| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - R. E. HEIDT CONSTRUCTION CO., INC. |
- 2 - PRAIRIE CONTRACTORS INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
376   |
SQYD |
8.36 |
3,143.36 |
9.00 |
3,384.00 |
|
|
|
|
| 202-02-E |
removal of concrete curbs
|
1,219.0 |
LNFT |
5.25 |
6,399.75 |
6.00 |
7,314.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
10,556.6 |
TON |
55.40 |
584,835.64 |
71.00 |
749,518.60 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
150.0 |
TON |
130.00 |
19,500.00 |
120.00 |
18,000.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
91,524   |
SQYD |
3.25 |
297,453.00 |
2.25 |
205,929.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,543   |
CUYD |
1.00 |
- 2,543.00 |
0.01 |
- 25.43 |
|
|
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
50,212   |
LNFT |
1.15 |
57,743.80 |
1.20 |
60,254.40 |
|
|
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
38,732   |
LNFT |
1.25 |
48,415.00 |
1.30 |
50,351.60 |
|
|
|
|
| 702-03-F |
catch basins (cb-08)
|
5   |
EACH |
4,200.00 |
21,000.00 |
5,000.00 |
25,000.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
5   |
EACH |
500.00 |
2,500.00 |
1,000.00 |
5,000.00 |
|
|
|
|
| 702-04-B |
adjusting catch basins
|
2   |
EACH |
2,400.00 |
4,800.00 |
3,000.00 |
6,000.00 |
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
496.1 |
SQYD |
56.17 |
27,865.93 |
60.00 |
29,766.00 |
|
|
|
|
| 707-01 |
concrete curb
|
1,816.0 |
LNFT |
12.54 |
22,772.64 |
15.00 |
27,240.00 |
|
|
|
|
| 710-01 |
flowable fill
|
30   |
CUYD |
79.00 |
2,370.00 |
85.00 |
2,550.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
11,000.00 |
11,000.00 |
167,000.00 |
167,000.00 |
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
1,288   |
LNFT |
0.21 |
270.48 |
1.00 |
1,288.00 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
11,436   |
LNFT |
0.63 |
7,204.68 |
0.01 |
114.36 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
10.828 |
MILE |
260.00 |
2,815.28 |
400.00 |
4,331.20 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
10.828 |
MILE |
265.00 |
2,869.42 |
1.00 |
10.82 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
24.800 |
MILE |
525.00 |
13,020.00 |
1.00 |
24.80 |
|
|
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
8   |
EACH |
53.00 |
424.00 |
1.00 |
8.00 |
|
|
|
|
| 713-06-B |
temporary pavement legends and symbols (double arrow)
|
30   |
EACH |
78.50 |
2,355.00 |
5.00 |
150.00 |
|
|
|
|
| 713-06-D |
temporary pavement legends and symbols (rr crossing)
|
6   |
EACH |
210.00 |
1,260.00 |
2.00 |
12.00 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
577   |
SQYD |
70.00 |
40,390.00 |
96.00 |
55,392.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
55,000.00 |
55,000.00 |
379,500.00 |
379,500.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
5,673   |
EACH |
4.70 |
26,663.10 |
5.00 |
28,365.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
644   |
LNFT |
0.84 |
540.96 |
1.80 |
1,159.20 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
5,718   |
LNFT |
2.50 |
14,295.00 |
3.00 |
17,154.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
12.400 |
MILE |
1,777.00 |
22,034.80 |
2,000.00 |
24,800.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
5.414 |
MILE |
680.00 |
3,681.52 |
1,000.00 |
5,414.00 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
4   |
EACH |
150.00 |
600.00 |
200.00 |
800.00 |
|
|
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
15   |
EACH |
178.00 |
2,670.00 |
220.00 |
3,300.00 |
|
|
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
3   |
EACH |
420.00 |
1,260.00 |
500.00 |
1,500.00 |
|
|
|
|
| 736-09 |
loop detector
|
288   |
LNFT |
17.50 |
5,040.00 |
40.00 |
11,520.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
12,000.00 |
12,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| S-001 |
ts500 lighted crosswalk system
|
2   |
EACH |
25,000.00 |
50,000.00 |
40,000.00 |
80,000.00 |
|
|
|
|
| S-922 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
50,212   |
LNFT |
1.05 |
52,722.60 |
1.10 |
55,233.20 |
|
|
|
|
| S-923 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
38,732   |
LNFT |
1.15 |
44,541.80 |
1.20 |
46,478.40 |
|
|
|
|
| S-927 |
sawcuts in asphaltic concrete lifts
|
88,944   |
LNFT |
0.57 |
50,698.08 |
0.65 |
57,813.60 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,519,612.84 |
|
2,171,650.75 |
|
|
|
|
|