Lead Project: 860-01-0006
Parish: WEBSTER
Routes: LA 802
Description: JUNCTION US 371 EAST TO JUNCTION LA 2
Type Const: superpave asphaltic concrete overlay, pavement patching, and related work
 
RankLicenseBidderAmount
108584 MADDEN CONTRACTING CO., INC. $732,005.61
217464 BENTON & BROWN, LLC. $749,080.20
 
Item Number Item Description Quantity Unit of Measure - 1 -
MADDEN CONTRACTING CO., INC.
- 2 -
BENTON & BROWN, LLC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 95      LNFT 10.00 950.00 5.00 475.00        
203-08 borrow (vehicular measurement) 1,500      CUYD 15.00 22,500.00 11.00 16,500.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
314      CUYD 10.00 3,140.00 48.00 15,072.00        
502-01 superpave asphaltic concrete 7,984.1    TON 55.00 439,125.50 48.00 383,236.80        
502-01-A superpave asphaltic concrete, paved drives and
turnouts
926.0    TON 20.00 18,520.00 48.00 44,448.00        
701-08 relaying pipe 24      LNFT 100.00 2,400.00 170.00 4,080.00        
701-15 concrete collar 5      EACH 500.00 2,500.00 600.00 3,000.00        
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 37.6    LNFT 30.00 1,128.00 42.00 1,579.20        
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
12.6    LNFT 85.00 1,071.00 96.00 1,209.60        
704-11-A guard rail end treatment (flared) 2      each 1,850.00 3,700.00 2,200.00 4,400.00        
712-02 sacked concrete revetment 100      SQYD 60.00 6,000.00 45.00 4,500.00        
713-01 temporary signs & barricades lump      LUMP 55,700.00 55,700.00 70,000.00 70,000.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
7.660  MILE 338.50 2,592.91 400.00 3,064.00        
724-01-A pavement patching (6" minimum thickness) 1,814      SQYD 40.00 72,560.00 35.00 63,490.00        
727-01 mobilization lump      LUMP 55,700.00 55,700.00 70,000.00 70,000.00        
729-16-C object marker assembly (type 3) 2      EACH 75.00 150.00 90.00 180.00        
731-02 reflectorized raised pavement markers 506      EACH 4.50 2,277.00 6.00 3,036.00        
732-01-E plastic pavement striping (24" width) 92      LNFT 2.40 220.80 4.00 368.00        
732-02-A plastic pavement striping (solid line) (4" width) 14.928  MILE 1,800.00 26,870.40 2,200.00 32,841.60        
732-04-D plastic pavement legends & symbols (rr crossing) 2      EACH 650.00 1,300.00 600.00 1,200.00        
739-01 hydro-seeding 4.00   ACRE 900.00 3,600.00 1,600.00 6,400.00        
740-01 construction layout lump      LUMP 10,000.00 10,000.00 20,000.00 20,000.00        
                       
 CONTRACTOR TOTAL       732,005.61   749,080.20        