| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - COASTAL BRIDGE CO., L.L.C. |
- 2 - HUEY STOCKSTILL, INC. |
- 3 - BARRIERE CONSTRUCTION CO., LLC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-08 |
borrow (vehicular measurement)
|
150   |
CUYD |
5.00 |
750.00 |
20.00 |
3,000.00 |
15.00 |
2,250.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
541   |
CUYD |
50.00 |
27,050.00 |
33.00 |
17,853.00 |
52.00 |
28,132.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
2,790.1 |
TON |
50.00 |
139,505.00 |
50.50 |
140,900.05 |
62.00 |
172,986.20 |
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
200.0 |
TON |
70.00 |
14,000.00 |
95.00 |
19,000.00 |
62.00 |
12,400.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
25,000.00 |
25,000.00 |
8,000.00 |
8,000.00 |
8,000.00 |
8,000.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
1.350 |
MILE |
275.00 |
371.25 |
350.00 |
472.50 |
200.00 |
270.00 |
|
|
| 724-01-A |
pavement patching (6" minimum thickness)
|
100   |
SQYD |
10.00 |
1,000.00 |
54.00 |
5,400.00 |
40.00 |
4,000.00 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
500   |
SQYD |
10.00 |
5,000.00 |
64.00 |
32,000.00 |
45.00 |
22,500.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
26,000.00 |
26,000.00 |
27,000.00 |
27,000.00 |
30,000.00 |
30,000.00 |
|
|
| 729-19-C |
dead end road installations(type c)
|
1   |
EACH |
500.00 |
500.00 |
550.00 |
550.00 |
500.00 |
500.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
178   |
EACH |
7.00 |
1,246.00 |
7.00 |
1,246.00 |
6.00 |
1,068.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
4.120 |
MILE |
3,000.00 |
12,360.00 |
2,500.00 |
10,300.00 |
2,200.00 |
9,064.00 |
|
|
| 732-04-E |
plastic pavement legends & symbols (school crossing)
|
2   |
EACH |
500.00 |
1,000.00 |
500.00 |
1,000.00 |
500.00 |
1,000.00 |
|
|
| 735-01 |
mailboxes
|
6   |
EACH |
1.00 |
6.00 |
1.00 |
6.00 |
1.00 |
6.00 |
|
|
| 735-02 |
mailbox supports (single)
|
6   |
EACH |
100.00 |
600.00 |
100.00 |
600.00 |
120.00 |
720.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
12,000.00 |
12,000.00 |
1,000.00 |
1,000.00 |
5,000.00 |
5,000.00 |
|
|
| S-001 |
variable message sign unit
|
2   |
EACH |
4,000.00 |
8,000.00 |
4,000.00 |
8,000.00 |
1,800.00 |
3,600.00 |
|
|
| S-002 |
cold planing tie-ins
|
200   |
SQYD |
1.00 |
200.00 |
30.00 |
6,000.00 |
35.00 |
7,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
274,588.25 |
|
282,327.55 |
|
308,496.20 |
|
|
|