| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - ALPHA SERVICE AND PRODUCTS, INC. |
- 2 - UNITED RENTALS HWY TECHNOLOGIES INC |
JACK B. HARPER CONTRACTOR, INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
16,165   |
LNFT |
3.00 |
48,495.00 |
5.50 |
88,907.50 |
3.00 |
48,495.00 |
|
|
| 202-02-I |
removal of sand barrel attenuators
|
14   |
EACH |
900.00 |
12,600.00 |
2,000.00 |
28,000.00 |
800.00 |
11,200.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
34,635   |
CUYD |
12.50 |
432,937.50 |
25.00 |
865,875.00 |
12.00 |
415,620.00 |
|
|
| 204-06 |
temporary silt fencing
|
12,000   |
LNFT |
1.50 |
18,000.00 |
2.25 |
27,000.00 |
1.50 |
18,000.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
2,519.3 |
TON |
100.00 |
251,930.00 |
185.00 |
466,070.50 |
150.00 |
377,895.00 |
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
702.5 |
LNFT |
25.00 |
17,562.50 |
30.00 |
21,075.00 |
31.00 |
21,777.50 |
|
|
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
956.4 |
LNFT |
40.00 |
38,256.00 |
42.00 |
40,168.80 |
45.00 |
43,038.00 |
|
|
| 704-03 |
blocked out guard rail
|
16,240.6 |
LNFT |
14.50 |
235,488.70 |
15.50 |
251,729.30 |
15.00 |
243,609.00 |
|
|
| 704-06 |
guard rail anchor sections (trailing end)
|
94.1 |
LNFT |
64.00 |
6,022.40 |
62.00 |
5,834.20 |
70.00 |
6,587.00 |
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
194.8 |
LNFT |
75.00 |
14,610.00 |
68.00 |
13,246.40 |
80.00 |
15,584.00 |
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
1,028.0 |
LNFT |
30.00 |
30,840.00 |
28.00 |
28,784.00 |
45.00 |
46,260.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
1,287.5 |
LNFT |
39.00 |
50,212.50 |
39.00 |
50,212.50 |
50.00 |
64,375.00 |
|
|
| 704-10 |
guard rail anchor block
|
16   |
EACH |
700.00 |
11,200.00 |
1,650.00 |
26,400.00 |
500.00 |
8,000.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
59   |
EACH |
1,650.00 |
97,350.00 |
1,650.00 |
97,350.00 |
1,600.00 |
94,400.00 |
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
31   |
EACH |
2,100.00 |
65,100.00 |
1,950.00 |
60,450.00 |
2,000.00 |
62,000.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
70,000.00 |
70,000.00 |
100,000.00 |
100,000.00 |
15,000.00 |
15,000.00 |
|
|
| 716-01-B |
mulch (fiber)
|
4.00 |
ACRE |
1,050.00 |
4,200.00 |
1,000.00 |
4,000.00 |
450.00 |
1,800.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
90,000.00 |
90,000.00 |
200,000.00 |
200,000.00 |
25,000.00 |
25,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
143   |
EACH |
65.00 |
9,295.00 |
65.00 |
9,295.00 |
85.00 |
12,155.00 |
|
|
| 739-01 |
hydro-seeding
|
4.00 |
ACRE |
1,250.00 |
5,000.00 |
1,350.00 |
5,400.00 |
757.00 |
3,028.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
50,000.00 |
50,000.00 |
15,000.00 |
15,000.00 |
|
|
| S-101 |
pier protection system
|
2   |
EACH |
25,000.00 |
50,000.00 |
31,000.00 |
62,000.00 |
32,000.00 |
64,000.00 |
|
|
| S-102 |
impact attenuators (kinetic)
|
1   |
EACH |
18,000.00 |
18,000.00 |
22,500.00 |
22,500.00 |
15,000.00 |
15,000.00 |
|
|
| S-103 |
barrier rail rehabilitation
|
632   |
LNFT |
32.00 |
20,224.00 |
47.00 |
29,704.00 |
30.00 |
18,960.00 |
|
|
| S-104 |
variable message sign unit
|
2   |
ea |
12,000.00 |
24,000.00 |
15,000.00 |
30,000.00 |
10,000.00 |
20,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,636,323.60 |
|
2,584,002.20 |
|
IRREGULAR |
|
|
|