Letting of 12/15/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 192-01-0010
Parish: CALCASIEU
Routes: LA 108
Description: COON GULLY BRIDGE AND APPROACHES
Type Const: grading, drainage structures, class ii base course, lime treatment, precast-prestressed
concrete girder span bridge, superpave asphaltic concrete pavement, and related work.
 
RankLicenseBidderAmount
100060 F. MILLER & SONS, LLC $938,485.06
209090 GUINN BROTHERS, LLC. $961,656.60
325747 KOSTMAYER CONSTRUCTION, LLC $1,288,162.60
402179 BOH BROS. CONSTRUCTION CO., LLC. $1,336,263.09
 
Item Number Item Description Quantity Unit of Measure - 1 -
F. MILLER & SONS, LLC
- 2 -
GUINN BROTHERS, LLC.
- 3 -
KOSTMAYER CONSTRUCTION, LLC
- 4 -
BOH BROS. CONSTRUCTION CO., LLC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 14,000.00 14,000.00 12,000.00 12,000.00 34,000.00 34,000.00 35,000.00 35,000.00
202-01 removal of structures & obstructions lump      lump 8,100.00 8,100.00 6,000.00 6,000.00 2,900.00 2,900.00 8,000.00 8,000.00
202-02-A removal of bridges (sta. 10+281.465, 23 m conc. coplss
slab)
1      ea 9,100.00 9,100.00 7,000.00 7,000.00 35,000.00 35,000.00 25,000.00 25,000.00
202-02-G removal of surfacing & stabilized base 1,177.4    sq m 6.00 7,064.40 4.00 4,709.60 9.00 10,596.60 3.00 3,532.20
203-02 drainage excavation 993      cu m 7.00 6,951.00 6.00 5,958.00 23.00 22,839.00 8.00 7,944.00
203-06 excavation & embankment lump      lump 48,200.00 48,200.00 30,000.00 30,000.00 22,000.00 22,000.00 42,000.00 42,000.00
204-05-A temporary sediment check dams (hay) 4      ea 400.00 1,600.00 100.00 400.00 110.00 440.00 165.00 660.00
204-06 temporary silt fencing 420      ln m 8.00 3,360.00 4.00 1,680.00 7.00 2,940.00 4.60 1,932.00
302-01 class ii base course 217.6    cu m 60.00 13,056.00 85.00 18,496.00 55.00 11,968.00 89.00 19,366.40
304-05 lime treatment (type e) 105.17   Mg 177.00 18,615.09 250.00 26,292.50 140.00 14,723.80 209.00 21,980.53
401-01 aggregate surface course (net section) 15.1    cu m 58.00 875.80 85.00 1,283.50 55.00 830.50 94.00 1,419.40
401-02 aggregate surface course (adjusted vehicular
measurement)
3      cu m 58.00 174.00 100.00 300.00 55.00 165.00 119.00 357.00
402-01 traffic maintenance aggregate (vehicular measurement) 152.9    cu m 58.50 8,944.65 50.00 7,645.00 55.00 8,409.50 88.00 13,455.20
502-01 superpave asphaltic concrete 297.4    Mg 104.00 30,929.60 125.00 37,175.00 120.00 35,688.00 106.00 31,524.40
502-01-A superpave asphaltic concrete, paved drives and
turnouts
76.2    Mg 152.00 11,582.40 150.00 11,430.00 165.00 12,573.00 148.00 11,277.60
701-05-I side drain pipe (600 mm) 8.5    ln m 215.00 1,827.50 250.00 2,125.00 103.00 875.50 166.00 1,411.00
701-05-K side drain pipe (750 mm) 10.4    ln m 280.00 2,912.00 325.00 3,380.00 153.00 1,591.20 217.00 2,256.80
701-05-M-01 side drain pipe (900 mm)(erosion) 160.0    ln m 230.00 36,800.00 300.00 48,000.00 173.00 27,680.00 301.00 48,160.00
704-08-B guard rail transitions (double thrie beam) 30.48   ln m 144.00 4,389.12 150.00 4,572.00 185.00 5,638.80 156.50 4,770.12
704-11-A guard rail end treatment (flared) 4      ea 1,800.00 7,200.00 1,900.00 7,600.00 2,350.00 9,400.00 1,900.00 7,600.00
705-01 barbed wire fence 217      ln m 16.00 3,472.00 15.00 3,255.00 17.00 3,689.00 15.50 3,363.50
705-02 combination mesh & barbed wire fence 137      ln m 20.00 2,740.00 25.00 3,425.00 23.00 3,151.00 21.00 2,877.00
705-05 double swinging driveway gates 1      dbgt 1,200.00 1,200.00 500.00 500.00 700.00 700.00 657.00 657.00
708-01 right-of-way monument 8      ea 27.00 216.00 500.00 4,000.00 155.00 1,240.00 617.00 4,936.00
708-02 right-of-way monument witness post 8      ea 44.00 352.00 500.00 4,000.00 155.00 1,240.00 205.50 1,644.00
712-04 flexible revetment 482      sq m 55.00 26,510.00 45.00 21,690.00 48.00 23,136.00 75.00 36,150.00
713-01 temporary signs & barricades lump      lump 20,300.00 20,300.00 10,000.00 10,000.00 12,200.00 12,200.00 6,200.00 6,200.00
720-01-A erosion control system, slpoe protection (type a) 300      sq m 3.00 900.00 4.00 1,200.00 2.50 750.00 2.50 750.00
722-01 project site laboratory 1      ea 10,300.00 10,300.00 8,000.00 8,000.00 8,000.00 8,000.00 11,000.00 11,000.00
725-01 temporary detour roads 289.7    ln m 350.00 101,395.00 480.00 139,056.00 700.00 202,790.00 439.00 127,178.30
725-03 temporary detour bridging 24.00   ln m 3,900.00 93,600.00 4,500.00 108,000.00 7,000.00 168,000.00 9,130.00 219,120.00
727-01 mobilization lump      lump 90,000.00 90,000.00 45,000.00 45,000.00 190,000.00 190,000.00 104,000.00 104,000.00
729-16-C object marker assembly (type 3) 4      ea 68.00 272.00 75.00 300.00 77.00 308.00 75.00 300.00
731-02 reflectorized raised pavement markers 18      ea 11.00 198.00 15.00 270.00 13.00 234.00 12.00 216.00
732-02-A plastic pavement striping (solid line)(100 mm width) 0.774  km 2,500.00 1,935.00 3,000.00 2,322.00 3,000.00 2,322.00 2,632.00 2,037.16
732-03-A plastic pavement striping (broken line)(100 mm width) 0.387  km 1,100.00 425.70 1,500.00 580.50 1,300.00 503.10 1,204.00 465.94
735-01 mailboxes 2      ea 5.00 10.00 100.00 200.00 6.00 12.00 6.00 12.00
735-02 mailbox supports (single) 2      ea 130.00 260.00 100.00 200.00 155.00 310.00 143.00 286.00
739-01 hydro-seeding 0.2    hctr 2,000.00 400.00 4,000.00 800.00 5,350.00 1,070.00 4,982.00 996.40
740-01 construction layout lump      lump 26,200.00 26,200.00 15,000.00 15,000.00 37,000.00 37,000.00 100,000.00 100,000.00
804-01-F precast concrete piles (600 mm) 384.0    ln m 345.00 132,480.00 320.00 122,880.00 308.00 118,272.00 266.00 102,144.00
804-12 loading permanent piles 1      ea 100.00 100.00 1.00 1.00 1.00 1.00 21,500.00 21,500.00
805-01-F class a concrete (bents) 33.46   cu m 670.00 22,418.20 850.00 28,441.00 700.00 23,422.00 732.00 24,492.72
805-03 class aa concrete 78.26   cu m 440.00 34,434.40 600.00 46,956.00 650.00 50,869.00 630.00 49,303.80
805-08-H precast-prestressed concrete girder (type quad beam) 213.30   ln m 190.00 40,527.00 285.00 60,790.50 284.00 60,577.20 644.00 137,365.20
805-11 strip seal joints 18.00   ln m 240.00 4,320.00 480.00 8,640.00 550.00 9,900.00 336.00 6,048.00
806-01 deformed reinforcing steel 13,202      kg 2.40 31,684.80 1.75 23,103.50 2.10 27,724.20 1.44 19,010.88
807-06 structural metalwork lump      lump 2,400.00 2,400.00 3,500.00 3,500.00 34,000.00 34,000.00 16,000.00 16,000.00
810-01 concrete railing (barrier) 72.00   ln m 220.00 15,840.00 185.00 13,320.00 150.00 10,800.00 154.00 11,088.00
813-01 concrete approach slabs 223.02   sq m 170.00 37,913.40 225.00 50,179.50 160.00 35,683.20 177.00 39,474.54
                       
 CONTRACTOR TOTAL       938,485.06   961,656.60   1,288,162.60   1,336,263.09