| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - COASTAL BRIDGE CO., L.L.C. |
- 4 - BARBER BROS. CONTRACTING CO., L.L.C |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
1,972   |
LNFT |
3.40 |
6,704.80 |
3.66 |
7,217.52 |
3.00 |
5,916.00 |
5.00 |
9,860.00 |
| 203-08 |
borrow (vehicular measurement)
|
2,050   |
CUYD |
11.00 |
22,550.00 |
11.00 |
22,550.00 |
10.00 |
20,500.00 |
20.00 |
41,000.00 |
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
300   |
CUYD |
11.00 |
3,300.00 |
11.00 |
3,300.00 |
15.00 |
4,500.00 |
20.00 |
6,000.00 |
| 303-02 |
removal of existing patches
|
1,500   |
SQYD |
1.00 |
1,500.00 |
11.28 |
16,920.00 |
10.00 |
15,000.00 |
15.00 |
22,500.00 |
| 502-01 |
superpave asphaltic concrete
|
14,206.9 |
TON |
48.00 |
681,931.20 |
43.87 |
623,256.70 |
54.00 |
767,172.60 |
50.00 |
710,345.00 |
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
4,128.0 |
TON |
1.00 |
4,128.00 |
90.48 |
373,501.44 |
5.00 |
20,640.00 |
65.00 |
268,320.00 |
| 509-01 |
cold planing asphaltic pavement
|
58,411   |
SQYD |
2.50 |
146,027.50 |
1.32 |
77,102.52 |
6.75 |
394,274.25 |
2.00 |
116,822.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,179   |
CUYD |
9.00 |
- 19,611.00 |
0.10 |
- 217.90 |
30.00 |
- 65,370.00 |
FREE |
FREE |
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
400.0 |
LNFT |
30.00 |
12,000.00 |
28.73 |
11,492.00 |
25.00 |
10,000.00 |
32.00 |
12,800.00 |
| 704-03 |
blocked out guard rail
|
237.5 |
LNFT |
17.00 |
4,037.50 |
16.98 |
4,032.75 |
17.00 |
4,037.50 |
18.00 |
4,275.00 |
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
150.0 |
LNFT |
30.00 |
4,500.00 |
28.73 |
4,309.50 |
38.00 |
5,700.00 |
32.00 |
4,800.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
400.0 |
LNFT |
40.00 |
16,000.00 |
39.18 |
15,672.00 |
44.00 |
17,600.00 |
42.00 |
16,800.00 |
| 704-11-A |
guard rail end treatment (flared)
|
16   |
EACH |
1,800.00 |
28,800.00 |
1,725.00 |
27,600.00 |
1,850.00 |
29,600.00 |
1,850.00 |
29,600.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
78,000.00 |
78,000.00 |
14,900.00 |
14,900.00 |
12,500.00 |
12,500.00 |
30,000.00 |
30,000.00 |
| 713-03-E |
temporary pavement markings (24" width)
|
33   |
LNFT |
1.00 |
33.00 |
0.84 |
27.72 |
10.00 |
330.00 |
2.00 |
66.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
15.870 |
MILE |
130.00 |
2,063.10 |
143.00 |
2,269.41 |
300.00 |
4,761.00 |
300.00 |
4,761.00 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
12.130 |
MILE |
10.00 |
121.30 |
225.00 |
2,729.25 |
310.00 |
3,760.30 |
250.00 |
3,032.50 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
26.490 |
MILE |
20.00 |
529.80 |
445.00 |
11,788.05 |
590.00 |
15,629.10 |
250.00 |
6,622.50 |
| 717-01 |
seeding
|
149   |
LB |
27.00 |
4,023.00 |
26.12 |
3,891.88 |
8.00 |
1,192.00 |
8.00 |
1,192.00 |
| 718-01 |
fertilizer
|
4,971   |
LB |
1.30 |
6,462.30 |
1.04 |
5,169.84 |
0.20 |
994.20 |
0.30 |
1,491.30 |
| 721-01 |
asphalt mulch
|
12,030   |
GAL |
0.10 |
1,203.00 |
0.10 |
1,203.00 |
1.50 |
18,045.00 |
1.80 |
21,654.00 |
| 722-01 |
project site laboratory
|
1   |
EACH |
1,000.00 |
1,000.00 |
2,700.00 |
2,700.00 |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
100   |
SQYD |
74.00 |
7,400.00 |
117.20 |
11,720.00 |
48.00 |
4,800.00 |
100.00 |
10,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
155,000.00 |
155,000.00 |
10,250.00 |
10,250.00 |
100,000.00 |
100,000.00 |
100,000.00 |
100,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
16   |
EACH |
100.00 |
1,600.00 |
67.92 |
1,086.72 |
65.00 |
1,040.00 |
75.00 |
1,200.00 |
| 731-02 |
reflectorized raised pavement markers
|
748   |
EACH |
5.00 |
3,740.00 |
5.17 |
3,867.16 |
5.00 |
3,740.00 |
6.00 |
4,488.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
11   |
LNFT |
9.00 |
99.00 |
3.07 |
33.77 |
100.00 |
1,100.00 |
3.00 |
33.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
12.160 |
MILE |
1,900.00 |
23,104.00 |
1,860.00 |
22,617.60 |
2,000.00 |
24,320.00 |
1,800.00 |
21,888.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
5.560 |
MILE |
800.00 |
4,448.00 |
805.00 |
4,475.80 |
800.00 |
4,448.00 |
800.00 |
4,448.00 |
| 735-01 |
mailboxes
|
119   |
EACH |
5.00 |
595.00 |
12.00 |
1,428.00 |
1.00 |
119.00 |
2.00 |
238.00 |
| 735-02 |
mailbox supports (single)
|
119   |
EACH |
100.00 |
11,900.00 |
196.00 |
23,324.00 |
175.00 |
20,825.00 |
100.00 |
11,900.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
8,150.00 |
8,150.00 |
7,500.00 |
7,500.00 |
20,000.00 |
20,000.00 |
| S-001 |
cement treated base course (12 inch depth)
|
64,330   |
SQYD |
5.55 |
357,031.50 |
4.75 |
305,567.50 |
5.10 |
328,083.00 |
5.00 |
321,650.00 |
| S-002 |
surface preparation
|
lump |
LUMP |
7,000.00 |
7,000.00 |
5,045.85 |
5,045.85 |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,587,221.00 |
|
1,628,982.08 |
|
1,797,756.95 |
|
1,832,786.30 |
|