Lead Project: 737-94-0032
Parish: BOSSIER, CADDO
Routes: I-20
Description: DISTRICT 04 INTERSTATE GUARD RAIL UPGRADE
Type Const: guard rail replacement and related work.
 
RankLicenseBidderAmount
134068 ALPHA SERVICE AND PRODUCTS, INC. $1,636,323.60
223811 UNITED RENTALS HWY TECHNOLOGIES INC $2,584,002.20
27043 JACK B. HARPER CONTRACTOR, INC. IRREGULAR
 
Item Number Item Description Quantity Unit of Measure - 1 -
ALPHA SERVICE AND PRODUCTS, INC.
- 2 -
UNITED RENTALS HWY TECHNOLOGIES INC

JACK B. HARPER CONTRACTOR, INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 16,165      LNFT 3.00 48,495.00 5.50 88,907.50 3.00 48,495.00    
202-02-I removal of sand barrel attenuators 14      EACH 900.00 12,600.00 2,000.00 28,000.00 800.00 11,200.00    
203-08 borrow (vehicular measurement) 34,635      CUYD 12.50 432,937.50 25.00 865,875.00 12.00 415,620.00    
204-06 temporary silt fencing 12,000      LNFT 1.50 18,000.00 2.25 27,000.00 1.50 18,000.00    
502-01-A superpave asphaltic concrete, paved drives and
turnouts
2,519.3    TON 100.00 251,930.00 185.00 466,070.50 150.00 377,895.00    
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 702.5    LNFT 25.00 17,562.50 30.00 21,075.00 31.00 21,777.50    
704-01-C guard rail (double thrie beam)(3'-1 1/2" post spacing) 956.4    LNFT 40.00 38,256.00 42.00 40,168.80 45.00 43,038.00    
704-03 blocked out guard rail 16,240.6    LNFT 14.50 235,488.70 15.50 251,729.30 15.00 243,609.00    
704-06 guard rail anchor sections (trailing end) 94.1    LNFT 64.00 6,022.40 62.00 5,834.20 70.00 6,587.00    
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
194.8    LNFT 75.00 14,610.00 68.00 13,246.40 80.00 15,584.00    
704-07-A guard rail bridge attachments (single thrie beam) 1,028.0    LNFT 30.00 30,840.00 28.00 28,784.00 45.00 46,260.00    
704-08-B guard rail transitions (double thrie beam) 1,287.5    LNFT 39.00 50,212.50 39.00 50,212.50 50.00 64,375.00    
704-10 guard rail anchor block 16      EACH 700.00 11,200.00 1,650.00 26,400.00 500.00 8,000.00    
704-11-A guard rail end treatment (flared) 59      EACH 1,650.00 97,350.00 1,650.00 97,350.00 1,600.00 94,400.00    
704-11-B guard rail end treatment (tangent) 31      EACH 2,100.00 65,100.00 1,950.00 60,450.00 2,000.00 62,000.00    
713-01 temporary signs & barricades lump      LUMP 70,000.00 70,000.00 100,000.00 100,000.00 15,000.00 15,000.00    
716-01-B mulch (fiber) 4.00   ACRE 1,050.00 4,200.00 1,000.00 4,000.00 450.00 1,800.00    
727-01 mobilization lump      LUMP 90,000.00 90,000.00 200,000.00 200,000.00 25,000.00 25,000.00    
729-16-C object marker assembly (type 3) 143      EACH 65.00 9,295.00 65.00 9,295.00 85.00 12,155.00    
739-01 hydro-seeding 4.00   ACRE 1,250.00 5,000.00 1,350.00 5,400.00 757.00 3,028.00    
740-01 construction layout lump      LUMP 15,000.00 15,000.00 50,000.00 50,000.00 15,000.00 15,000.00    
S-101 pier protection system 2      EACH 25,000.00 50,000.00 31,000.00 62,000.00 32,000.00 64,000.00    
S-102 impact attenuators (kinetic) 1      EACH 18,000.00 18,000.00 22,500.00 22,500.00 15,000.00 15,000.00    
S-103 barrier rail rehabilitation 632      LNFT 32.00 20,224.00 47.00 29,704.00 30.00 18,960.00    
S-104 variable message sign unit 2      ea 12,000.00 24,000.00 15,000.00 30,000.00 10,000.00 20,000.00    
                       
 CONTRACTOR TOTAL       1,636,323.60   2,584,002.20   IRREGULAR    