| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MASTEC NORTH AMERICA INC |
- 2 - GRADY CRAWFORD CONST. CO., INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
15,400.00 |
15,400.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
27,800.00 |
27,800.00 |
205,000.00 |
205,000.00 |
|
|
|
|
| 502-03 |
superpave asphaltic concrete (2" thick)
|
2,604   |
SQYD |
21.45 |
55,855.80 |
28.00 |
72,912.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
2,604   |
SQYD |
16.00 |
41,664.00 |
13.00 |
33,852.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 147   |
CUYD |
0.01 |
- 1.47 |
1.00 |
- 147.00 |
|
|
|
|
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
263.0 |
LNFT |
44.00 |
11,572.00 |
47.00 |
12,361.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
657.0 |
LNFT |
16.00 |
10,512.00 |
21.00 |
13,797.00 |
|
|
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
44.0 |
LNFT |
82.50 |
3,630.00 |
97.00 |
4,268.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
7   |
EACH |
1,800.00 |
12,600.00 |
2,300.00 |
16,100.00 |
|
|
|
|
| 706-03-C |
incidental concrete paving (6" thick)
|
3,603.3 |
SQYD |
51.45 |
185,389.78 |
56.00 |
201,784.80 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
49,500.00 |
49,500.00 |
175,000.00 |
175,000.00 |
|
|
|
|
| 713-08 |
temporary precast concrete barrier (contractor
furnished) |
350   |
EACH |
775.00 |
271,250.00 |
800.00 |
280,000.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
2.10 |
ACRE |
645.00 |
1,354.50 |
1,100.00 |
2,310.00 |
|
|
|
|
| 717-01 |
seeding
|
111   |
LB |
10.80 |
1,198.80 |
20.00 |
2,220.00 |
|
|
|
|
| 718-01 |
fertilizer
|
1,551   |
LB |
3.25 |
5,040.75 |
0.60 |
930.60 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
146,300.00 |
146,300.00 |
280,000.00 |
280,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
7   |
EACH |
74.00 |
518.00 |
104.00 |
728.00 |
|
|
|
|
| 736-10 |
underground junction box (type "e")
|
3   |
EACH |
1,600.00 |
4,800.00 |
1,500.00 |
4,500.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
9,500.00 |
9,500.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| S-001-01 |
cctv camera site # 1 - i-20 east of i-220
|
lump |
LUMP |
34,000.00 |
34,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| S-001-02 |
cctv camera site # 2 - i-20 at monkhouse dr.
|
lump |
LUMP |
34,000.00 |
34,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| S-001-03 |
cctv camera site # 3 - i-20 at jewella ave.
|
lump |
LUMP |
34,000.00 |
34,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| S-001-04 |
cctv camera site # 4 - i-20 at hearne ave.
|
lump |
LUMP |
34,000.00 |
34,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| S-001-05 |
cctv camera site # 5 - i-20 at greenwood rd. (us 79)
|
lump |
LUMP |
34,000.00 |
34,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| S-001-06 |
cctv camera site # 6 - i-20 at lakeshore dr.
|
lump |
LUMP |
34,000.00 |
34,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| S-001-07 |
cctv camera site # 7 - i-20 at linwood ave.
|
lump |
LUMP |
30,000.00 |
30,000.00 |
37,000.00 |
37,000.00 |
|
|
|
|
| S-001-08 |
cctv camera site # 8 - i-20 at i-49
|
lump |
LUMP |
34,000.00 |
34,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| S-001-09 |
cctv camera site # 9 - i-20 at sam fertitta dr.
|
lump |
LUMP |
34,000.00 |
34,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| S-001-10 |
cctv camera site # 10 - i-20 at common st.
|
lump |
LUMP |
34,000.00 |
34,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| S-001-11 |
cctv camera site # 11 - i-20 at spring st.
|
lump |
LUMP |
34,000.00 |
34,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| S-001-12 |
cctv camera site # 12 - i-20 at riverside dr.
|
lump |
LUMP |
34,000.00 |
34,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| S-001-13 |
cctv camera site # 13 - i-20 at benton rd.
|
lump |
LUMP |
34,000.00 |
34,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| S-001-14 |
cctv camera site # 14 - i-20 at barksdale ave.
|
lump |
LUMP |
34,000.00 |
34,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| S-001-15 |
cctv camera site # 15 - i-20 at old minden rd.
|
lump |
LUMP |
34,000.00 |
34,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| S-001-16 |
cctv camera site # 16 - i-20 at airline dr.
|
lump |
LUMP |
34,000.00 |
34,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| S-001-17 |
cctv camera site # 17 - i-20 at industrial dr.
|
lump |
LUMP |
32,000.00 |
32,000.00 |
39,000.00 |
39,000.00 |
|
|
|
|
| S-002-01 |
rvd site # 1 - i-20 eastbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-02 |
rvd site # 2 - i-20 eastbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-03 |
rvd site # 3 - i-20 westbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-04 |
rvd site # 4 - i-20 eastbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-05 |
rvd site # 5 - i-20 westbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-06 |
rvd site # 6 - i-20 eastbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-07 |
rvd site # 7 - i-20 westbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-08 |
rvd site # 8 - i-20 eastbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-09 |
rvd site # 9 - i-20 westbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-10 |
rvd site # 10 - i-20 eastbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-11 |
rvd site # 11 - i-20 westbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-12 |
rvd site # 12 - i-20 eastbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-13 |
rvd site # 13 - i-20 westbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-14 |
rvd site # 14 - i-20 eastbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-15 |
rvd site # 15 - i-20 westbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-16 |
rvd site # 16 - i-20 eastbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-17 |
rvd site # 17 - i-20 westbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-18 |
rvd site # 18 - i-20 eastbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-19 |
rvd site # 19 - i-20 westbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-20 |
rvd site # 20 - i-20 eastbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-21 |
rvd site # 21 - i-20 westbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-22 |
rvd site # 22 - i-20 westbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-23 |
rvd site # 23 - i-20 eastbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-24 |
rvd site # 24 - i-20 westbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-25 |
rvd site # 25 - i-20 eastbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-26 |
rvd site # 26 - i-20 westbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-27 |
rvd site # 27 - i-20 eastbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-28 |
rvd site # 28 - i-20 eastbound off ramp to linwood
ave. |
lump |
LUMP |
11,400.00 |
11,400.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-29 |
rvd site # 29 - i-20 eastbound and westbound (2 units)
|
lump |
LUMP |
15,730.00 |
15,730.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| S-002-30 |
rvd site # 30 - i-20 westbound
|
lump |
LUMP |
11,400.00 |
11,400.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-31 |
rvd site # 31 - i-20 westbound on ramp from i-49 (new
40' rvd pole) |
lump |
LUMP |
21,000.00 |
21,000.00 |
32,000.00 |
32,000.00 |
|
|
|
|
| S-002-32 |
rvd site # 32 - i-20 eastbound off ramp to i-49
|
lump |
LUMP |
11,400.00 |
11,400.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-33 |
rvd site # 33 - i-20 westbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-34 |
rvd site # 34 - i-20 westbound off ramp to i-49
|
lump |
LUMP |
11,400.00 |
11,400.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-35 |
rvd site # 35 - i-20 eastbound
|
lump |
LUMP |
11,400.00 |
11,400.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-36 |
rvd site # 36 - i-20 eastbound off ramp to common
st./line ave. |
lump |
LUMP |
11,400.00 |
11,400.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-37 |
rvd site # 37 - i-20 westbound
|
lump |
LUMP |
11,400.00 |
11,400.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-38 |
rvd site # 38 - i-20 eastbound
|
lump |
LUMP |
11,400.00 |
11,400.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-39 |
rvd site # 39 - i-20 eastbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-40 |
rvd site # 40 - i-20 westbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-41 |
rvd site # 41 - i-20 westbound off ramp to la 1
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-42 |
rvd site # 42 - i-20 eastbound on ramp from la 1 (new
60' rvd pole) |
lump |
LUMP |
24,000.00 |
24,000.00 |
36,000.00 |
36,000.00 |
|
|
|
|
| S-002-43 |
rvd site # 43 - i-20 westbound on ramp from traffic
st. |
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-44 |
rvd site # 44 - i-20 eastbound off ramp to traffic st.
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-45 |
rvd site # 45 - i-20 westbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-46 |
rvd site # 46 - i-20 eastbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-47 |
rvd site # 47 - i-20 westbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-48 |
rvd site # 48 - i-20 eastbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-49 |
rvd site # 49 - i-20 eastbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-50 |
rvd site # 50 - i-20 westbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-51 |
rvd site # 51 - i-20 eastbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-52 |
rvd site # 52 - i-20 westbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-53 |
rvd site # 53 - i-20 eastbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-54 |
rvd site # 54 - i-20 westbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-55 |
rvd site # 55 - i-20 eastbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-56 |
rvd site # 56 - i-20 westbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-57 |
rvd site # 57 - i-20 eastbound
|
lump |
LUMP |
12,300.00 |
12,300.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002-58 |
rvd site # 58 - i-20 eastbound and westbound (2 units)
|
lump |
LUMP |
16,500.00 |
16,500.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| S-002-59 |
rvd site # 59 - i-20 eastbound and westbound (2 units)
|
lump |
LUMP |
16,500.00 |
16,500.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| S-002-60 |
rvd site # 60 - i-20 eastbound and westbound (2 units)
|
lump |
LUMP |
16,500.00 |
16,500.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| S-002-61 |
rvd site # 61 - i-20 eastbound and westbound (2 units)
|
lump |
LUMP |
16,500.00 |
16,500.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| S-002-62 |
master rvd transceiver - its cabinet #2, dms site #1
|
lump |
LUMP |
9,600.00 |
9,600.00 |
4,100.00 |
4,100.00 |
|
|
|
|
| S-002-63 |
master rvd transceiver - its cabinet #8, cctv camera
site #5 |
lump |
LUMP |
3,400.00 |
3,400.00 |
4,100.00 |
4,100.00 |
|
|
|
|
| S-002-64 |
master rvd transceiver - its cabinet #14, cctv camera
site #9 |
lump |
LUMP |
3,400.00 |
3,400.00 |
4,100.00 |
4,100.00 |
|
|
|
|
| S-002-65 |
master rvd transceiver - its cabinet #21, cctv camera
site #14 |
lump |
LUMP |
3,400.00 |
3,400.00 |
4,100.00 |
4,100.00 |
|
|
|
|
| S-002-66 |
master rvd transceiver - its cabinet #24, dms site #8
|
lump |
LUMP |
9,600.00 |
9,600.00 |
4,100.00 |
4,100.00 |
|
|
|
|
| S-003-01 |
dms site # 1 - i-20 westbound, west of monkhouse dr.
|
lump |
LUMP |
140,000.00 |
140,000.00 |
205,000.00 |
205,000.00 |
|
|
|
|
| S-003-02 |
dms site # 2 - i-20 eastbound, west of broadway st.
|
lump |
LUMP |
140,000.00 |
140,000.00 |
205,000.00 |
205,000.00 |
|
|
|
|
| S-003-03 |
dms site # 3 - i-20 eastbound, east of hearne ave.
|
lump |
LUMP |
140,000.00 |
140,000.00 |
205,000.00 |
205,000.00 |
|
|
|
|
| S-003-04 |
dms site # 4 - i-20 westbound, east of lakeshore dr.
|
lump |
LUMP |
140,000.00 |
140,000.00 |
205,000.00 |
205,000.00 |
|
|
|
|
| S-003-05 |
dms site # 5 - i-20 eastbound, west of linwood ave.
|
lump |
LUMP |
140,000.00 |
140,000.00 |
205,000.00 |
205,000.00 |
|
|
|
|
| S-003-06 |
dms site # 6 - i-20 westbound, west of common st.
|
lump |
LUMP |
140,000.00 |
140,000.00 |
205,000.00 |
205,000.00 |
|
|
|
|
| S-003-07 |
dms site # 7 - i-20 eastbound, east of riverside dr.
|
lump |
LUMP |
140,000.00 |
140,000.00 |
205,000.00 |
205,000.00 |
|
|
|
|
| S-003-08 |
dms site # 8 - i-20 westbound, west of industrial dr.
|
lump |
LUMP |
140,000.00 |
140,000.00 |
205,000.00 |
205,000.00 |
|
|
|
|
| S-005-01 |
node site #1 - its cabinet #6
|
1   |
EACH |
99,000.00 |
99,000.00 |
3,500.00 |
3,500.00 |
|
|
|
|
| S-005-02 |
node site #2 - its cabinet #24
|
1   |
EACH |
99,000.00 |
99,000.00 |
3,500.00 |
3,500.00 |
|
|
|
|
| S-006-01 |
single mode optical fiber cable - 48 count
|
73,700   |
LNFT |
1.50 |
110,550.00 |
1.95 |
143,715.00 |
|
|
|
|
| S-006-02 |
single mode optical fiber cable - 24 count
|
7,200   |
LNFT |
1.40 |
10,080.00 |
1.65 |
11,880.00 |
|
|
|
|
| S-006-03-A |
single mode optical fiber drop cable - 12 count
|
4,695   |
LNFT |
1.15 |
5,399.25 |
1.50 |
7,042.50 |
|
|
|
|
| S-006-03-B |
single mode optical fiber drop cable - 6 count
|
7,745   |
LNFT |
1.80 |
13,941.00 |
1.45 |
11,230.25 |
|
|
|
|
| S-006-04 |
optical fiber patch cord
|
75   |
ea |
60.00 |
4,500.00 |
85.00 |
6,375.00 |
|
|
|
|
| S-006-05-A |
electrical power conductors - camera - 2 #8 xhhwn &
1 #8 ground |
6,415   |
LNFT |
1.40 |
8,981.00 |
2.90 |
18,603.50 |
|
|
|
|
| S-006-05-B |
electrical power conductors - dms - 3 #8 xhhwn &
1 #8 ground |
770   |
LNFT |
1.85 |
1,424.50 |
3.70 |
2,849.00 |
|
|
|
|
| S-006-05-C |
electrical power conductors - dms - 3 #2 xhhwn &
1 #8 ground |
1,785   |
LNFT |
4.00 |
7,140.00 |
5.90 |
10,531.50 |
|
|
|
|
| S-006-06-A |
backbone construction - directional bored conduit
|
9,812   |
LNFT |
34.70 |
340,476.40 |
40.50 |
397,386.00 |
|
|
|
|
| S-006-06-B |
backbone construction - directional bored conduit with
power conduit |
795   |
LNFT |
33.00 |
26,235.00 |
43.50 |
34,582.50 |
|
|
|
|
| S-006-07-A |
backbone construction - trenched and backfilled
conduit |
53,034   |
LNFT |
11.90 |
631,104.60 |
10.00 |
530,340.00 |
|
|
|
|
| S-006-07-B |
backbone construction - trenched and backfilled
conduit with power conduit |
1,461   |
LNFT |
11.25 |
16,436.25 |
11.00 |
16,071.00 |
|
|
|
|
| S-006-08 |
backbone construction - structure mounted conduit
|
2,640   |
LNFT |
148.00 |
390,720.00 |
60.00 |
158,400.00 |
|
|
|
|
| S-006-09 |
power construction - directional bored conduit
|
1,010   |
LNFT |
11.55 |
11,665.50 |
12.00 |
12,120.00 |
|
|
|
|
| S-006-10 |
power construction - trenched and backfilled conduit
|
2,890   |
LNFT |
5.80 |
16,762.00 |
5.00 |
14,450.00 |
|
|
|
|
| S-006-11-A |
drop cable device build-out construction - directional
bored conduit |
2,320   |
LNFT |
26.00 |
60,320.00 |
25.45 |
59,044.00 |
|
|
|
|
| S-006-11-B |
drop cable device build-out construction - directional
bored conduit with power conduit |
1,097   |
LNFT |
28.00 |
30,716.00 |
28.45 |
31,209.65 |
|
|
|
|
| S-006-12-A |
drop cable device build-out construction - trenched
and backfilled conduit |
2,362   |
LNFT |
7.80 |
18,423.60 |
8.95 |
21,139.90 |
|
|
|
|
| S-006-12-B |
drop cable device build-out construction - trenched
and backfilled conduit with power conduit |
616   |
LNFT |
11.00 |
6,776.00 |
9.50 |
5,852.00 |
|
|
|
|
| S-006-13 |
splice closure
|
40   |
ea |
670.00 |
26,800.00 |
1,750.00 |
70,000.00 |
|
|
|
|
| S-006-14 |
underground handhole/pullbox
|
201   |
ea |
1,430.00 |
287,430.00 |
2,000.00 |
402,000.00 |
|
|
|
|
| S-006-15 |
structure mounted pullbox/junction box
|
2   |
ea |
560.00 |
1,120.00 |
2,500.00 |
5,000.00 |
|
|
|
|
| S-006-16-A |
power service
|
25   |
ea |
1,970.00 |
49,250.00 |
1,500.00 |
37,500.00 |
|
|
|
|
| S-006-16-B |
transformer pad
|
1   |
ea |
2,200.00 |
2,200.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| S-006-16-C |
meter rack
|
1   |
ea |
1,000.00 |
1,000.00 |
2,500.00 |
2,500.00 |
|
|
|
|
| S-006-16-D |
25' class 6 meter pole
|
9   |
ea |
335.00 |
3,015.00 |
350.00 |
3,150.00 |
|
|
|
|
| S-006-16-E |
35' class 5 meter pole
|
8   |
ea |
450.00 |
3,600.00 |
450.00 |
3,600.00 |
|
|
|
|
| S-006-17 |
ethernet switch
|
1   |
ea |
134,000.00 |
134,000.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| S-006-18 |
its termination cabinet 1a
|
1   |
ea |
8,100.00 |
8,100.00 |
14,500.00 |
14,500.00 |
|
|
|
|
| S-006-19 |
ladotd district 04 materials and installation
|
lump |
LUMP |
28,000.00 |
28,000.00 |
170,000.00 |
170,000.00 |
|
|
|
|
| S-006-20 |
city of shreveport traffic engineering building
materials and installation |
lump |
LUMP |
28,000.00 |
28,000.00 |
85,000.00 |
85,000.00 |
|
|
|
|
| S-006-21 |
computer
|
2   |
ea |
3,400.00 |
6,800.00 |
4,000.00 |
8,000.00 |
|
|
|
|
| S-008-01 |
spare parts, tools, and test equipment
|
lump |
LUMP |
92,000.00 |
92,000.00 |
96,500.00 |
96,500.00 |
|
|
|
|
| S-008-02 |
training
|
lump |
LUMP |
18,000.00 |
18,000.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| S-008-03 |
documentation
|
lump |
LUMP |
4,500.00 |
4,500.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| S-009-01 |
extended maintenance
|
lump |
LUMP |
21,000.00 |
21,000.00 |
85,000.00 |
85,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
5,983,480.26 |
|
7,490,688.20 |
|
|
|
|
|