Lead Project: 834-17-0007
Parish: MOREHOUSE
Routes: LA 3051
Description: JCT. US 165 - JCT. LA 138
Type Const: borrow, cold planing asphaltic concrete, superpave asphaltic concrete pavement,
and related work.
 
RankLicenseBidderAmount
105789 D & J CONSTRUCTION CO., INC. $1,345,554.98
212487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,376,270.05
 
Item Number Item Description Quantity Unit of Measure - 1 -
D & J CONSTRUCTION CO., INC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 70      SQYD 15.00 1,050.00 32.00 2,240.00        
203-08-A borrow (vehicular measurement)(selected soils) 215      CUYD 21.00 4,515.00 20.00 4,300.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
1,603      CUYD 26.00 41,678.00 48.00 76,944.00        
502-01 superpave asphaltic concrete 9,572.0    TON 53.00 507,316.00 50.54 483,768.88        
502-01-A superpave asphaltic concrete, paved drives and
turnouts
420.2    TON 90.00 37,818.00 153.38 64,450.27        
509-01 cold planing asphaltic pavement 50,952      SQYD 2.00 101,904.00 2.00 101,904.00        
509-02 contractor retained reclaimed asphaltic pavement - 2,124      CUYD 0.01 - 21.24 0.10 - 212.40        
713-01 temporary signs & barricades lump      LUMP 70,000.00 70,000.00 24,000.00 24,000.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
3.895  MILE 225.00 876.37 2,400.00 9,348.00        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
1.929  MILE 445.00 858.40 300.00 578.70        
713-05-A temporary pavement markings (solid line)(4" width) 12.170  MILE 315.00 3,833.55 550.00 6,693.50        
716-01-A mulch (vegetative) 3.78   ACRE 750.00 2,835.00 1,000.00 3,780.00        
717-01 seeding 170      LB 8.00 1,360.00 10.00 1,700.00        
718-01 fertilizer 3,780      LB 0.30 1,134.00 0.50 1,890.00        
722-02 project site laboratory (equipped) 1      EACH 10,000.00 10,000.00 27,500.00 27,500.00        
727-01 mobilization lump      LUMP 98,000.00 98,000.00 117,500.00 117,500.00        
731-02 reflectorized raised pavement markers 515      EACH 8.00 4,120.00 4.83 2,487.45        
732-02-A plastic pavement striping (solid line) (4" width) 12.170  MILE 2,600.00 31,642.00 2,000.00 24,340.00        
732-03-A plastic pavement striping (broken line)(4" width) 1.929  MILE 1,100.00 2,121.90 750.00 1,446.75        
735-01 mailboxes 65      EACH 1.00 65.00 15.00 975.00        
735-02 mailbox supports (single) 33      EACH 107.00 3,531.00 300.00 9,900.00        
735-03 mailbox supports (double) 11      EACH 157.00 1,727.00 500.00 5,500.00        
735-04 mailbox supports (multiple) 3      EACH 295.00 885.00 600.00 1,800.00        
740-01 construction layout lump      LUMP 14,000.00 14,000.00 54,000.00 54,000.00        
S-001 cement treated base course (12 in depth) 57,758      SQYD 7.00 404,306.00 6.05 349,435.90        
                       
 CONTRACTOR TOTAL       1,345,554.98   1,376,270.05        