Lead Project: 832-26-0002
Parish: LIVINGSTON, TANGIPAHOA
Routes: LA 1064
Description: JUNCTION ROUTE LA 43 - JUNCTION ROUTE US 51
Type Const: cement treated base course, cold planing asphaltic pvmt, superpave asphaltic concrete
pavement, pavement patching, and related work.
 
RankLicenseBidderAmount
106276 BARRIERE CONSTRUCTION CO., LLC. $1,587,221.00
212487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,628,982.08
300481 COASTAL BRIDGE CO., L.L.C. $1,797,756.95
400046 BARBER BROS. CONTRACTING CO., L.L.C $1,832,786.30
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 3 -
COASTAL BRIDGE CO., L.L.C.
- 4 -
BARBER BROS. CONTRACTING CO., L.L.C
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 1,972      LNFT 3.40 6,704.80 3.66 7,217.52 3.00 5,916.00 5.00 9,860.00
203-08 borrow (vehicular measurement) 2,050      CUYD 11.00 22,550.00 11.00 22,550.00 10.00 20,500.00 20.00 41,000.00
203-08-A borrow (vehicular meas.)(selected soils) 300      CUYD 11.00 3,300.00 11.00 3,300.00 15.00 4,500.00 20.00 6,000.00
303-02 removal of existing patches 1,500      SQYD 1.00 1,500.00 11.28 16,920.00 10.00 15,000.00 15.00 22,500.00
502-01 superpave asphaltic concrete 14,206.9    TON 48.00 681,931.20 43.87 623,256.70 54.00 767,172.60 50.00 710,345.00
502-01-A superpave asphaltic concrete, paved drives and
turnouts
4,128.0    TON 1.00 4,128.00 90.48 373,501.44 5.00 20,640.00 65.00 268,320.00
509-01 cold planing asphaltic pavement 58,411      SQYD 2.50 146,027.50 1.32 77,102.52 6.75 394,274.25 2.00 116,822.00
509-02 contractor retained reclaimed asphaltic pavement - 2,179      CUYD 9.00 - 19,611.00 0.10 - 217.90 30.00 - 65,370.00 FREE FREE
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 400.0    LNFT 30.00 12,000.00 28.73 11,492.00 25.00 10,000.00 32.00 12,800.00
704-03 blocked out guard rail 237.5    LNFT 17.00 4,037.50 16.98 4,032.75 17.00 4,037.50 18.00 4,275.00
704-07-A guard rail bridge attachments (single thrie beam) 150.0    LNFT 30.00 4,500.00 28.73 4,309.50 38.00 5,700.00 32.00 4,800.00
704-08-B guard rail transitions (double thrie beam) 400.0    LNFT 40.00 16,000.00 39.18 15,672.00 44.00 17,600.00 42.00 16,800.00
704-11-A guard rail end treatment (flared) 16      EACH 1,800.00 28,800.00 1,725.00 27,600.00 1,850.00 29,600.00 1,850.00 29,600.00
713-01 temporary signs & barricades lump      LUMP 78,000.00 78,000.00 14,900.00 14,900.00 12,500.00 12,500.00 30,000.00 30,000.00
713-03-E temporary pavement markings (24" width) 33      LNFT 1.00 33.00 0.84 27.72 10.00 330.00 2.00 66.00
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
15.870  MILE 130.00 2,063.10 143.00 2,269.41 300.00 4,761.00 300.00 4,761.00
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
12.130  MILE 10.00 121.30 225.00 2,729.25 310.00 3,760.30 250.00 3,032.50
713-05-A temporary pavement markings (solid line)(4" width) 26.490  MILE 20.00 529.80 445.00 11,788.05 590.00 15,629.10 250.00 6,622.50
717-01 seeding 149      LB 27.00 4,023.00 26.12 3,891.88 8.00 1,192.00 8.00 1,192.00
718-01 fertilizer 4,971      LB 1.30 6,462.30 1.04 5,169.84 0.20 994.20 0.30 1,491.30
721-01 asphalt mulch 12,030      GAL 0.10 1,203.00 0.10 1,203.00 1.50 18,045.00 1.80 21,654.00
722-01 project site laboratory 1      EACH 1,000.00 1,000.00 2,700.00 2,700.00 5,000.00 5,000.00 10,000.00 10,000.00
724-01-B pavement patching (12" minimum thickness) 100      SQYD 74.00 7,400.00 117.20 11,720.00 48.00 4,800.00 100.00 10,000.00
727-01 mobilization lump      LUMP 155,000.00 155,000.00 10,250.00 10,250.00 100,000.00 100,000.00 100,000.00 100,000.00
729-16-C object marker assembly (type 3) 16      EACH 100.00 1,600.00 67.92 1,086.72 65.00 1,040.00 75.00 1,200.00
731-02 reflectorized raised pavement markers 748      EACH 5.00 3,740.00 5.17 3,867.16 5.00 3,740.00 6.00 4,488.00
732-01-E plastic pavement striping (24" width) 11      LNFT 9.00 99.00 3.07 33.77 100.00 1,100.00 3.00 33.00
732-02-A plastic pavement striping (solid line) (4" width) 12.160  MILE 1,900.00 23,104.00 1,860.00 22,617.60 2,000.00 24,320.00 1,800.00 21,888.00
732-03-A plastic pavement striping (broken line)(4" width) 5.560  MILE 800.00 4,448.00 805.00 4,475.80 800.00 4,448.00 800.00 4,448.00
735-01 mailboxes 119      EACH 5.00 595.00 12.00 1,428.00 1.00 119.00 2.00 238.00
735-02 mailbox supports (single) 119      EACH 100.00 11,900.00 196.00 23,324.00 175.00 20,825.00 100.00 11,900.00
740-01 construction layout lump      LUMP 10,000.00 10,000.00 8,150.00 8,150.00 7,500.00 7,500.00 20,000.00 20,000.00
S-001 cement treated base course (12 inch depth) 64,330      SQYD 5.55 357,031.50 4.75 305,567.50 5.10 328,083.00 5.00 321,650.00
S-002 surface preparation lump      LUMP 7,000.00 7,000.00 5,045.85 5,045.85 10,000.00 10,000.00 15,000.00 15,000.00
                       
 CONTRACTOR TOTAL       1,587,221.00   1,628,982.08   1,797,756.95   1,832,786.30