| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - F. MILLER & SONS, LLC |
- 2 - GUINN BROTHERS, LLC. |
- 3 - KOSTMAYER CONSTRUCTION, LLC |
- 4 - BOH BROS. CONSTRUCTION CO., LLC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
14,000.00 |
14,000.00 |
12,000.00 |
12,000.00 |
34,000.00 |
34,000.00 |
35,000.00 |
35,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
8,100.00 |
8,100.00 |
6,000.00 |
6,000.00 |
2,900.00 |
2,900.00 |
8,000.00 |
8,000.00 |
| 202-02-A |
removal of bridges (sta. 10+281.465, 23 m conc. coplss
slab) |
1   |
ea |
9,100.00 |
9,100.00 |
7,000.00 |
7,000.00 |
35,000.00 |
35,000.00 |
25,000.00 |
25,000.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
1,177.4 |
sq m |
6.00 |
7,064.40 |
4.00 |
4,709.60 |
9.00 |
10,596.60 |
3.00 |
3,532.20 |
| 203-02 |
drainage excavation
|
993   |
cu m |
7.00 |
6,951.00 |
6.00 |
5,958.00 |
23.00 |
22,839.00 |
8.00 |
7,944.00 |
| 203-06 |
excavation & embankment
|
lump |
lump |
48,200.00 |
48,200.00 |
30,000.00 |
30,000.00 |
22,000.00 |
22,000.00 |
42,000.00 |
42,000.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
ea |
400.00 |
1,600.00 |
100.00 |
400.00 |
110.00 |
440.00 |
165.00 |
660.00 |
| 204-06 |
temporary silt fencing
|
420   |
ln m |
8.00 |
3,360.00 |
4.00 |
1,680.00 |
7.00 |
2,940.00 |
4.60 |
1,932.00 |
| 302-01 |
class ii base course
|
217.6 |
cu m |
60.00 |
13,056.00 |
85.00 |
18,496.00 |
55.00 |
11,968.00 |
89.00 |
19,366.40 |
| 304-05 |
lime treatment (type e)
|
105.17 |
Mg |
177.00 |
18,615.09 |
250.00 |
26,292.50 |
140.00 |
14,723.80 |
209.00 |
21,980.53 |
| 401-01 |
aggregate surface course (net section)
|
15.1 |
cu m |
58.00 |
875.80 |
85.00 |
1,283.50 |
55.00 |
830.50 |
94.00 |
1,419.40 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
3   |
cu m |
58.00 |
174.00 |
100.00 |
300.00 |
55.00 |
165.00 |
119.00 |
357.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
152.9 |
cu m |
58.50 |
8,944.65 |
50.00 |
7,645.00 |
55.00 |
8,409.50 |
88.00 |
13,455.20 |
| 502-01 |
superpave asphaltic concrete
|
297.4 |
Mg |
104.00 |
30,929.60 |
125.00 |
37,175.00 |
120.00 |
35,688.00 |
106.00 |
31,524.40 |
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
76.2 |
Mg |
152.00 |
11,582.40 |
150.00 |
11,430.00 |
165.00 |
12,573.00 |
148.00 |
11,277.60 |
| 701-05-I |
side drain pipe (600 mm)
|
8.5 |
ln m |
215.00 |
1,827.50 |
250.00 |
2,125.00 |
103.00 |
875.50 |
166.00 |
1,411.00 |
| 701-05-K |
side drain pipe (750 mm)
|
10.4 |
ln m |
280.00 |
2,912.00 |
325.00 |
3,380.00 |
153.00 |
1,591.20 |
217.00 |
2,256.80 |
| 701-05-M-01 |
side drain pipe (900 mm)(erosion)
|
160.0 |
ln m |
230.00 |
36,800.00 |
300.00 |
48,000.00 |
173.00 |
27,680.00 |
301.00 |
48,160.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
30.48 |
ln m |
144.00 |
4,389.12 |
150.00 |
4,572.00 |
185.00 |
5,638.80 |
156.50 |
4,770.12 |
| 704-11-A |
guard rail end treatment (flared)
|
4   |
ea |
1,800.00 |
7,200.00 |
1,900.00 |
7,600.00 |
2,350.00 |
9,400.00 |
1,900.00 |
7,600.00 |
| 705-01 |
barbed wire fence
|
217   |
ln m |
16.00 |
3,472.00 |
15.00 |
3,255.00 |
17.00 |
3,689.00 |
15.50 |
3,363.50 |
| 705-02 |
combination mesh & barbed wire fence
|
137   |
ln m |
20.00 |
2,740.00 |
25.00 |
3,425.00 |
23.00 |
3,151.00 |
21.00 |
2,877.00 |
| 705-05 |
double swinging driveway gates
|
1   |
dbgt |
1,200.00 |
1,200.00 |
500.00 |
500.00 |
700.00 |
700.00 |
657.00 |
657.00 |
| 708-01 |
right-of-way monument
|
8   |
ea |
27.00 |
216.00 |
500.00 |
4,000.00 |
155.00 |
1,240.00 |
617.00 |
4,936.00 |
| 708-02 |
right-of-way monument witness post
|
8   |
ea |
44.00 |
352.00 |
500.00 |
4,000.00 |
155.00 |
1,240.00 |
205.50 |
1,644.00 |
| 712-04 |
flexible revetment
|
482   |
sq m |
55.00 |
26,510.00 |
45.00 |
21,690.00 |
48.00 |
23,136.00 |
75.00 |
36,150.00 |
| 713-01 |
temporary signs & barricades
|
lump |
lump |
20,300.00 |
20,300.00 |
10,000.00 |
10,000.00 |
12,200.00 |
12,200.00 |
6,200.00 |
6,200.00 |
| 720-01-A |
erosion control system, slpoe protection (type a)
|
300   |
sq m |
3.00 |
900.00 |
4.00 |
1,200.00 |
2.50 |
750.00 |
2.50 |
750.00 |
| 722-01 |
project site laboratory
|
1   |
ea |
10,300.00 |
10,300.00 |
8,000.00 |
8,000.00 |
8,000.00 |
8,000.00 |
11,000.00 |
11,000.00 |
| 725-01 |
temporary detour roads
|
289.7 |
ln m |
350.00 |
101,395.00 |
480.00 |
139,056.00 |
700.00 |
202,790.00 |
439.00 |
127,178.30 |
| 725-03 |
temporary detour bridging
|
24.00 |
ln m |
3,900.00 |
93,600.00 |
4,500.00 |
108,000.00 |
7,000.00 |
168,000.00 |
9,130.00 |
219,120.00 |
| 727-01 |
mobilization
|
lump |
lump |
90,000.00 |
90,000.00 |
45,000.00 |
45,000.00 |
190,000.00 |
190,000.00 |
104,000.00 |
104,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
ea |
68.00 |
272.00 |
75.00 |
300.00 |
77.00 |
308.00 |
75.00 |
300.00 |
| 731-02 |
reflectorized raised pavement markers
|
18   |
ea |
11.00 |
198.00 |
15.00 |
270.00 |
13.00 |
234.00 |
12.00 |
216.00 |
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
0.774 |
km |
2,500.00 |
1,935.00 |
3,000.00 |
2,322.00 |
3,000.00 |
2,322.00 |
2,632.00 |
2,037.16 |
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
0.387 |
km |
1,100.00 |
425.70 |
1,500.00 |
580.50 |
1,300.00 |
503.10 |
1,204.00 |
465.94 |
| 735-01 |
mailboxes
|
2   |
ea |
5.00 |
10.00 |
100.00 |
200.00 |
6.00 |
12.00 |
6.00 |
12.00 |
| 735-02 |
mailbox supports (single)
|
2   |
ea |
130.00 |
260.00 |
100.00 |
200.00 |
155.00 |
310.00 |
143.00 |
286.00 |
| 739-01 |
hydro-seeding
|
0.2 |
hctr |
2,000.00 |
400.00 |
4,000.00 |
800.00 |
5,350.00 |
1,070.00 |
4,982.00 |
996.40 |
| 740-01 |
construction layout
|
lump |
lump |
26,200.00 |
26,200.00 |
15,000.00 |
15,000.00 |
37,000.00 |
37,000.00 |
100,000.00 |
100,000.00 |
| 804-01-F |
precast concrete piles (600 mm)
|
384.0 |
ln m |
345.00 |
132,480.00 |
320.00 |
122,880.00 |
308.00 |
118,272.00 |
266.00 |
102,144.00 |
| 804-12 |
loading permanent piles
|
1   |
ea |
100.00 |
100.00 |
1.00 |
1.00 |
1.00 |
1.00 |
21,500.00 |
21,500.00 |
| 805-01-F |
class a concrete (bents)
|
33.46 |
cu m |
670.00 |
22,418.20 |
850.00 |
28,441.00 |
700.00 |
23,422.00 |
732.00 |
24,492.72 |
| 805-03 |
class aa concrete
|
78.26 |
cu m |
440.00 |
34,434.40 |
600.00 |
46,956.00 |
650.00 |
50,869.00 |
630.00 |
49,303.80 |
| 805-08-H |
precast-prestressed concrete girder (type quad beam)
|
213.30 |
ln m |
190.00 |
40,527.00 |
285.00 |
60,790.50 |
284.00 |
60,577.20 |
644.00 |
137,365.20 |
| 805-11 |
strip seal joints
|
18.00 |
ln m |
240.00 |
4,320.00 |
480.00 |
8,640.00 |
550.00 |
9,900.00 |
336.00 |
6,048.00 |
| 806-01 |
deformed reinforcing steel
|
13,202   |
kg |
2.40 |
31,684.80 |
1.75 |
23,103.50 |
2.10 |
27,724.20 |
1.44 |
19,010.88 |
| 807-06 |
structural metalwork
|
lump |
lump |
2,400.00 |
2,400.00 |
3,500.00 |
3,500.00 |
34,000.00 |
34,000.00 |
16,000.00 |
16,000.00 |
| 810-01 |
concrete railing (barrier)
|
72.00 |
ln m |
220.00 |
15,840.00 |
185.00 |
13,320.00 |
150.00 |
10,800.00 |
154.00 |
11,088.00 |
| 813-01 |
concrete approach slabs
|
223.02 |
sq m |
170.00 |
37,913.40 |
225.00 |
50,179.50 |
160.00 |
35,683.20 |
177.00 |
39,474.54 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
938,485.06 |
|
961,656.60 |
|
1,288,162.60 |
|
1,336,263.09 |
|