Lead Project: 819-13-0006
Parish: E FELICIANA
Routes: LA 956
Description: LA 412 - LA 19
Type Const: grading, cement treated base course, superpave asphaltic concrete overlay and related
work.
 
RankLicenseBidderAmount
102214 W. E. BLAIN & SONS, INC. $880,966.96
200046 BARBER BROS. CONTRACTING CO., L.L.C $939,505.50
300849 F.G. SULLIVAN, JR. CONTRACTOR LLC $986,465.45
412487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,023,351.85
 
Item Number Item Description Quantity Unit of Measure - 1 -
W. E. BLAIN & SONS, INC.
- 2 -
BARBER BROS. CONTRACTING CO., L.L.C
- 3 -
F.G. SULLIVAN, JR. CONTRACTOR LLC
- 4 -
DIAMOND B CONSTRUCTION CO., L.L.C.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 53      SQYD 33.00 1,749.00 50.00 2,650.00 25.00 1,325.00 36.80 1,950.40
203-08 borrow (vehicular measurement) 1,000      CUYD 17.50 17,500.00 10.00 10,000.00 10.00 10,000.00 11.20 11,200.00
203-08-A borrow (vehicular meas.)(selected soils) 600      CUYD 9.50 5,700.00 10.00 6,000.00 10.00 6,000.00 11.20 6,720.00
401-02 aggregate surface course (adjusted vehicular
measurement)
1,671      CUYD 32.50 54,307.50 25.00 41,775.00 30.00 50,130.00 34.67 57,933.57
502-01 superpave asphaltic concrete 10,434.9    TON 43.00 448,700.70 46.00 480,005.40 44.00 459,135.60 52.03 542,927.84
502-01-A superpave asphaltic concrete, paved drives and
turnouts
270.0    TON 76.00 20,520.00 65.00 17,550.00 78.00 21,060.00 142.67 38,520.90
713-01 temporary signs & barricades lump      LUMP 17,000.00 17,000.00 15,000.00 15,000.00 35,000.00 35,000.00 4,935.40 4,935.40
713-03-E temporary pavement markings (24" width) 66      LNFT 0.90 59.40 1.00 66.00 0.80 52.80 0.96 63.36
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
12.000  MILE 420.00 5,040.00 300.00 3,600.00 350.00 4,200.00 150.00 1,800.00
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
0.792  MILE 295.00 233.64 300.00 237.60 100.00 79.20 314.00 248.68
713-05-A temporary pavement markings (solid line)(4" width) 19.604  MILE 422.00 8,272.88 300.00 5,881.20 100.00 1,960.40 450.00 8,821.80
722-01 project site laboratory 1      EACH 5,700.00 5,700.00 10,000.00 10,000.00 1,000.00 1,000.00 2,850.00 2,850.00
727-01 mobilization lump      LUMP 36,000.00 36,000.00 50,000.00 50,000.00 35,000.00 35,000.00 17,700.00 17,700.00
729-16-B object marker assembly (type 2) 4      EACH 70.00 280.00 50.00 200.00 50.00 200.00 70.00 280.00
729-16-C object marker assembly (type 3) 20      EACH 100.00 2,000.00 70.00 1,400.00 60.00 1,200.00 70.00 1,400.00
731-02 reflectorized raised pavement markers 613      EACH 5.10 3,126.30 6.00 3,678.00 4.50 2,758.50 5.44 3,334.72
732-01-E plastic pavement striping (24" width) 22      LNFT 2.94 64.68 4.00 88.00 2.50 55.00 3.14 69.08
732-02-A plastic pavement striping (solid line) (4" width) 15.736  MILE 1,760.00 27,695.36 2,000.00 31,472.00 1,600.00 25,177.60 1,880.00 29,583.68
732-03-A plastic pavement striping (broken line)(4" width) 0.264  MILE 750.00 198.00 825.00 217.80 750.00 198.00 790.00 208.56
735-01 mailboxes 19      EACH 1.00 19.00 2.00 38.00 5.00 95.00 13.00 247.00
735-02 mailbox supports (single) 19      EACH 115.00 2,185.00 120.00 2,280.00 135.00 2,565.00 257.00 4,883.00
739-01 hydro-seeding 2.90   ACRE 975.00 2,827.50 1,200.00 3,480.00 1,200.00 3,480.00 1,025.00 2,972.50
740-01 construction layout lump      LUMP 5,000.00 5,000.00 10,000.00 10,000.00 25,000.00 25,000.00 20,220.00 20,220.00
S-001 cement treated base course (12 in depth) 54,197      SQYD 4.00 216,788.00 4.50 243,886.50 5.55 300,793.35 4.88 264,481.36
                       
 CONTRACTOR TOTAL       880,966.96   939,505.50   986,465.45   1,023,351.85