| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GILCHRIST CONSTRUCTION CO. LLC |
- 2 - JAMES CONSTRUCTION GROUP LLC |
- 3 - GILBERT SOUTHERN CORP |
- 4 - MERRICK CONSTRUCTION CO. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
800,000.00 |
800,000.00 |
650,000.00 |
650,000.00 |
420,000.00 |
420,000.00 |
1,375,000.00 |
1,375,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
12,000.00 |
12,000.00 |
30,000.00 |
30,000.00 |
156,000.00 |
156,000.00 |
25,000.00 |
25,000.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
4,793.1 |
sq m |
5.00 |
23,965.50 |
7.00 |
33,551.70 |
8.00 |
38,344.80 |
3.60 |
17,255.16 |
| 202-02-H |
removal of guard rail
|
56   |
ln m |
35.00 |
1,960.00 |
10.00 |
560.00 |
17.85 |
999.60 |
FREE |
FREE |
| 202-02-01 |
removal of 9.5 m x 8.9 m wood frame residence (rt. of
sta. 3+125) (contains non-friable asbestos) |
1   |
ea |
1,500.00 |
1,500.00 |
1,000.00 |
1,000.00 |
1,400.00 |
1,400.00 |
10,000.00 |
10,000.00 |
| 202-02-02 |
removal of 11.3 m x 9.6 m wood frame residence (rt. of
sta. 3+200) (contains non-friable asbestos) |
1   |
ea |
1,500.00 |
1,500.00 |
1,000.00 |
1,000.00 |
1,900.00 |
1,900.00 |
10,000.00 |
10,000.00 |
| 202-02-03 |
removal of 13.0 m x 7.0 m cinder block garage (rt. of
sta. 3+300) (contains non-friable asbestos) |
1   |
ea |
1,500.00 |
1,500.00 |
1,000.00 |
1,000.00 |
1,500.00 |
1,500.00 |
10,000.00 |
10,000.00 |
| 202-02-04 |
removal of 17.7 m x 9.3 m wood frame residence (rt. of
sta. 3+315) (contains non-friable asbestos) |
1   |
ea |
1,500.00 |
1,500.00 |
2,000.00 |
2,000.00 |
3,000.00 |
3,000.00 |
10,000.00 |
10,000.00 |
| 202-02-05 |
removal of 9.0 m x 9.0 m wood frame residence (rt. of
sta. 3+345) (contain non-friable asbestos) |
1   |
ea |
1,500.00 |
1,500.00 |
1,000.00 |
1,000.00 |
1,500.00 |
1,500.00 |
10,000.00 |
10,000.00 |
| 202-02-06 |
removal of 6.3 m x 4.2 m wood frame garage (rt. of
sta. 3+362) (contains non-friable asbestos) |
1   |
ea |
400.00 |
400.00 |
100.00 |
100.00 |
100.00 |
100.00 |
10,000.00 |
10,000.00 |
| 202-02-07 |
removal of 14.0 m x 8.0 m wood frame residence (rt. of
sta. 3+375) (contains non-friable asbestos) |
1   |
ea |
1,500.00 |
1,500.00 |
1,000.00 |
1,000.00 |
1,800.00 |
1,800.00 |
10,000.00 |
10,000.00 |
| 202-02-08 |
removal of 19.0 m x 22.0 m brick residence on slab
(lt. of sta. 5+450) |
1   |
ea |
7,000.00 |
7,000.00 |
3,000.00 |
3,000.00 |
6,000.00 |
6,000.00 |
10,000.00 |
10,000.00 |
| 202-02-09 |
removal of 25.0 m x 9.2 m brick residence on slab (lt.
of sta. 5+748) (contains non-friable asbestos) |
1   |
ea |
7,000.00 |
7,000.00 |
2,000.00 |
2,000.00 |
4,600.00 |
4,600.00 |
10,000.00 |
10,000.00 |
| 202-02-10 |
removal of 5.9 m x 7.4 m wood frame residence (lt. of
sta. 6+337) (contains non-friable asbestos) |
1   |
ea |
1,500.00 |
1,500.00 |
500.00 |
500.00 |
1,000.00 |
1,000.00 |
10,000.00 |
10,000.00 |
| 202-02-11 |
removal of 9.4 m x 16.7 m wood frame residence (c/l of
sta. 10+168) |
1   |
ea |
1,500.00 |
1,500.00 |
1,000.00 |
1,000.00 |
3,400.00 |
3,400.00 |
10,000.00 |
10,000.00 |
| 202-02-12 |
removal of 12.9 m x 8.0 m wood frame residence (c/l of
sta. 11+332) (contains non-friable asbestos) |
1   |
ea |
1,500.00 |
1,500.00 |
500.00 |
500.00 |
2,000.00 |
2,000.00 |
10,000.00 |
10,000.00 |
| 202-02-13 |
removal of 11.9 m x 13.1 m wood frame commercial
building (rt. of sta. 11+350) |
1   |
ea |
1,500.00 |
1,500.00 |
500.00 |
500.00 |
2,600.00 |
2,600.00 |
500.00 |
500.00 |
| 202-02-14 |
removal of 23.5 m x 9.9 m brick residence on slab (lt.
of sta. 11+687) (contains non-friable asbestos) |
1   |
ea |
3,000.00 |
3,000.00 |
1,000.00 |
1,000.00 |
4,800.00 |
4,800.00 |
10,000.00 |
10,000.00 |
| 202-02-15 |
removal of 23.8 m x 7.0 m brick residence on slab (lt.
of sta. 11+835) |
1   |
ea |
7,000.00 |
7,000.00 |
1,000.00 |
1,000.00 |
4,300.00 |
4,300.00 |
10,000.00 |
10,000.00 |
| 202-02-16 |
removal of 21.7 m x 8.7 m wood/stone residence on slab
(lt. of sta. 11+912)(contains non-friable asbestos) |
1   |
ea |
7,000.00 |
7,000.00 |
1,000.00 |
1,000.00 |
4,600.00 |
4,600.00 |
10,000.00 |
10,000.00 |
| 202-02-17 |
removal of 30.5 m x 12.5 m metal barn (lt. of sta.
11+990) |
1   |
ea |
3,000.00 |
3,000.00 |
500.00 |
500.00 |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
| 202-02-18 |
removal of 25.6 m x 10.0 m brick residence on slab
(lt. of sta. 13+488) |
1   |
ea |
7,000.00 |
7,000.00 |
2,000.00 |
2,000.00 |
5,500.00 |
5,500.00 |
10,000.00 |
10,000.00 |
| 202-02-19 |
removal of 23. 1 m x 9.8 m brick residence on slab
(c/l of sta. 13+932) (contains non-friable asbestos) |
1   |
ea |
7,000.00 |
7,000.00 |
2,000.00 |
2,000.00 |
4,900.00 |
4,900.00 |
10,000.00 |
10,000.00 |
| 202-02-20 |
removal of 15.0 m x 14.0 m wood frame residence (rt.
of sta. 14+020) (contains non-friable asbestos) |
1   |
ea |
1,500.00 |
1,500.00 |
500.00 |
500.00 |
3,800.00 |
3,800.00 |
10,000.00 |
10,000.00 |
| 203-01 |
general excavation
|
1,172,697   |
cu m |
2.30 |
2,697,203.10 |
2.10 |
2,462,663.70 |
3.00 |
3,518,091.00 |
2.00 |
2,345,394.00 |
| 203-02 |
drainage excavation
|
15,419   |
cu m |
5.00 |
77,095.00 |
2.10 |
32,379.90 |
3.50 |
53,966.50 |
8.00 |
123,352.00 |
| 203-04 |
embankment
|
901,352   |
cu m |
2.40 |
2,163,244.80 |
2.25 |
2,028,042.00 |
3.90 |
3,515,272.80 |
3.20 |
2,884,326.40 |
| 203-05 |
nonplastic embankment (stone)
|
6,973   |
cu m |
72.00 |
502,056.00 |
72.00 |
502,056.00 |
68.00 |
474,164.00 |
70.00 |
488,110.00 |
| 204-02 |
temporary hay or straw bales
|
140   |
ea |
25.00 |
3,500.00 |
15.00 |
2,100.00 |
6.50 |
910.00 |
3.00 |
420.00 |
| 204-03 |
temporary slope drains
|
3,398   |
ln m |
15.00 |
50,970.00 |
7.00 |
23,786.00 |
51.45 |
174,827.10 |
1.00 |
3,398.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
86   |
ea |
300.00 |
25,800.00 |
150.00 |
12,900.00 |
80.00 |
6,880.00 |
10.00 |
860.00 |
| 204-05-B |
temporary sediment check dams (stone)
|
29   |
ea |
1,000.00 |
29,000.00 |
500.00 |
14,500.00 |
367.50 |
10,657.50 |
25.00 |
725.00 |
| 204-06 |
temporary silt fencing
|
9,025   |
ln m |
3.50 |
31,587.50 |
4.00 |
36,100.00 |
4.00 |
36,100.00 |
1.00 |
9,025.00 |
| 204-07 |
temporary stone construction entrance
|
4   |
ea |
2,000.00 |
8,000.00 |
500.00 |
2,000.00 |
1,575.00 |
6,300.00 |
200.00 |
800.00 |
| 302-02-E |
class ii base course (stone)( 200 mm thick)
|
44,322.4 |
sq m |
16.00 |
709,158.40 |
18.00 |
797,803.20 |
18.00 |
797,803.20 |
15.00 |
664,836.00 |
| 302-02-F |
class ii base course (stone)( 225 mm thick)
|
136,578.2 |
sq m |
17.00 |
2,321,829.40 |
19.00 |
2,594,985.80 |
21.00 |
2,868,142.20 |
16.00 |
2,185,251.20 |
| 304-01 |
lime
|
484.00 |
Mg |
25.00 |
12,100.00 |
120.00 |
58,080.00 |
100.00 |
48,400.00 |
50.00 |
24,200.00 |
| 304-04-D |
lime treatment (type d) (300 mm thick)
|
31,635   |
sq m |
0.10 |
3,163.50 |
1.00 |
31,635.00 |
1.50 |
47,452.50 |
0.25 |
7,908.75 |
| 401-01 |
aggregate surface course (net section)
|
465.3 |
cu m |
75.00 |
34,897.50 |
65.00 |
30,244.50 |
113.00 |
52,578.90 |
60.00 |
27,918.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
300.0 |
cu m |
150.00 |
45,000.00 |
50.00 |
15,000.00 |
80.00 |
24,000.00 |
40.00 |
12,000.00 |
| 701-01-I |
cross drain pipe (600 mm rcp)
|
562.5 |
ln m |
155.00 |
87,187.50 |
123.00 |
69,187.50 |
167.00 |
93,937.50 |
150.00 |
84,375.00 |
| 701-01-I-01 |
cross drain pipe (600 mm rcp)(class iv)
|
75.5 |
ln m |
195.00 |
14,722.50 |
152.00 |
11,476.00 |
192.00 |
14,496.00 |
200.00 |
15,100.00 |
| 701-01-K |
cross drain pipe (750 mm rcp)
|
196.0 |
ln m |
200.00 |
39,200.00 |
160.00 |
31,360.00 |
195.00 |
38,220.00 |
200.00 |
39,200.00 |
| 701-01-M |
cross drain pipe (900 mm rcp)
|
34.0 |
ln m |
260.00 |
8,840.00 |
205.00 |
6,970.00 |
250.00 |
8,500.00 |
250.00 |
8,500.00 |
| 701-01-M-01 |
cross drain pipe (900 mm rcp)(class iv)
|
70.0 |
ln m |
300.00 |
21,000.00 |
240.00 |
16,800.00 |
290.00 |
20,300.00 |
300.00 |
21,000.00 |
| 701-01-O-01 |
cross drain pipe (1200 mm rcp)(class iv)
|
204.0 |
ln m |
470.00 |
95,880.00 |
370.00 |
75,480.00 |
415.00 |
84,660.00 |
400.00 |
81,600.00 |
| 701-01-Q-01 |
cross drain pipe (1500 mm rcp)(class iv)
|
153.5 |
ln m |
650.00 |
99,775.00 |
505.00 |
77,517.50 |
555.00 |
85,192.50 |
650.00 |
99,775.00 |
| 701-01-Q-02 |
cross drain pipe (1500 mm rcp)(class v)
|
365.0 |
ln m |
700.00 |
255,500.00 |
550.00 |
200,750.00 |
690.00 |
251,850.00 |
700.00 |
255,500.00 |
| 701-01-U-02 |
cross drain pipe (2100 mm rcp)(class v)
|
188.0 |
ln m |
1,250.00 |
235,000.00 |
1,150.00 |
216,200.00 |
1,200.00 |
225,600.00 |
1,300.00 |
244,400.00 |
| 701-05-G |
side drain pipe (450 mm)
|
194.0 |
ln m |
80.00 |
15,520.00 |
98.00 |
19,012.00 |
155.00 |
30,070.00 |
100.00 |
19,400.00 |
| 701-05-I |
side drain pipe (600 mm)
|
100.0 |
ln m |
165.00 |
16,500.00 |
115.00 |
11,500.00 |
167.00 |
16,700.00 |
150.00 |
15,000.00 |
| 701-05-I-01 |
side drain pipe (600 mm)(erosion)
|
36.0 |
ln m |
170.00 |
6,120.00 |
160.00 |
5,760.00 |
165.00 |
5,940.00 |
150.00 |
5,400.00 |
| 701-05-K |
side drain pipe (750 mm)
|
107.0 |
ln m |
175.00 |
18,725.00 |
165.00 |
17,655.00 |
195.00 |
20,865.00 |
175.00 |
18,725.00 |
| 701-05-Q |
side drain pipe (1500 mm)
|
20.0 |
ln m |
475.00 |
9,500.00 |
350.00 |
7,000.00 |
425.00 |
8,500.00 |
350.00 |
7,000.00 |
| 702-02-F |
manholes (mh-01m)
|
1   |
ea |
6,000.00 |
6,000.00 |
3,500.00 |
3,500.00 |
3,600.00 |
3,600.00 |
5,000.00 |
5,000.00 |
| 702-03-A |
catch basins (cb-01m)
|
3   |
ea |
3,000.00 |
9,000.00 |
2,500.00 |
7,500.00 |
3,100.00 |
9,300.00 |
4,000.00 |
12,000.00 |
| 702-03-B |
catch basins (cb-02m)
|
1   |
ea |
4,000.00 |
4,000.00 |
5,500.00 |
5,500.00 |
4,000.00 |
4,000.00 |
8,000.00 |
8,000.00 |
| 702-03-E |
catch basins (cb-03m)
|
2   |
ea |
3,000.00 |
6,000.00 |
2,200.00 |
4,400.00 |
3,650.00 |
7,300.00 |
2,000.00 |
4,000.00 |
| 702-03-I |
catch basins (r-cb-38)
|
2   |
ea |
8,000.00 |
16,000.00 |
7,500.00 |
15,000.00 |
4,100.00 |
8,200.00 |
10,000.00 |
20,000.00 |
| 702-03-J |
catch basins (special detail-sta. 9+844)
|
1   |
ea |
12,000.00 |
12,000.00 |
16,500.00 |
16,500.00 |
63,000.00 |
63,000.00 |
15,000.00 |
15,000.00 |
| 702-05-A |
cross drain end treatment (1 barrel, 600 mm rcp)
|
25   |
ea |
1,000.00 |
25,000.00 |
600.00 |
15,000.00 |
1,500.00 |
37,500.00 |
1,000.00 |
25,000.00 |
| 702-05-B |
cross drain end treatment (1 barrel, 750 mm rcp)
|
3   |
ea |
1,400.00 |
4,200.00 |
850.00 |
2,550.00 |
2,400.00 |
7,200.00 |
1,000.00 |
3,000.00 |
| 702-05-C |
cross drain end treatment (1 barrel, 900 mm rcp)
|
4   |
ea |
2,000.00 |
8,000.00 |
1,200.00 |
4,800.00 |
3,220.00 |
12,880.00 |
1,200.00 |
4,800.00 |
| 702-05-D |
cross drain end treatment (1 barrel, 1200 mm rcp)
|
4   |
ea |
2,400.00 |
9,600.00 |
2,500.00 |
10,000.00 |
4,700.00 |
18,800.00 |
1,500.00 |
6,000.00 |
| 702-05-E |
cross drain end treatment (1 barrel, 1500 mm rcp)
|
7   |
ea |
4,200.00 |
29,400.00 |
3,100.00 |
21,700.00 |
6,600.00 |
46,200.00 |
2,000.00 |
14,000.00 |
| 702-05-F |
cross drain end treatment (2 barrels, 750 mm rcp)
|
2   |
ea |
2,000.00 |
4,000.00 |
1,700.00 |
3,400.00 |
3,700.00 |
7,400.00 |
1,500.00 |
3,000.00 |
| 702-05-G |
cross drain end treatment (2 barrels, 2100 mm rcp)
|
1   |
ea |
9,500.00 |
9,500.00 |
8,000.00 |
8,000.00 |
18,000.00 |
18,000.00 |
3,000.00 |
3,000.00 |
| 704-03 |
blocked out guard rail
|
100.97 |
ln m |
60.00 |
6,058.20 |
55.00 |
5,553.35 |
55.00 |
5,553.35 |
50.00 |
5,048.50 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
15.24 |
ln m |
160.00 |
2,438.40 |
150.00 |
2,286.00 |
150.00 |
2,286.00 |
150.00 |
2,286.00 |
| 704-11-A |
guard rail end treatment (flared)
|
2   |
ea |
2,000.00 |
4,000.00 |
2,000.00 |
4,000.00 |
1,850.00 |
3,700.00 |
1,800.00 |
3,600.00 |
| 705-01 |
barbed wire fence
|
8,737   |
ln m |
15.50 |
135,423.50 |
15.00 |
131,055.00 |
16.40 |
143,286.80 |
15.00 |
131,055.00 |
| 705-04 |
single swinging driveway gates
|
15   |
ea |
300.00 |
4,500.00 |
500.00 |
7,500.00 |
300.00 |
4,500.00 |
500.00 |
7,500.00 |
| 708-01 |
right-of-way monument
|
87   |
ea |
250.00 |
21,750.00 |
90.00 |
7,830.00 |
100.00 |
8,700.00 |
5.00 |
435.00 |
| 708-02 |
right-of-way monument witness post
|
87   |
ea |
250.00 |
21,750.00 |
90.00 |
7,830.00 |
140.00 |
12,180.00 |
10.00 |
870.00 |
| 709-01 |
steel cattle guard
|
1   |
ea |
15,000.00 |
15,000.00 |
10,000.00 |
10,000.00 |
12,500.00 |
12,500.00 |
5,000.00 |
5,000.00 |
| 711-01-C |
riprap (15 kg, 360 mm thick)
|
4,163   |
sq m |
45.00 |
187,335.00 |
46.00 |
191,498.00 |
36.00 |
149,868.00 |
30.00 |
124,890.00 |
| 711-01-D |
riprap (25 kg, 450 mm thick)
|
399   |
sq m |
46.00 |
18,354.00 |
65.00 |
25,935.00 |
40.00 |
15,960.00 |
35.00 |
13,965.00 |
| 711-04 |
geotextile fabric
|
5,601   |
sq m |
2.00 |
11,202.00 |
2.50 |
14,002.50 |
1.60 |
8,961.60 |
1.00 |
5,601.00 |
| 712-01-C |
concrete cast-in-place revetment (150 mm thick)
|
64   |
sq m |
60.00 |
3,840.00 |
55.00 |
3,520.00 |
175.00 |
11,200.00 |
32.00 |
2,048.00 |
| 712-04 |
flexible revetment
|
1,039   |
sq m |
45.00 |
46,755.00 |
50.00 |
51,950.00 |
58.00 |
60,262.00 |
32.00 |
33,248.00 |
| 713-01 |
temporary signs & barricades
|
lump |
lump |
100,000.00 |
100,000.00 |
60,000.00 |
60,000.00 |
50,000.00 |
50,000.00 |
300,000.00 |
300,000.00 |
| 716-01-A |
mulch (vegetative)
|
87.1 |
hctr |
1,400.00 |
121,940.00 |
1,250.00 |
108,875.00 |
1,350.00 |
117,585.00 |
1,400.00 |
121,940.00 |
| 717-01 |
seeding
|
2,851   |
kg |
12.00 |
34,212.00 |
16.00 |
45,616.00 |
13.25 |
37,775.75 |
12.00 |
34,212.00 |
| 718-01 |
fertilizer
|
95,032   |
kg |
0.60 |
57,019.20 |
0.50 |
47,516.00 |
0.42 |
39,913.44 |
0.45 |
42,764.40 |
| 720-01-A |
erosion control system, slope protection (type a)
|
36,688   |
sq m |
1.25 |
45,860.00 |
1.30 |
47,694.40 |
1.10 |
40,356.80 |
1.00 |
36,688.00 |
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
3,656   |
sq m |
1.75 |
6,398.00 |
1.30 |
4,752.80 |
2.00 |
7,312.00 |
1.40 |
5,118.40 |
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
22,904   |
sq m |
1.75 |
40,082.00 |
1.30 |
29,775.20 |
2.00 |
45,808.00 |
1.40 |
32,065.60 |
| 720-01-E |
erosion control system, flexible channel liner (type e)
|
4,168   |
sq m |
2.75 |
11,462.00 |
1.30 |
5,418.40 |
2.50 |
10,420.00 |
5.00 |
20,840.00 |
| 720-01-F |
erosion control system, flexible channel liner (type f)
|
3,852   |
sq m |
2.75 |
10,593.00 |
1.30 |
5,007.60 |
2.50 |
9,630.00 |
5.00 |
19,260.00 |
| 722-02 |
project site laboratory (equipped)
|
1   |
ea |
24,000.00 |
24,000.00 |
20,000.00 |
20,000.00 |
6,500.00 |
6,500.00 |
10,000.00 |
10,000.00 |
| 726-01 |
bedding material
|
2,578.4 |
cu m |
60.00 |
154,704.00 |
65.00 |
167,596.00 |
37.00 |
95,400.80 |
50.00 |
128,920.00 |
| 727-01 |
mobilization
|
lump |
lump |
1,600,000.00 |
1,600,000.00 |
2,000,000.00 |
2,000,000.00 |
1,904,000.00 |
1,904,000.00 |
2,000,000.00 |
2,000,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
72   |
ea |
80.00 |
5,760.00 |
78.00 |
5,616.00 |
78.00 |
5,616.00 |
78.00 |
5,616.00 |
| 729-19-C |
dead end road installation (type c)
|
2   |
ea |
750.00 |
1,500.00 |
700.00 |
1,400.00 |
700.00 |
1,400.00 |
500.00 |
1,000.00 |
| 731-02 |
reflectorized raised pavement markers
|
3,542   |
ea |
5.00 |
17,710.00 |
5.00 |
17,710.00 |
5.00 |
17,710.00 |
5.00 |
17,710.00 |
| 732-01-E |
plastic pavement striping (600 mm width)
|
1,616   |
ln m |
8.00 |
12,928.00 |
8.00 |
12,928.00 |
8.00 |
12,928.00 |
7.75 |
12,524.00 |
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
56.182 |
km |
1,200.00 |
67,418.40 |
1,200.00 |
67,418.40 |
1,111.00 |
62,418.20 |
1,200.00 |
67,418.40 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
11   |
ea |
150.00 |
1,650.00 |
135.00 |
1,485.00 |
150.00 |
1,650.00 |
135.00 |
1,485.00 |
| 732-05 |
removal of existing markings
|
12.088 |
km |
1,800.00 |
21,758.40 |
1,000.00 |
12,088.00 |
1,700.00 |
20,549.60 |
1,700.00 |
20,549.60 |
| 735-01 |
mailboxes
|
14   |
ea |
25.00 |
350.00 |
5.00 |
70.00 |
32.00 |
448.00 |
6.00 |
84.00 |
| 735-02 |
mailbox supports (single)
|
14   |
ea |
175.00 |
2,450.00 |
150.00 |
2,100.00 |
145.00 |
2,030.00 |
135.00 |
1,890.00 |
| 740-01 |
construction layout
|
lump |
lump |
200,000.00 |
200,000.00 |
100,000.00 |
100,000.00 |
150,000.00 |
150,000.00 |
400,000.00 |
400,000.00 |
| 744-01 |
traffic control management
|
lump |
lump |
24,000.00 |
24,000.00 |
5,000.00 |
5,000.00 |
50,000.00 |
50,000.00 |
400,000.00 |
400,000.00 |
| 804-01-C |
precast concrete piles (400 mm)
|
688.5 |
ln m |
135.00 |
92,947.50 |
175.00 |
120,487.50 |
270.00 |
185,895.00 |
165.00 |
113,602.50 |
| 804-09-A |
loading test piles (indicator piles)
|
1   |
ea |
2,500.00 |
2,500.00 |
2,500.00 |
2,500.00 |
45,000.00 |
45,000.00 |
100.00 |
100.00 |
| 804-10-A |
reloading test piles
|
1   |
ea |
100.00 |
100.00 |
100.00 |
100.00 |
10,000.00 |
10,000.00 |
100.00 |
100.00 |
| 804-11-A |
redriving test piles (indicator piles)
|
1   |
ea |
100.00 |
100.00 |
100.00 |
100.00 |
9,300.00 |
9,300.00 |
100.00 |
100.00 |
| 804-12 |
loading permanent piles
|
1   |
ea |
100.00 |
100.00 |
2,500.00 |
2,500.00 |
14,000.00 |
14,000.00 |
1,000.00 |
1,000.00 |
| 804-13 |
precast concrete indicator piles
|
1   |
ea |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
10,600.00 |
10,600.00 |
5,000.00 |
5,000.00 |
| 804-17 |
dynamic monitoring
|
2   |
ea |
1,500.00 |
3,000.00 |
1,000.00 |
2,000.00 |
4,700.00 |
9,400.00 |
3,000.00 |
6,000.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
167.96 |
cu m |
1,000.00 |
167,960.00 |
1,000.00 |
167,960.00 |
2,290.00 |
384,628.40 |
500.00 |
83,980.00 |
| 805-01-F |
class a concrete (bents)
|
50.56 |
cu m |
750.00 |
37,920.00 |
700.00 |
35,392.00 |
2,420.00 |
122,355.20 |
400.00 |
20,224.00 |
| 805-03 |
class aa concrete
|
219.52 |
cu m |
500.00 |
109,760.00 |
500.00 |
109,760.00 |
1,050.00 |
230,496.00 |
400.00 |
87,808.00 |
| 805-12-E |
reinforced concrete box culverts (1200 mm x 1200 mm)
|
297.00 |
ln m |
650.00 |
193,050.00 |
460.00 |
136,620.00 |
600.00 |
178,200.00 |
600.00 |
178,200.00 |
| 805-12-I |
reinforced concrete box culverts (1500 mm x 1500 mm)
|
318.00 |
ln m |
850.00 |
270,300.00 |
675.00 |
214,650.00 |
825.00 |
262,350.00 |
800.00 |
254,400.00 |
| 805-12-M |
reinforced concrete box culverts (1800 mm x 1800 mm)
|
236.60 |
ln m |
1,100.00 |
260,260.00 |
1,060.00 |
250,796.00 |
875.00 |
207,025.00 |
1,000.00 |
236,600.00 |
| 805-12-U |
reinforced concrete box culverts (3000 mm x 2400 mm)
|
114.00 |
ln m |
1,900.00 |
216,600.00 |
2,600.00 |
296,400.00 |
1,500.00 |
171,000.00 |
2,000.00 |
228,000.00 |
| 806-01 |
deformed reinforcing steel
|
36,257   |
kg |
1.60 |
58,011.20 |
1.50 |
54,385.50 |
1.35 |
48,946.95 |
0.95 |
34,444.15 |
| 810-01 |
concrete railing (type)
|
96.00 |
ln m |
155.00 |
14,880.00 |
125.00 |
12,000.00 |
310.00 |
29,760.00 |
150.00 |
14,400.00 |
| 813-01 |
concrete approach slabs
|
295.70 |
sq m |
150.00 |
44,355.00 |
165.00 |
48,790.50 |
186.00 |
55,000.20 |
75.00 |
22,177.50 |
| S-002 |
plugging existing water wells
|
3   |
ea |
3,200.00 |
9,600.00 |
1,500.00 |
4,500.00 |
2,100.00 |
6,300.00 |
500.00 |
1,500.00 |
| S-101 |
dynamic analysis
|
2   |
ea |
1,200.00 |
2,400.00 |
750.00 |
1,500.00 |
3,675.00 |
7,350.00 |
500.00 |
1,000.00 |
| | SUBTOTAL GENERAL |
|
|
|
15,222,645.50 |
|
14,976,973.95 |
|
18,574,817.19 |
|
16,719,322.56 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
|
|
|
|
|
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
6,929.9 |
Mg |
55.00 |
381,144.50 |
77.00 |
533,602.30 |
FREE |
FREE |
75.00 |
519,742.50 |
| 502-01-A |
superpave asphaltic concrete pavement, paved drives
and turnouts |
183.7 |
Mg |
125.00 |
22,962.50 |
120.00 |
22,044.00 |
FREE |
FREE |
120.00 |
22,044.00 |
| 601-01-I |
portland cement concrete pavement (225 mm thick)
|
98,274.4 |
sq m |
39.00 |
3,832,701.60 |
42.00 |
4,127,524.80 |
FREE |
FREE |
49.00 |
4,815,445.60 |
| 601-02-I |
portland cement concrete pavement (225 mm thick)
(crossovers & turnouts) |
21,473.0 |
sq m |
40.00 |
858,920.00 |
55.00 |
1,181,015.00 |
FREE |
FREE |
49.00 |
1,052,177.00 |
| 601-04 |
portland cement concrete pavement coring
|
160   |
ea |
100.00 |
16,000.00 |
100.00 |
16,000.00 |
FREE |
FREE |
100.00 |
16,000.00 |
| 732-03-A |
plastic pavement striping (broken line (100 mm width)
|
12.088 |
km |
500.00 |
6,044.00 |
500.00 |
6,044.00 |
FREE |
FREE |
500.00 |
6,044.00 |
| 732-03-A-01 |
plastic pavement striping (broken line)(100 mm width)
(preformed marking tape - type v) |
11.659 |
km |
2,100.00 |
24,483.90 |
2,050.00 |
23,900.95 |
FREE |
FREE |
2,050.00 |
23,900.95 |
| S-001 |
rumble strips (ground in)
|
10.7 |
km |
550.00 |
5,885.00 |
410.00 |
4,387.00 |
FREE |
FREE |
410.00 |
4,387.00 |
| | SUBTOTAL ALT A1 |
|
|
|
5,148,141.50 |
|
5,914,518.05 |
|
|
|
6,459,741.05 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
|
|
|
|
|
|
|
|
|
|
|
| 502-01 |
superpave asphalitc concrete
|
61,324.8 |
Mg |
0.00 |
0.00 |
0.00 |
0.00 |
58.00 |
3,556,838.40 |
0.00 |
0.00 |
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
12,072.2 |
Mg |
0.00 |
0.00 |
0.00 |
0.00 |
72.00 |
869,198.40 |
0.00 |
0.00 |
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
23.747 |
km |
0.00 |
0.00 |
0.00 |
0.00 |
425.00 |
10,092.47 |
0.00 |
0.00 |
| S-001 |
rumble strips (ground in)
|
21.4 |
km |
0.00 |
0.00 |
0.00 |
0.00 |
490.00 |
10,486.00 |
0.00 |
0.00 |
| | SUBTOTAL ALT A2 |
|
|
|
|
|
|
|
4,446,615.27 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
20,370,787.00 |
|
20,891,492.00 |
|
23,021,432.46 |
|
23,179,063.61 |
|