Letting of 11/17/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 737-94-0028
Parish: CADDO, BOSSIER
Routes: I-20
Description: SHREVEPORT/BOSSIER CITY ITS DEPLOYMENT NEAR TERM PHASE 1
Type Const: installation of cctv video cameras, radar vehicle detectors, dynamic message signs,
its hub sites, and related work.
 
RankLicenseBidderAmount
135541 MASTEC NORTH AMERICA INC $5,983,480.26
207764 GRADY CRAWFORD CONST. CO., INC. $7,490,688.20
 
Item Number Item Description Quantity Unit of Measure - 1 -
MASTEC NORTH AMERICA INC
- 2 -
GRADY CRAWFORD CONST. CO., INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 15,400.00 15,400.00 10,000.00 10,000.00        
203-06 excavation & embankment lump      LUMP 27,800.00 27,800.00 205,000.00 205,000.00        
502-03 superpave asphaltic concrete (2" thick) 2,604      SQYD 21.45 55,855.80 28.00 72,912.00        
509-01 cold planing asphaltic pavement 2,604      SQYD 16.00 41,664.00 13.00 33,852.00        
509-02 contractor retained reclaimed asphaltic pavement - 147      CUYD 0.01 - 1.47 1.00 - 147.00        
704-01-C guard rail (double thrie beam)(3'-1 1/2" post spacing) 263.0    LNFT 44.00 11,572.00 47.00 12,361.00        
704-03 blocked out guard rail 657.0    LNFT 16.00 10,512.00 21.00 13,797.00        
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
44.0    LNFT 82.50 3,630.00 97.00 4,268.00        
704-11-A guard rail end treatment (flared) 7      EACH 1,800.00 12,600.00 2,300.00 16,100.00        
706-03-C incidental concrete paving (6" thick) 3,603.3    SQYD 51.45 185,389.78 56.00 201,784.80        
713-01 temporary signs & barricades lump      LUMP 49,500.00 49,500.00 175,000.00 175,000.00        
713-08 temporary precast concrete barrier (contractor
furnished)
350      EACH 775.00 271,250.00 800.00 280,000.00        
716-01-A mulch (vegetative) 2.10   ACRE 645.00 1,354.50 1,100.00 2,310.00        
717-01 seeding 111      LB 10.80 1,198.80 20.00 2,220.00        
718-01 fertilizer 1,551      LB 3.25 5,040.75 0.60 930.60        
727-01 mobilization lump      LUMP 146,300.00 146,300.00 280,000.00 280,000.00        
729-16-C object marker assembly (type 3) 7      EACH 74.00 518.00 104.00 728.00        
736-10 underground junction box (type "e") 3      EACH 1,600.00 4,800.00 1,500.00 4,500.00        
740-01 construction layout lump      LUMP 9,500.00 9,500.00 25,000.00 25,000.00        
S-001-01 cctv camera site # 1 - i-20 east of i-220 lump      LUMP 34,000.00 34,000.00 40,000.00 40,000.00        
S-001-02 cctv camera site # 2 - i-20 at monkhouse dr. lump      LUMP 34,000.00 34,000.00 40,000.00 40,000.00        
S-001-03 cctv camera site # 3 - i-20 at jewella ave. lump      LUMP 34,000.00 34,000.00 40,000.00 40,000.00        
S-001-04 cctv camera site # 4 - i-20 at hearne ave. lump      LUMP 34,000.00 34,000.00 40,000.00 40,000.00        
S-001-05 cctv camera site # 5 - i-20 at greenwood rd. (us 79) lump      LUMP 34,000.00 34,000.00 40,000.00 40,000.00        
S-001-06 cctv camera site # 6 - i-20 at lakeshore dr. lump      LUMP 34,000.00 34,000.00 40,000.00 40,000.00        
S-001-07 cctv camera site # 7 - i-20 at linwood ave. lump      LUMP 30,000.00 30,000.00 37,000.00 37,000.00        
S-001-08 cctv camera site # 8 - i-20 at i-49 lump      LUMP 34,000.00 34,000.00 40,000.00 40,000.00        
S-001-09 cctv camera site # 9 - i-20 at sam fertitta dr. lump      LUMP 34,000.00 34,000.00 40,000.00 40,000.00        
S-001-10 cctv camera site # 10 - i-20 at common st. lump      LUMP 34,000.00 34,000.00 40,000.00 40,000.00        
S-001-11 cctv camera site # 11 - i-20 at spring st. lump      LUMP 34,000.00 34,000.00 40,000.00 40,000.00        
S-001-12 cctv camera site # 12 - i-20 at riverside dr. lump      LUMP 34,000.00 34,000.00 40,000.00 40,000.00        
S-001-13 cctv camera site # 13 - i-20 at benton rd. lump      LUMP 34,000.00 34,000.00 40,000.00 40,000.00        
S-001-14 cctv camera site # 14 - i-20 at barksdale ave. lump      LUMP 34,000.00 34,000.00 40,000.00 40,000.00        
S-001-15 cctv camera site # 15 - i-20 at old minden rd. lump      LUMP 34,000.00 34,000.00 40,000.00 40,000.00        
S-001-16 cctv camera site # 16 - i-20 at airline dr. lump      LUMP 34,000.00 34,000.00 40,000.00 40,000.00        
S-001-17 cctv camera site # 17 - i-20 at industrial dr. lump      LUMP 32,000.00 32,000.00 39,000.00 39,000.00        
S-002-01 rvd site # 1 - i-20 eastbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-02 rvd site # 2 - i-20 eastbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-03 rvd site # 3 - i-20 westbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-04 rvd site # 4 - i-20 eastbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-05 rvd site # 5 - i-20 westbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-06 rvd site # 6 - i-20 eastbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-07 rvd site # 7 - i-20 westbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-08 rvd site # 8 - i-20 eastbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-09 rvd site # 9 - i-20 westbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-10 rvd site # 10 - i-20 eastbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-11 rvd site # 11 - i-20 westbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-12 rvd site # 12 - i-20 eastbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-13 rvd site # 13 - i-20 westbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-14 rvd site # 14 - i-20 eastbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-15 rvd site # 15 - i-20 westbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-16 rvd site # 16 - i-20 eastbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-17 rvd site # 17 - i-20 westbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-18 rvd site # 18 - i-20 eastbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-19 rvd site # 19 - i-20 westbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-20 rvd site # 20 - i-20 eastbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-21 rvd site # 21 - i-20 westbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-22 rvd site # 22 - i-20 westbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-23 rvd site # 23 - i-20 eastbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-24 rvd site # 24 - i-20 westbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-25 rvd site # 25 - i-20 eastbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-26 rvd site # 26 - i-20 westbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-27 rvd site # 27 - i-20 eastbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-28 rvd site # 28 - i-20 eastbound off ramp to linwood
ave.
lump      LUMP 11,400.00 11,400.00 20,000.00 20,000.00        
S-002-29 rvd site # 29 - i-20 eastbound and westbound (2 units) lump      LUMP 15,730.00 15,730.00 25,000.00 25,000.00        
S-002-30 rvd site # 30 - i-20 westbound lump      LUMP 11,400.00 11,400.00 20,000.00 20,000.00        
S-002-31 rvd site # 31 - i-20 westbound on ramp from i-49 (new
40' rvd pole)
lump      LUMP 21,000.00 21,000.00 32,000.00 32,000.00        
S-002-32 rvd site # 32 - i-20 eastbound off ramp to i-49 lump      LUMP 11,400.00 11,400.00 20,000.00 20,000.00        
S-002-33 rvd site # 33 - i-20 westbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-34 rvd site # 34 - i-20 westbound off ramp to i-49 lump      LUMP 11,400.00 11,400.00 20,000.00 20,000.00        
S-002-35 rvd site # 35 - i-20 eastbound lump      LUMP 11,400.00 11,400.00 20,000.00 20,000.00        
S-002-36 rvd site # 36 - i-20 eastbound off ramp to common
st./line ave.
lump      LUMP 11,400.00 11,400.00 20,000.00 20,000.00        
S-002-37 rvd site # 37 - i-20 westbound lump      LUMP 11,400.00 11,400.00 20,000.00 20,000.00        
S-002-38 rvd site # 38 - i-20 eastbound lump      LUMP 11,400.00 11,400.00 20,000.00 20,000.00        
S-002-39 rvd site # 39 - i-20 eastbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-40 rvd site # 40 - i-20 westbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-41 rvd site # 41 - i-20 westbound off ramp to la 1 lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-42 rvd site # 42 - i-20 eastbound on ramp from la 1 (new
60' rvd pole)
lump      LUMP 24,000.00 24,000.00 36,000.00 36,000.00        
S-002-43 rvd site # 43 - i-20 westbound on ramp from traffic
st.
lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-44 rvd site # 44 - i-20 eastbound off ramp to traffic st. lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-45 rvd site # 45 - i-20 westbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-46 rvd site # 46 - i-20 eastbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-47 rvd site # 47 - i-20 westbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-48 rvd site # 48 - i-20 eastbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-49 rvd site # 49 - i-20 eastbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-50 rvd site # 50 - i-20 westbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-51 rvd site # 51 - i-20 eastbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-52 rvd site # 52 - i-20 westbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-53 rvd site # 53 - i-20 eastbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-54 rvd site # 54 - i-20 westbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-55 rvd site # 55 - i-20 eastbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-56 rvd site # 56 - i-20 westbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-57 rvd site # 57 - i-20 eastbound lump      LUMP 12,300.00 12,300.00 20,000.00 20,000.00        
S-002-58 rvd site # 58 - i-20 eastbound and westbound (2 units) lump      LUMP 16,500.00 16,500.00 25,000.00 25,000.00        
S-002-59 rvd site # 59 - i-20 eastbound and westbound (2 units) lump      LUMP 16,500.00 16,500.00 25,000.00 25,000.00        
S-002-60 rvd site # 60 - i-20 eastbound and westbound (2 units) lump      LUMP 16,500.00 16,500.00 25,000.00 25,000.00        
S-002-61 rvd site # 61 - i-20 eastbound and westbound (2 units) lump      LUMP 16,500.00 16,500.00 25,000.00 25,000.00        
S-002-62 master rvd transceiver - its cabinet #2, dms site #1 lump      LUMP 9,600.00 9,600.00 4,100.00 4,100.00        
S-002-63 master rvd transceiver - its cabinet #8, cctv camera
site #5
lump      LUMP 3,400.00 3,400.00 4,100.00 4,100.00        
S-002-64 master rvd transceiver - its cabinet #14, cctv camera
site #9
lump      LUMP 3,400.00 3,400.00 4,100.00 4,100.00        
S-002-65 master rvd transceiver - its cabinet #21, cctv camera
site #14
lump      LUMP 3,400.00 3,400.00 4,100.00 4,100.00        
S-002-66 master rvd transceiver - its cabinet #24, dms site #8 lump      LUMP 9,600.00 9,600.00 4,100.00 4,100.00        
S-003-01 dms site # 1 - i-20 westbound, west of monkhouse dr. lump      LUMP 140,000.00 140,000.00 205,000.00 205,000.00        
S-003-02 dms site # 2 - i-20 eastbound, west of broadway st. lump      LUMP 140,000.00 140,000.00 205,000.00 205,000.00        
S-003-03 dms site # 3 - i-20 eastbound, east of hearne ave. lump      LUMP 140,000.00 140,000.00 205,000.00 205,000.00        
S-003-04 dms site # 4 - i-20 westbound, east of lakeshore dr. lump      LUMP 140,000.00 140,000.00 205,000.00 205,000.00        
S-003-05 dms site # 5 - i-20 eastbound, west of linwood ave. lump      LUMP 140,000.00 140,000.00 205,000.00 205,000.00        
S-003-06 dms site # 6 - i-20 westbound, west of common st. lump      LUMP 140,000.00 140,000.00 205,000.00 205,000.00        
S-003-07 dms site # 7 - i-20 eastbound, east of riverside dr. lump      LUMP 140,000.00 140,000.00 205,000.00 205,000.00        
S-003-08 dms site # 8 - i-20 westbound, west of industrial dr. lump      LUMP 140,000.00 140,000.00 205,000.00 205,000.00        
S-005-01 node site #1 - its cabinet #6 1      EACH 99,000.00 99,000.00 3,500.00 3,500.00        
S-005-02 node site #2 - its cabinet #24 1      EACH 99,000.00 99,000.00 3,500.00 3,500.00        
S-006-01 single mode optical fiber cable - 48 count 73,700      LNFT 1.50 110,550.00 1.95 143,715.00        
S-006-02 single mode optical fiber cable - 24 count 7,200      LNFT 1.40 10,080.00 1.65 11,880.00        
S-006-03-A single mode optical fiber drop cable - 12 count 4,695      LNFT 1.15 5,399.25 1.50 7,042.50        
S-006-03-B single mode optical fiber drop cable - 6 count 7,745      LNFT 1.80 13,941.00 1.45 11,230.25        
S-006-04 optical fiber patch cord 75      ea 60.00 4,500.00 85.00 6,375.00        
S-006-05-A electrical power conductors - camera - 2 #8 xhhwn &
1 #8 ground
6,415      LNFT 1.40 8,981.00 2.90 18,603.50        
S-006-05-B electrical power conductors - dms - 3 #8 xhhwn &
1 #8 ground
770      LNFT 1.85 1,424.50 3.70 2,849.00        
S-006-05-C electrical power conductors - dms - 3 #2 xhhwn &
1 #8 ground
1,785      LNFT 4.00 7,140.00 5.90 10,531.50        
S-006-06-A backbone construction - directional bored conduit 9,812      LNFT 34.70 340,476.40 40.50 397,386.00        
S-006-06-B backbone construction - directional bored conduit with
power conduit
795      LNFT 33.00 26,235.00 43.50 34,582.50        
S-006-07-A backbone construction - trenched and backfilled
conduit
53,034      LNFT 11.90 631,104.60 10.00 530,340.00        
S-006-07-B backbone construction - trenched and backfilled
conduit with power conduit
1,461      LNFT 11.25 16,436.25 11.00 16,071.00        
S-006-08 backbone construction - structure mounted conduit 2,640      LNFT 148.00 390,720.00 60.00 158,400.00        
S-006-09 power construction - directional bored conduit 1,010      LNFT 11.55 11,665.50 12.00 12,120.00        
S-006-10 power construction - trenched and backfilled conduit 2,890      LNFT 5.80 16,762.00 5.00 14,450.00        
S-006-11-A drop cable device build-out construction - directional
bored conduit
2,320      LNFT 26.00 60,320.00 25.45 59,044.00        
S-006-11-B drop cable device build-out construction - directional
bored conduit with power conduit
1,097      LNFT 28.00 30,716.00 28.45 31,209.65        
S-006-12-A drop cable device build-out construction - trenched
and backfilled conduit
2,362      LNFT 7.80 18,423.60 8.95 21,139.90        
S-006-12-B drop cable device build-out construction - trenched
and backfilled conduit with power conduit
616      LNFT 11.00 6,776.00 9.50 5,852.00        
S-006-13 splice closure 40      ea 670.00 26,800.00 1,750.00 70,000.00        
S-006-14 underground handhole/pullbox 201      ea 1,430.00 287,430.00 2,000.00 402,000.00        
S-006-15 structure mounted pullbox/junction box 2      ea 560.00 1,120.00 2,500.00 5,000.00        
S-006-16-A power service 25      ea 1,970.00 49,250.00 1,500.00 37,500.00        
S-006-16-B transformer pad 1      ea 2,200.00 2,200.00 3,000.00 3,000.00        
S-006-16-C meter rack 1      ea 1,000.00 1,000.00 2,500.00 2,500.00        
S-006-16-D 25' class 6 meter pole 9      ea 335.00 3,015.00 350.00 3,150.00        
S-006-16-E 35' class 5 meter pole 8      ea 450.00 3,600.00 450.00 3,600.00        
S-006-17 ethernet switch 1      ea 134,000.00 134,000.00 5,000.00 5,000.00        
S-006-18 its termination cabinet 1a 1      ea 8,100.00 8,100.00 14,500.00 14,500.00        
S-006-19 ladotd district 04 materials and installation lump      LUMP 28,000.00 28,000.00 170,000.00 170,000.00        
S-006-20 city of shreveport traffic engineering building
materials and installation
lump      LUMP 28,000.00 28,000.00 85,000.00 85,000.00        
S-006-21 computer 2      ea 3,400.00 6,800.00 4,000.00 8,000.00        
S-008-01 spare parts, tools, and test equipment lump      LUMP 92,000.00 92,000.00 96,500.00 96,500.00        
S-008-02 training lump      LUMP 18,000.00 18,000.00 25,000.00 25,000.00        
S-008-03 documentation lump      LUMP 4,500.00 4,500.00 25,000.00 25,000.00        
S-009-01 extended maintenance lump      LUMP 21,000.00 21,000.00 85,000.00 85,000.00        
                       
 CONTRACTOR TOTAL       5,983,480.26   7,490,688.20        