| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BEST-YET BUILDERS, LLC |
- 2 - GUINN BROTHERS, LLC. |
- 3 - JAMES CONSTRUCTION GROUP LLC |
BLOUNT BROS. CONSTRUCTION, INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
25,000.00 |
25,000.00 |
20,000.00 |
20,000.00 |
89,000.00 |
89,000.00 |
40,000.00 |
40,000.00 |
| 202-02-A-01 |
removal of bridge:(sta. 1+612.335; 7.30m x 49.38m
concrete deck girder brid ge) |
1   |
ea |
25,000.00 |
25,000.00 |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
50,000.00 |
50,000.00 |
| 202-02-A-02 |
removal of bridge:(sta. 2+349.640; 7.30m x 37.19m
concrete deck girder brid ge) |
1   |
ea |
25,000.00 |
25,000.00 |
12,000.00 |
12,000.00 |
20,000.00 |
20,000.00 |
35,000.00 |
35,000.00 |
| 202-02-H |
removal of guard rail
|
325   |
ln m |
5.00 |
1,625.00 |
15.00 |
4,875.00 |
10.00 |
3,250.00 |
15.00 |
4,875.00 |
| 203-02 |
drainage excavation
|
5,612   |
cu m |
6.50 |
36,478.00 |
6.00 |
33,672.00 |
7.00 |
39,284.00 |
10.00 |
56,120.00 |
| 203-06 |
excavation & embankment
|
lump |
lump |
50,000.00 |
50,000.00 |
55,000.00 |
55,000.00 |
30,000.00 |
30,000.00 |
50,000.00 |
50,000.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
22   |
cu m |
40.00 |
880.00 |
85.00 |
1,870.00 |
50.00 |
1,100.00 |
65.00 |
1,430.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
400.0 |
cu m |
1.00 |
400.00 |
50.00 |
20,000.00 |
10.00 |
4,000.00 |
55.00 |
22,000.00 |
| 502-01 |
superpave asphaltic concrete
|
2,100.4 |
Mg |
67.20 |
141,146.88 |
90.00 |
189,036.00 |
80.00 |
168,032.00 |
70.00 |
147,028.00 |
| 502-03 |
superpave asphaltic concrete (100mm thick)
|
4   |
sq m |
90.00 |
360.00 |
50.00 |
200.00 |
60.00 |
240.00 |
40.00 |
160.00 |
| 509-01 |
cold planing asphaltic pavement
|
1,965   |
sq m |
2.00 |
3,930.00 |
10.00 |
19,650.00 |
5.00 |
9,825.00 |
6.00 |
11,790.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 197   |
cu m |
1.00 |
- 197.00 |
1.00 |
- 197.00 |
1.00 |
- 197.00 |
1.00 |
- 197.00 |
| 701-05-I |
side drain pipe (600 mm)
|
21.5 |
ln m |
95.00 |
2,042.50 |
300.00 |
6,450.00 |
175.00 |
3,762.50 |
80.00 |
1,720.00 |
| 704-03 |
blocked out guard rail
|
152.40 |
ln m |
62.00 |
9,448.80 |
55.00 |
8,382.00 |
60.00 |
9,144.00 |
75.00 |
11,430.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
60.96 |
ln m |
155.00 |
9,448.80 |
155.00 |
9,448.80 |
200.00 |
12,192.00 |
170.00 |
10,363.20 |
| 704-11-A |
guard rail end treatment (flared)
|
8   |
ea |
1,600.00 |
12,800.00 |
2,000.00 |
16,000.00 |
2,000.00 |
16,000.00 |
1,800.00 |
14,400.00 |
| 705-01 |
barbed wire fence
|
467   |
ln m |
17.00 |
7,939.00 |
15.00 |
7,005.00 |
15.00 |
7,005.00 |
16.00 |
7,472.00 |
| 705-04 |
single swinging driveway gates
|
2   |
ea |
450.00 |
900.00 |
500.00 |
1,000.00 |
400.00 |
800.00 |
500.00 |
1,000.00 |
| 708-01 |
right-of-way monument
|
14   |
ea |
150.00 |
2,100.00 |
200.00 |
2,800.00 |
50.00 |
700.00 |
100.00 |
1,400.00 |
| 708-02 |
right-of-way monument witness post
|
14   |
ea |
100.00 |
1,400.00 |
200.00 |
2,800.00 |
50.00 |
700.00 |
75.00 |
1,050.00 |
| 711-04 |
geotextile fabric
|
1,529   |
sq m |
1.50 |
2,293.50 |
5.00 |
7,645.00 |
2.00 |
3,058.00 |
2.50 |
3,822.50 |
| 712-04 |
flexible revetment
|
1,529   |
sq m |
53.79 |
82,244.91 |
45.00 |
68,805.00 |
45.00 |
68,805.00 |
50.00 |
76,450.00 |
| 713-01 |
temporary signs & barricades
|
lump |
lump |
30,000.00 |
30,000.00 |
18,000.00 |
18,000.00 |
30,000.00 |
30,000.00 |
30,000.00 |
30,000.00 |
| 713-05-A |
temporary pavement markings (solid line)(100 mm width)
|
3.287 |
km |
500.00 |
1,643.50 |
525.00 |
1,725.67 |
500.00 |
1,643.50 |
2,500.00 |
8,217.50 |
| 713-07 |
temporary reflectorized raised pavement markers
|
69   |
ea |
1.50 |
103.50 |
10.00 |
690.00 |
10.00 |
690.00 |
20.00 |
1,380.00 |
| 716-01-A |
mulch (vegetative)
|
2.8 |
hctr |
1,500.00 |
4,200.00 |
3,000.00 |
8,400.00 |
2,000.00 |
5,600.00 |
2,500.00 |
7,000.00 |
| 717-01 |
seeding
|
93   |
kg |
4.00 |
372.00 |
20.00 |
1,860.00 |
18.00 |
1,674.00 |
15.00 |
1,395.00 |
| 718-01 |
fertilizer
|
3,092   |
kg |
1.00 |
3,092.00 |
1.00 |
3,092.00 |
0.50 |
1,546.00 |
0.60 |
1,855.20 |
| 720-01-A |
erosion control system, slope protection (type a)
|
1,085   |
sq m |
3.00 |
3,255.00 |
2.00 |
2,170.00 |
2.00 |
2,170.00 |
4.00 |
4,340.00 |
| 722-01 |
project site laboratory
|
1   |
ea |
5,000.00 |
5,000.00 |
8,500.00 |
8,500.00 |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
| 724-01-B |
pavement patching (300 mm minimum thickness)
|
200   |
sq m |
80.00 |
16,000.00 |
100.00 |
20,000.00 |
80.00 |
16,000.00 |
100.00 |
20,000.00 |
| 725-01 |
temporary detour roads
|
578.6 |
ln m |
275.00 |
159,115.00 |
635.00 |
367,411.00 |
600.00 |
347,160.00 |
300.00 |
173,580.00 |
| 725-03 |
temporary detour bridging
|
90.00 |
ln m |
7,700.00 |
693,000.00 |
3,200.00 |
288,000.00 |
5,300.00 |
477,000.00 |
5,000.00 |
450,000.00 |
| 727-01 |
mobilization
|
lump |
lump |
100,000.00 |
100,000.00 |
100,000.00 |
100,000.00 |
280,000.00 |
280,000.00 |
110,000.00 |
110,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
8   |
ea |
60.00 |
480.00 |
75.00 |
600.00 |
70.00 |
560.00 |
100.00 |
800.00 |
| 731-02 |
reflectorized raised pavement markers
|
69   |
ea |
6.00 |
414.00 |
8.00 |
552.00 |
6.00 |
414.00 |
15.00 |
1,035.00 |
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
2.675 |
km |
1,300.00 |
3,477.50 |
1,550.00 |
4,146.25 |
800.00 |
2,140.00 |
1,500.00 |
4,012.50 |
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
0.579 |
km |
500.00 |
289.50 |
600.00 |
347.40 |
300.00 |
173.70 |
1,000.00 |
579.00 |
| 732-05 |
removal of existing markings
|
0.379 |
km |
1,800.00 |
682.20 |
2,000.00 |
758.00 |
1,000.00 |
379.00 |
4,000.00 |
1,516.00 |
| 740-01 |
construction layout
|
lump |
lump |
51,000.00 |
51,000.00 |
55,000.00 |
55,000.00 |
15,000.00 |
15,000.00 |
50,000.00 |
50,000.00 |
| 804-01-C |
precast concrete piles (400 mm)
|
1,323.0 |
ln m |
175.00 |
231,525.00 |
130.00 |
171,990.00 |
175.00 |
231,525.00 |
200.00 |
264,600.00 |
| 804-01-F |
precast concrete piles (600 mm)
|
343.5 |
ln m |
275.00 |
94,462.50 |
245.00 |
84,157.50 |
225.00 |
77,287.50 |
290.00 |
99,615.00 |
| 804-12 |
loading permanent piles
|
2   |
ea |
5,000.00 |
10,000.00 |
1.00 |
2.00 |
500.00 |
1,000.00 |
100.00 |
200.00 |
| 805-01-F |
class a concrete (bents)
|
164.95 |
cu m |
600.00 |
98,970.00 |
750.00 |
123,712.50 |
950.00 |
156,702.50 |
1,177.00 |
194,146.15 |
| 805-03 |
class aa concrete
|
460.74 |
cu m |
600.00 |
276,444.00 |
550.00 |
253,407.00 |
625.00 |
287,962.50 |
850.00 |
391,629.00 |
| 805-08-B |
precast-prestressed concrete girders (type ii)
|
392.40 |
ln m |
300.00 |
117,720.00 |
365.00 |
143,226.00 |
300.00 |
117,720.00 |
300.00 |
117,720.00 |
| 805-11 |
strip seal joints
|
30.48 |
ln m |
300.00 |
9,144.00 |
460.00 |
14,020.80 |
400.00 |
12,192.00 |
400.00 |
12,192.00 |
| 806-01 |
deformed reinforcing steel
|
75,713   |
kg |
1.30 |
98,426.90 |
1.60 |
121,140.80 |
1.40 |
105,998.20 |
2.50 |
189,282.50 |
| 807-06 |
structural metalwork
|
lump |
lump |
4,000.00 |
4,000.00 |
4,000.00 |
4,000.00 |
4,000.00 |
4,000.00 |
4,000.00 |
4,000.00 |
| 810-01 |
concrete railing (barrier)
|
247.20 |
ln m |
132.00 |
32,630.40 |
165.00 |
40,788.00 |
125.00 |
30,900.00 |
250.00 |
61,800.00 |
| 813-01 |
concrete approach slabs
|
640.80 |
sq m |
180.00 |
115,344.00 |
190.00 |
121,752.00 |
165.00 |
105,732.00 |
150.00 |
96,120.00 |
| S-001 |
temporary construction entrances
|
2   |
ea |
100.00 |
200.00 |
2,000.00 |
4,000.00 |
100.00 |
200.00 |
2,500.00 |
5,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,601,231.39 |
|
2,469,890.72 |
|
2,830,070.40 |
|
IRREGULAR |
|