.00 |
1,356.00 |
900.00 |
3,600.00 |
|
|
| 735-04 |
mailbox supports (multiple)
|
2   |
EACH |
375.00 |
750.00 |
423.00 |
846.00 |
2,500.00 |
5,000.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
11,000.00 |
11,000.00 |
80,000.00 |
80,000.00 |
|
|
| S-001 |
cement treated base course (12 in depth)
|
46,764   |
SQYD |
6.00 |
280,584.00 |
8.00 |
374,112.00 |
7.50 |
350,730.00 |
|
|
| S-922 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
3,008   |
LNFT |
1.67 |
5,023.36 |
1.80 |
5,414.40 |
5.00 |
15,040.00 |
|
|
| S-923 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
1,857   |
LNFT |
1.67 |
3,101.19 |
1.90 |
3,528.30 |
5.00 |
9,285.00 |
|
|
| S-927 |
sawcuts in asphaltic concrete lifts
|
2,432   |
LNFT |
0.75 |
1,824.00 |
1.60 |
3,891.20 |
2.50 |
6,080.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,346,903.97 |
|
1,360,832.02 |
|
1,480,870.36 |
|
|
|