Letting of 11/17/2004 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 840-01-0010
Parish: RAPIDES
Routes: LA 1206
Description: SOUTH JUNCTION LA 115 - NORTH JUNCTION LA 115
Type Const: drainage structures, cold planing asphaltic concrete pavement, superpave asphaltic
concrete pavement, pavement patching, and related work.
 
RankLicenseBidderAmount
112487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,122,557.57
212312 GILCHRIST CONSTRUCTION CO. LLC $1,198,693.17
305789 D & J CONSTRUCTION CO., INC. $1,322,131.59
 
Item Number Item Description Quantity Unit of Measure - 1 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 2 -
GILCHRIST CONSTRUCTION CO. LLC
- 3 -
D & J CONSTRUCTION CO., INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 1,550.00 1,550.00 2,000.00 2,000.00 1,200.00 1,200.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
4,750      CUYD 42.06 199,785.00 32.00 152,000.00 30.00 142,500.00    
502-01 superpave asphaltic concrete 13,766.4    TON 42.66 587,274.62 47.00 647,020.80 50.00 688,320.00    
502-01-A superpave asphaltic concrete, paved drives and
turnouts
1,251.5    TON 68.67 85,940.50 75.00 93,862.50 95.00 118,892.50    
509-01 cold planing asphaltic pavement 1,865      SQYD 5.33 9,940.45 5.00 9,325.00 12.50 23,312.50    
509-02 contractor retained reclaimed asphaltic pavement - 84      CUYD 0.10 - 8.40 1.00 - 84.00 0.01 - 0.84    
701-02-D/E cross drain pipe arch (24" equiv. rcpa or 30" equiv.
cmpa)
48      LNFT 155.00 7,440.00 100.00 4,800.00 100.00 4,800.00    
713-01 temporary signs & barricades lump      LUMP 7,000.00 7,000.00 7,500.00 7,500.00 40,000.00 40,000.00    
713-03-E temporary pavement markings (24" width) 60      LNFT 0.62 37.20 0.65 39.00 3.00 180.00    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
10.761  MILE 592.00 6,370.51 550.00 5,918.55 195.00 2,098.39    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
6.842  MILE 100.00 684.20 275.00 1,881.55 230.00 1,573.66    
713-05-A temporary pavement markings (solid line)(4" width) 31.963  MILE 200.00 6,392.60 525.00 16,780.57 1.00 31.96    
724-01-B pavement patching (12" minimum thickness) 2,000      SQYD 52.25 104,500.00 80.00 160,000.00 62.00 124,000.00    
726-01 bedding material 9.3    CUYD 77.19 717.86 60.00 558.00 50.00 465.00    
727-01 mobilization lump      LUMP 23,700.00 23,700.00 24,000.00 24,000.00 90,000.00 90,000.00    
729-16-B object marker assembly (type 2) 2      EACH 103.00 206.00 50.00 100.00 75.00 150.00    
731-02 reflectorized raised pavement markers 985      EACH 4.63 4,560.55 5.00 4,925.00 7.00 6,895.00    
732-01-E plastic pavement striping (24" width) 60      LNFT 2.47 148.20 2.50 150.00 14.00 840.00    
732-02-A plastic pavement striping (solid line) (4" width) 23.128  MILE 1,853.00 42,856.18 1,900.00 43,943.20 2,015.00 46,602.92    
732-03-A plastic pavement striping (broken line)(4" width) 4.630  MILE 670.00 3,102.10 700.00 3,241.00 950.00 4,398.50    
735-01 mailboxes 132      EACH 12.00 1,584.00 1.00 132.00 1.00 132.00    
735-02 mailbox supports (single) 128      EACH 173.00 22,144.00 100.00 12,800.00 105.00 13,440.00    
735-03 mailbox supports (double) 2      EACH 341.00 682.00 150.00 300.00 150.00 300.00    
740-01 construction layout lump      LUMP 5,950.00 5,950.00 7,500.00 7,500.00 12,000.00 12,000.00    
                       
 CONTRACTOR TOTAL       1,122,557.57   1,198,693.17   1,322,131.59    